Digital Trust AllianceBudget 2027 Map

Home / Documents / MPIP 2027-2029

Major Public Investment Projects 2027-2029

Budget year 2027 · Ministry of Finance, Sri Lanka · 74 pages · File: 2027 - Major Public Investment Projects 2027-2029.pdf · Download the original file

Text converted from the original file. Table layout is approximate.

Previous document Next document

Find in every document: Digital Economy SLUDI DigiGov Data Protection SLCERT Cyber GovPay RAMIS Single Window e-GP ICTA Artificial Intelligence Head 186 Head 240 Audit Procurement

Pages cited on this site: 7 20 21 56 57 60 66

MPIP 2027-2029 · file page 1

MINISTRY OF FINANCE, PLANNING AND ECONOMIC DEVELOPMENT 
SRI LANKA 
12-11-2026 
2029 
MAJOR  
PUBLIC 
INVESTMENT 
PROJECTS 
2027
Next page Top

MPIP 2027-2029 · file page 2

No text on this page (image, chart or blank page).

Previous page Next page Top

MPIP 2027-2029 · file page 3

Preface 
 
“Major Public Investment Projects 2027–2029” presents the public investment projects recommended by the Public Investment Committee for inclusion in the 
Annual Budget Estimates for 2027. It provides details of ongoing and new projects with a Total Estimated Cost (TEC) exceeding Rs. 250 million. This 
publication is prepared in accordance with Section 20(2) of the Public Financial Management Act, No. 44 of 2024. 
 
It should be noted that certain public investment projects have been changed in nature at the implementation due to various reasons: the expected year of 
completion has been changed due temporary suspension, freezing the allocation and scope changes etc. change in total estimated cost as a result of exchange 
rate fluctuations, additional payments to be made due to suspension of projects, reimbursement of funds and restructuring of projects; budgetary allocation 
made to meet the financial commitment after the physical completion of the project. 
 
All values in the tables are in millions of rupees
Previous page Next page Top

MPIP 2027-2029 · file page 4

General Education………………………………………………………………………………………. 
1 
Higher Education………………………………………………………………………………………… 
5 
Vocational Education……………………………………………………………………………………. 
8 
Labour……………………………………………………………………………………………………. 
9 
Youth Affairs and Sports…………………………………………………………………………………. 
10 
Health……………………………………………………………………………………………………... 
11 
Religious, Culture and Heritage…………………………………………………………………………… 15 
Digital Economy…………………………………………………………………………………………. 
16 
Science and Technology…………………………………………………………………………………. 
18 
Agriculture………………………………………………………………………………………………. 
19 
Livestock…………………………………………………………………………………………………. 
21 
Plantation…………………………………………………………………………………………………. 
22 
Fisheries…………………………………………………………………………………………………. 
24 
Land……………………………………………………………………………………………………… 
26 
Industry, Trade and Investment Promotion………………………………………………………………. 
27 
Tourism……………………………………………………………………………………………………. 
29 
Transport…………………………………………………………………………………………………... 
30 
Highways…………………………………………………………………………………………………. 
33 
Ports and Civil Aviation…………………………………………………………………………………... 
37 
Irrigation…………………………………………………………………………………………………… 38 
Power & Energy…………………………………………………………………………………………… 40 
Water Supply and Sanitation………………………………………………………………………………. 42 
Housing……………………………………………………………………………………………………. 
47 
Urban Development………………………………………………………………………………………. 
48 
Governance………………………………………………………………………………………………… 51 
Environment and Disaster Management…………………………………………………………………. 
66 
Social Protection…………………………………………………………………………………………. 
69 
Regional Development……………………………………………………………………………………. 
70 
 
Contents
Previous page Next page Top

MPIP 2027-2029 · file page 5 printed page 1

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
1
Primary Education
To provide furniture and office equipment including construction, renovation of buildings and structures 
in primary schools.
264
205
305
310
2
Secondary Education
To provide plant, machinery, furniture and office equipment including construction- renovation of 
buildings and structures in national schools.
2,717
3,930
2,000
1,350
3
Facilitate Education and Training of A/L Vocational 
Stream Students
Construction and renovation of buildings and structures
87
 
 
 
4
E-Thaksalawa
To provide plant, machinery and equipment for E-Thaksalawa programme
44
15
25
40
5
Improvement of Sanitation Facilities
To construct toilets and provide water facilities for existing toilets in 139 provincial schools and 23 
national schools, as well as in rural schools with minimal facilities.
2023
2025
524
34
 
 
 
 
6
Disaster Mitigation and Safety Improvements in 
Schools
To construct retaining walls to improve the safety and security of both human and physical infrastructure 
in government schools
2025
2029
400
44
819
400
 
 
7
Special Education
To provide teacher training, furniture and office equipment including construction- renovation of 
buildings and structures in schools relating to special education units
82
120
120
135
8
Strengthening of Piriven Education
To provide teacher training, curricular development, furniture and office equipment including 
construction- renovation of buildings and structures in pirivens
310
550
410
410
9
National and Provincial Resource Centers for 
Children with Special Education Needs
To upgrade the resource centers with necessary facilities for children with special education needs
2015
2027
 
75
16
22
25
25
10 Teacher Development (Capacity Building)
To provide teacher training 
2016
2029
1,000
101
96
100
100
100
11 Teacher Colleges and Centers - Rehabilitation and 
Improvement of Capital Assets
To improve the infrastructure facilities of the teacher colleges and centers
197
975
1,075
1,375
12 National Colleges of Education - Rehabilitation and 
Improvement of Capital Assets
To provide necessary facilities for National Colleges of Education
596
675
280
290
13 Facility Improvement of National Colleges of 
Education
To construct buildings and structures in National Colleges of Education
2,000
1,400
2,000
2,600
14 Improvement of Teacher Colleges and Centers
To construct buildings and structures in Teacher Colleges and Centers
109
300
300
300
15 Establishment of National College of Education for 
Technology Stream (GOSL/KOICA) 
To establish the National College of Education for Technology in Narangalla, Kuliyapitiya.
2017
2027
6,582
6,747
780
20
 
 
16 Providing Electricity Facilities (through National 
Grid or Solar) for the schools
To provide electricity to all schools currently without access, either through the national grid or through 
solar power 
2016
2026
2,000
1,415
 
 
 
 
17 Upgrading Plantation Schools to Secondary Level 
To upgrade 25 schools in the plantation sector to secondary level
2016
2027
250
515
738
360
 
 
18 Facilitate Dental Health Facilities in Schools 
To rehabilitate and upgrade the dental centers in schools with appropriate equipment
2016
2026
250
245
72
75
80
 
19 Providing Sanitary and Water Facilities for All 
Schools 
To ensure the provision of adequate sanitary and safe drinking water facilities for all Primary and 
Secondary schools across the island.
2016
2025
4,000
7,188
 
 
 
 
20 Upgrading Facilities of 3,577 Primary Schools 
To upgrade 3,577 primary schools in the country with the required facilities
2016
2026
10,000
7,740
6
 
 
 
21 Providing Facilities of Teacher Quarters and Rest 
Rooms etc. for Rural & Regional Schools 
To facilitate the effective deployment of teachers particularly in the fields of Science, Mathematics, 
Information Technology and English with special emphasis on regional and rural schools
2016
2026
2,000
1,155
 
 
 
 
22 Upgrading Facilities of 1,000 Secondary Schools 
To provide other facilities such as activity rooms, laboratories, multimedia facilities, libraries with e-
library facility for secondary schools
2016
2026
15,000
14,865
254
 
 
 
23 Improve Facilities of 1,360 Schools which Were 
Not Included in Recent Projects 
To improve the facilities and the quality of neglected schools by recent past years.
2016
2028
30,000
17,946
443
200
 
 
Annual
Annual
Sector: General Education
  Total 
Estimated Cost 
(TEC)  
Cumulative 
Expenditure (as 
at 31.12.2025)
Project Period
Objectives and Scope of the Project
Revised Budget 
for 2026
Estimates for 
2027
Projection for 
2028
Projection for 
2029
Ongoing Projects
Ministry of Education, Higher Education and Vocational Education 
Name of the Project
No
Annual
Annual
Annual
Annual
Annual
Annual
Annual
Annual
1
Previous page Next page Top

MPIP 2027-2029 · file page 6 printed page 2

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
  Total 
Estimated Cost 
(TEC)  
Cumulative 
Expenditure (as 
at 31.12.2025)
Project Period
Objectives and Scope of the Project
Revised Budget 
for 2026
Estimates for 
2027
Projection for 
2028
Projection for 
2029
Name of the Project
No
24 Construction of Multi-Ethnic Trilingual School in 
Polonnaruwa (GOSL/India)
To construct new school comprising classrooms, laboratories, a library, and necessary furniture and 
equipment, ensuring inclusive education for all children across different ethnic and religious 
backgrounds in the region.
2017
2028
1,200
366
290
300
200
 
25 General Education Modernization Project 
(GOSL/WB)
To improve the quality and strengthen the stewardship of the general education system through 
curriculum modernization and diversification, teacher development, enhanced educational leadership 
and management, and the promotion of social equity and inclusion in education (National and Provincial 
Schools) – Some project activities are implemented by the Provincial Councils
2018
2027
4,759
4,901
2,635
2,200
 
 
26 Qualitative Development Reforms in Education
To shift from an exam-centric, rote-learning model to one focused more on quality, relevance, practical 
skills, holistic development, continuous assessment, and preparing students for life & the labour market.
1,774
660
2,000
2,500
27 Technological Education Development Projects 
(GOSL/OFID)
To ensure and promote equitable access to high quality technology education at the secondary level, with 
a particular focus on senior secondary technology education and vocational training 
2018
2027
10,924
5,744
5,260
10
 
 
28 Establishment of ICT Hubs Secondary Education 
(GOSL/ EDCF) 
To establish a National Content Development Center and strengthen provincial and zonal ICT centers to 
facilitate for development and enhancement of e-learning content by schools.
2019
2027
5,706
1,100
575
2,500
2,918
 
29 Upgrading Schools in Plantation Areas 
(GOSL/India)
To upgrade nine plantation schools in the Central, Uva, Sabaragamuwa, and Southern Provinces.
2022
2028
600
235
236
245
 
 
30 Schools Development Activities and Grants
To achieve DLI decided by Secondary Education Sector Improvement Programme, provision of school 
based development grant to ensure the equity in education
 
 
 
 
31 Secondary Education Sector Improvement 
Programme -SESIP  (GOSL/ADB)
To transform and align secondary education with the evolving needs of the labor force, focusing on 
enhancing the quality and relevance of secondary science, technology, mathematics, and commerce  
programmes, while strengthening school capacity to implement education reforms and improving sector 
management capabilities.
2021
2026
75,000
41,556
190
 
 
 
32 Enhance Language Competency
To improve students’ English proficiency and confidence, enabling them to communicate effectively in 
personal, academic, and professional settings
2024
2027
500
610
169
180
300
 
33 Improvement of Infrastructure Facilities in Schools
To establish a secure learning environment in schools by providing essential physical infrastructure.
2025
2027
9,600
970
5,000
3,000
2,500
2,500
34 Modernization of School Education 
To review the school system to prepare a national plan to relocate schools in rural and remote areas
2025
2027
500
156
1,220
2,000
 
 
35 Providing Aesthetic Equipment for Improving 
Aesthetic Education
To provide aesthetic equipment to selected schools with the objective of enhancing aesthetic education
2026
2028
1,215
 
465
455
295
 
36 Completion construction of urgently needed school 
infrastructure buildings of identified national 
schools
To construct urgently needed infrastructure in identified national schools.
327
650
200
 
i
Construction of Three Storied Classroom Building 
with Laboratories for A/L Section for Thurstan 
College
To re-construction of new three-storied classroom building with laboratories for advanced level 
section for Thurstan College
2026
2028
417
 
60
240
117
 
ii
Construction of Primary Building for 
KU/Maliyadeva Boys College, Kurunegala
To construct a three-storied building to replace the existing structure which is in a dilapidated 
condition
2026
2028
392
 
137
212
43
 
37 Development of School Hostel Facilities
To develop hostel facilities of 126 schools in all Island
2026
2028
1,008
 
400
400
208
 
38 School Playground / Sport Infrastructure 
Development Project
To develop school playground with 400m running lane and modern facilities
2026
2029
2,011
 
583
584
500
344
39 Establishing Activity-Based Learning (ABL) 
Centers for Commerce Scheme Students and 
Teachers
To enhance practical learning in commerce subjects by promoting collaborative learning, strengthening 
communication skills and fostering industry academic collaboration
2026
2028
289
 
100
80
 
 
Annual
Annual
Annual
2
Previous page Next page Top

MPIP 2027-2029 · file page 7 printed page 3

Cited in: Cyberlaw and policy scorecard, Digital economy lines, Home, Ministry and programme movers

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
  Total 
Estimated Cost 
(TEC)  
Cumulative 
Expenditure (as 
at 31.12.2025)
Project Period
Objectives and Scope of the Project
Revised Budget 
for 2026
Estimates for 
2027
Projection for 
2028
Projection for 
2029
Name of the Project
No
40 Construction of Teacher Quarters in Selected 
Plantation Schools
To address structural deficiency by constructing and providing teachers’ quarters in selected 14 
plantation schools
2026
2027
465
 
201
264
 
 
41 Developing Physical Infrastructure and Providing 
Equipment to Provincial Education Departments, 
Zonal Education Offices, Divisional Educational 
Offices
To construct three-storied buildings and renovate existing buildings of provincial education departments, 
zonal education offices and divisional educational office
2026
2028
1,265
 
713
50
502
 
42 Modernization of Printing Press
To purchase two color offset printing machines as the existing machines are outdated
2025
2027
324
 
100
300
 
 
43 Digital Archiving of Certificates
To preserve fragile and aging documents to prevent further deterioration and loss of examination records
2025
2027
400
 
100
150
 
 
44 Establishment of SMART class room in Plantation 
Schools (India)
To integrate information and communication technology in plantation schools by providing well-
maintained classrooms.
2024
2026
623
 
600
 
 
 
1
Digital Transformation of General Education 
(Grade 1-13) in Sri Lanka 
To establish an integrated, inclusive and secure digital education ecosystem by strengthening digital 
infrastructure and connectivity, improving education management, and promoting technology-enabled 
teaching and learning.
2027
2031
96,500
 
 
4,000
6,000
14,000
i
Enhancement of ICT Infrastructure in 4,250 
Government Schools
To provide desktop computers for 4,250 government schools to strengthen the provision of technology-
enabled education.
2027
2029
9,562
 
500
4,000
5,062
ii
Inclusive Digital Learning Program for Learners 
with Disabilities in Government Schools and 
Assisted Special Schools from Grade 1 to Grade 13 
To strengthen inclusive digital learning for learners with disabilities in government and Assisted 
Special Schools from Grade 1 to Grade 13.
2027
2031
2,911
 
 
600
750
600
iii Providing Smart Board for Provincial Schools
To provide smart boards to provincial schools to enhance technology-enabled teaching and learning.
2027
2029
1,530
 
 
350
600
580
iv Development and Implementation of the National 
Education Management Information System 
(NEMIS) - Section II (Estimated Cost Rs. 398.69 
Mn)
To upgrade the NEMIS System.
2027
2031
1,188
 
 
150
150
99
v
On Boarding New E-mail Infrastructure with E-
mail Security and Awareness for Approximately 
10,000 Government Schools 
To establish secure email infrastructure for approximately 10,000 government schools, including email 
security and user awareness measures.
2027
2029
600
 
 
140
300
160
vi Provision of Satellite Internet Connectivity for 
1,000 Rural Secondary Schools in Sri Lanka.
To provide satellite internet connectivity to 1,000 rural secondary schools to improve access to digital 
education services and resources.
2027
2029
435
 
 
100
200
135
2
Human Resource Development for Education 
Program (HRDEP) (GOSL/ADB)
To address human resource management challenges and capacity gaps within Sri Lanka’s education 
workforce.
2027
2031
42,768
 
2,000
5,200
8,000
i
Providing Hostel Facilities for Male Students at 
National College of  Education (NCOE)
To construct and renovate the hostel facilities including sanitary facilities for male students in National 
Colleges of Education (NCoEs).
2027
2029
1,870
 
350
700
820
ii
Strengthening Vocational Stream for Senior 
Secondary Reforms
To provide smart classroom facilities for the A/L vocational stream at 612 schools.
2027
2031
1,230
 
 
150
300
350
iii Construction and Renovations of All Colleges of 
Teachers and all Professional Development 
Centers
To rehabilitate and upgrade deteriorated buildings and essential facilities of selected teacher training 
colleges and teacher professional development centers.
2027
2029
1,569
 
 
460
500
609
Department of Examinations 
Ministry of Plantation and Community Infrastructure
New Projects
3
Previous page Next page Top

MPIP 2027-2029 · file page 8 printed page 4

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
  Total 
Estimated Cost 
(TEC)  
Cumulative 
Expenditure (as 
at 31.12.2025)
Project Period
Objectives and Scope of the Project
Revised Budget 
for 2026
Estimates for 
2027
Projection for 
2028
Projection for 
2029
Name of the Project
No
iv Development and Implementation of the National 
Education Management Information System 
(NEMIS) - Section I (Estimated Cost Rs. 789.40 
Mn)
To upgrade the NEMIS System. This project component covers only the Human Resource Development 
costs associated with the NEMIS project.
2027
2031
1,188
 
 
124
250
200
v
Affiliation of Unawatuna, Balapitiya, Garagama 
and Batticaloa Teachers Colleges with the 
National College of Education
To expand the capacity for pre-service teacher education by affiiating selected teacher training 
colleges with NCoEs.
2027
2029
1,094
 
 
270
400
424
vi Implementation of an OMR/OCR-Based Automated 
System and Integrate it with the IBM system for 
MCQ Paper Evaluation at the Department of 
Examinations (DoE)
To introduce an OMR/OCR-based automated evaluation system integrated with the existing IBM system 
for the efficient evaluation of MCQ answer scripts 
2027
2028
960
 
 
420
 
vii Implementation of a Standardized Record System 
for Teachers to Promote Instructional 
Preparedness and Professional Excellence in 
Government Schools of Sri Lanka
To issue a digital record book for teachers.
2027
2029
378
 
 
126
150
102
3
School Laboratory Development and Modernization 
Project
To address the shortage of laboratory facilities through infrastructure development, provision of modern 
equipment, installation of essential utilities and safety systems and teacher capacity building. 
2027
2029
4,512
 
 
510
2,000
2,002
4
Entire Process Management System with ERP 
(Enterprise Resource Planning Solution) at DoE
To establish a fully integrated, secure and scalable ERP-based system to digitalize and streamline 
examination-related and administrative process of the Department of Examinations (DoE). 
2027
2028
830
 
 
30
800
 
5
Conservation and Renovation of Building in 
Southland Balika Vidyalaya, Galle
To conserve and renovate the historical buildings of Southland College while preserving the architectural 
heritage of the Galle Fort area.
2027
2030
655
 
 
190
200
200
6
Upgrade the Existing Permanent Buildings and 
Infrastructure Facilities of the 
Anu/Thambuththegama M.M. Vidyalaya
To address the shortage of classroom space caused by increasing student enrolment by upgrading 
existing facilities and constructing new buildings. 
2027
2029
649
 
 
150
350
149
7
National Creative Studios Initiative for Aesthetic 
Education: One Provincial Studio for Each Province
To establish and operationalize one Provincial Creative Studio in each province to strengthen the 
delivery of aesthetic education. 
2027
2029
645
 
 
50
250
345
8
Construction of a Building Complex for Academic 
Development and Professional Learning at NIE
To address infrastructure and space constraints at NIE by constructing a purpose-built five-storied 
building complex at the Maharagama premises.
2027
2028
600
 
 
50
550
 
9
Completion and Rehabilitation of Incomplete 
School Buildings in Vavuniya and Mannar Districts
To complete and rehabilitate incomplete school buildings in Vavuniya and Mannar Districts through the 
required civil, structural, architectural, electrical and finishing works to make the facilities fully 
functional.
2027
2029
429
 
175
150
104
10 Construction of New Centralizes Warehouse 
Facility for Book Storage and Distribution (D-
Store) - Education Publication Department
To construct a modern and fully equipped warehouse facility to expand the storage and distribution 
capacity of the Educational Publications Department and improve access to educational publications, 
textbooks and learning materials.
2027
2029
394
 
 
45
149
200
11 Improvement of Learning Environment for 
Agriculture Education in Schools
To strengthen practical agricultural education in 396 national schools by providing essential agricultural 
equipment and enhancingg students’ practical competencies in Agricultural Science, Food Technology, 
and Biosystems Technology. 
2027
2029
363
 
 
50
150
163
12 National Initiative for Quality Science Education in 
Schools (NIQSEI-S) 
To strengthen the professional competencies of science teachers through continuous professional 
development programmes aligned with national education reform priorities. 
2027
2031
335
 
 
28
75
80
13 Renovation and Improvement of Lumbini Theatre 
at Lumbini College, Colombo 05
To renovate and upgrade the existing theatre at Lumbini College to provide a safe, modern and fully 
functional facility for educational, cultural and community activities. 
2027
2028
313
 
 
123
190
 
4
Previous page Next page Top

MPIP 2027-2029 · file page 9 printed page 5

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
1
12 storied Building for the Faculty of Medicine , University of Ruhuna
To increase the intake of medical undergraduates, and to construct a building that 
accommodates essential facilities needed for undergraduate education, clinical 
care, Lab services and health education.
2020
2026
3,195
1,668
1,005
300
 
 
2
Establishment of a Professorial Unit at Karapitiya Hospital, University 
of Ruhuna
To Establish a new professorial ward complex comprising 8 wards, each with an 
approximate capacity of  60-80 beds.
2019
2025
2,808
2,071
935
125
 
 
3
Building Complex for the Faculty of Health Care Science, Eastern 
University (GOSL/Kuwait)
To construct building complex for the Faculty of Healthcare Sciences of Eastern 
University of Sri Lanka.
2016
2026
9,274
6,240
2,016
945
595
 
4
Wayamba Township Development Project, Wayamba University of Sri 
Lanka (GOSL/Saudi)
To establish a partnership between the University and the surrounding 
community, strengthening the rural-urban relationship and making a significant 
impact on the vast catchment area of the University.
2017
2027
9,196
7,095
1,224
965
225
 
5
Construction of Building in Swami Vipulananda Aesthetic Institute of 
Batticaloa (GOSL/India)
To strengthen the institutional capacity by constructing  a New Auditorium
2025
2027
790
300
9
331
120
6
Establishment of Faculty of Medicine, Phase II, Sabaragamuwa 
University of Sri Lanka (GOSL/Saudi)
To construct buildings including professorial unit to expand opportunities for 
medical education by establishing a new faculty.
2020
2026
16,000
7,460
6,421
1,600
 
 
7
Establishment of Medical Faculty, University of Moratuwa 
(GOSL/Kuwait)
To establish a Medical Faculty aimed at producing high-caliber professionals with 
specialized expertise.
2026
2030
9,500
300
800
2,500
4,000
8
Research and Education Capacity Improvement in Dry Zone 
Agriculture - University of Jaffna (GOSL/JICA)
To develop qualified human resources to enhance agricultural productivity and 
improve adaptability to climate change in dry-zone agriculture 
2025
2029
354
86
88
14
 
 
9
Local Bank Loan Obtained to Establish 17 Storied Building, Faculty of 
Medicine, University of Colombo
To Construct and Establish Center of excellence in teaching, learning, research 
and state of the art health care service through community integration
2017
2026
7,298
5,625
746
750
750
750
10
Scholarship for Undergraduate Degree Programmes at High Ranking 
Universities
To develop a skilled and competitive workforce by providing advanced education 
and global exposure, thereby contributing to Sri Lanka’s economic growth and 
sustainable development.
2025
2029
4,000
1,531
400
600
600
600
11
Renovations of Hostels, University of Peradeniya
To renovate existing hostels for ensuring the health and safety of students residing 
at the University
2026
2027
2,452
400
1,200
800
452
12
Establishment of Faculty of Medicine, Phase 1 Uva Wellassa University To construct Pre-clinical Building, Administrative Building and Lecture Halls for 
the Faculty of Medicine (phase 01)|.
2026
2028
2,149
600
800
1,000
349
13
Completion of Professorial Unit, University of Moratuwa
To construct two buildings to accommodate professorial units of the Faculty of 
Medicine to deliver clinical education and academic functions.
2026
2029
3,594
640
650
2,000
944
14
Providing Hostel Facilities for University Students
To provide adequate accommodation facilities for students in higher education, 
thereby creating a learning environment and enhancing quality of education.
2026
2030
26,625
1,500
3,750
4,000
7,000
15
Establishment of a Professorial Unit at Teaching Hospital Batticaloa, 
Eastern University of Sri Lanka
To strengthen the healthcare system by simultaneously enhancing the quality of 
clinical training for medical undergraduates
2026
2028
2,279
300
500
1,000
779
16
Construction of Laboratories, Workshops, and Lecture Halls for the 
Faculty of Technology Studies, Uva Wellassa University
To improve the quality of the technology stream by providing required facilities.
2026
2027
700
60
300
400
 
17
Establishment of Laboratory Complex at Faculty of Agriculture, 
University of Ruhuna
To enhance practical skills of undergraduates of the Faculty of Agriculture while 
expanding services to the farming communities in the region.
2026
2028
2,342
560
500
1,000
842
18
Establishment of a Laboratory Complex for Medical Laboratory 
Science at Faculty of Allied Health Sciences, University of Peradeniya
To enhance teaching and research capacity in alignment with international 
standards.
2026
2027
405
120
250
155
 
Sector: Higher Education
Cumulative 
Expenditure (as at 
31.12.2025)
Project Period
  Total Estimated 
Cost (TEC)  
Name of the Project
Revised Budget for 
2026
Estimates for 2027
Projection for 2028
Projection for 2029
Ongoing Projects
Ministry of Education, Higher Education , Vocational Education
No
Objectives and Scope of the Project
5
Previous page Next page Top

MPIP 2027-2029 · file page 10 printed page 6

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
Cumulative 
Expenditure (as at 
31.12.2025)
Project Period
  Total Estimated 
Cost (TEC)  
Name of the Project
Revised Budget for 
2026
Estimates for 2027
Projection for 2028
Projection for 2029
No
Objectives and Scope of the Project
19
Extension of the Department of Civil and Environmental Engineering 
Building to house the proposed Heavy Structural Engineering 
Laboratory and Coastal and Port Engineering Laboratory, University of 
Ruhuna
To enhance the quality of education by providing the necessary infrastructure and 
facilities.
2026
2027
1,454
252
555
600
299
20
Digital Transformation of the University of Kelaniya
To enhance teaching, learning, research, and outreach activities by digitally 
transforming the University.
2026
2027
476
100
300
176
 
21
Construction of a Building for Faculty of Allied Health Sciences and 
Faculty of Dental Sciences, University of Sri Jayewardenepura
To construct a seven storied building to house all the Departments of the Faculty 
of Allied Health Sciences and facilities of the Faculty of Dental Sciences. 
2026
2028
3,419
800
800
2,000
619
22
Construction of a Proposed Building for the Faculty of Business, 
University of Moratuwa
To construct a building complex to fulfill the academic needs.
2026
2027
1,309
300
400
600
309
23
Construction of Two Storied Building for Student Service Center for 
University of Vavuniya
To construct a centre that integrates a facilities for students and university 
community.
2026
2027
474
100
200
274
 
1
Construction of the State of the Art Building for the Faculty of Allied 
Health Sciences, University of Jaffna
To construct a five-story building encompassing a total area of 12,450 square 
meters. 
2027
2029
2,234
350
1,000
884
2
Construction of Waste Water and Sewerage Treatment Plant, Eastern 
University of Sri Lanka
To establish and operationalize modern treatment plants.
2027
2028
690
250
440
 
3
Construction of 5 Storied Building Complex at Colombo Premises, 
Buddhist and Pali University
To construct a five-story building with a total floor area of 2,579 square meters. 
2027
2029
622
150
300
172
4
Construction of 10 Storied Building for the Faculty of Commerce and 
Management Studies, University of Kelaniya
To construct a ten-story building with a total floor area of 10,000 square meters
2027
2029
2,868
500
1,500
868
5
Construction of Faculty Hub, Faculty of Medicine, University of 
Peradeniya
To establish a “Faculty Hub” by constructing a two storied building to provide an 
improved dining environment and welfare facilities.
2027
2029
499
150
250
99
6
Construction of a New Central Sewage Treatment Plant, University of 
Sri Jayewardenepura
To establish a wastewater treatment system to effectively manage wastewater 
generated within the university.
2027
2029
948
350
598
 
7
Transformation of the Faculty of Science to a Knowledge and 
innovation Hub to boost the national economy, University of Kelaniya
To establish a state-of-the-art multidisciplinary Science and Innovation Complex 
under the “TRAC-F Pentagon Model”
2027
2033
19,235
100
1,000
4,900
8
Construction and Completion of the Proposed Building for 
Collaborative Infrastructure Development for the Examination Services 
& Student Common Learning Area, University of Moratuwa
To strengthen academic and student support services through a centralized facility 
for examinations, learning, and student activities.
2027
2029
1,100
150
700
250
9
Major renovation works in the existing buildings at the Faculty of 
Humanities and Social Science and Faculty of Science, University of 
Ruhuna
To preserve the safety and functionality of existing academic buildings through 
major renovation works.
2027
2028
2,152
250
1,902
 
10
Construction of the Building complex, Faculty of Computing, 
Sabaragamuwa University
To develop modern laboratories, classrooms, and research facilities to strengthen 
ICT skills development and meet national ICT workforce demand
2027
2029
2,648
250
1,200
898
11
Establishment of the Multipurpose Building for the Faculty of 
Management, Uva Wellassa University
To construct a modern Multipurpose Building
2027
2029
1,143
100
600
443
12
National Creative Arts Education and Industry Development Initiative 
Project, University of the Visual and Performing Arts
To modernize creative arts education in line with international standards and best 
practices.
2027
2029
570
50
300
220
13
Construction of Administrative Building for the University of Vavuniya To construct a dedicated administrative building to enhance administrative 
activities.
2027
2028
987
150
837
 
14
Construction of New Boy’s Hostel Facility, Hardy ATI - Ampara
To construct a modern, high-capacity student hostel.
2027
2027
583
117
466
 
New Projects
6
Previous page Next page Top

MPIP 2027-2029 · file page 11 printed page 7

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
Cumulative 
Expenditure (as at 
31.12.2025)
Project Period
  Total Estimated 
Cost (TEC)  
Name of the Project
Revised Budget for 
2026
Estimates for 2027
Projection for 2028
Projection for 2029
No
Objectives and Scope of the Project
15
Renovation and Improvement of Internal Road Network, Kilinochchi 
Premises, University Jaffna
To improve the internal road network, drainage system, and pedestrian safety
2027
2028
575
100
300
175
16
Construction of an Extension to the Existing Administration Building, 
Bhiksu University of Sri Lanka
To construct a four-storey extension  to address the increasing demand for 
administrative functions
2027
2028
491
98
393
 
17
Development of Clinical Training Facilities at Teaching Hospital 
Kurunegala for Wayamba University of Sri Lanka
To strengthen the clinical training capacity of the Faculty of Medicine
2027
2029
1,979
300
1,000
679
18
Construction of Seven Story Laboratory and Teaching Complex, 
Faculty of Engineering, University of Ruhuna
To strengthen the academic, examination, and laboratory infrastructure of the 
Faculty of Engineering
2027
2028
3,146
300
2,846
 
19
Construction of Building Complex Faculty of Science, Eastern 
University of Sri Lanka
To provide adequate laboratory and lecture hall spaces to create a conducive and 
teaching and learning environment. 
2027
2029
4,000
300
1,800
1,900
20
Enhancing Teaching Learning Research and Academic Programmes of 
the Faculty of Agriculture through the Establishment of a Laboratory 
Complex, Rajarata University of Sri Lanka
To improve the practical knowledge, technical skills, and research capacity of the 
Faculty of Agriculture
2027
2029
1,986
350
1,000
636
21
Construction of  New Building Complex for the Falculty of 
Management and Finance, University of Colombo
To construct a new five‑story building to address the significant space constraints 
faced by the Faculty of Management and Finance.
(Generated Fund - LKR 578.82 Mn)
2027
2030
965
100
500
365
22
Preparatory Activities
 
 
 
 
 
500
2,500
3,000
 
Renovation and Refurbishment of Arundhati Theatre of the Sri Palee 
Campus, University of Colombo
To undertake the renovation and conservation of the Arundathi Theatre Hall 
2027
2027
288
 
 
 
 
 
Building Complex for the Faculty of Arts and Culture (Phase II), 
Eastern University of Sri Lanka
To provide adequate laboratory and lecture hall spaces.
2027
2030
2,250
 
 
 
 
 
Design and Construction of Proposed Faculty of Business Studies and 
Finance Stage II, Kuliyapitiya Premises, Wayamba University of Sri 
Lanka
To address the growing space requirements of the Faculty of Business Studies and 
Finance
2027
2028
403
 
 
 
 
 
Construction and completion of four stories of the proposed 6 story 
building complex for the Faculty of Indigenous Social Sciences and 
Management Studies, Gampaha Wickramarachchi University of 
Indigenous Medicine
To establish permanent academic infrastructure (Stage I) by constructing the first 
four stories of the proposed six-story building complex 
2027
2029
1,594
 
 
 
 
 
Establish a modern, fully equipped clinical block, Faculty of Medicine, 
University of Peradeniya
To establish a modern, fully equipped clinical building that enhances integrated 
clinical training facilities
2027
2029
5,000
 
 
 
 
 
Construction of Staff Quarters for Executive, Academic, Non-
Academic and Academic Supportive Staff University of Vavuniya
To provide adequate residential facilities staff members
2027
2030
2,053
 
 
 
 
 
23
Establish a Common Teaching Complex at the Faculty of Veterinary 
Medicine and Animal Science, University of Peradeniya
To strengthen veterinary education and human resource development by 
improving the teaching and learning environment (Dithawa Project)
2027
2029
1,500
 
 
500
500
500
24
Construction of Mechanical Engineering Laboratories and Workshop, 
Faculty of Engineering, South Eastern University of Sri Lanka
To establish permanent, safe, and resilient six engineering laboratories and ten 
mechanical workshops. (Dithawa Project)
2027
2029
1,147
 
 
400
450
297
25
Construction of Academic Support Complex, South Eastern University 
of Sri Lanka
To establish a disaster-resilient four-storey Common Academic Support Complex 
(Dithawa Project)
2027
2029
1,044
 
 
370
400
274
26
Construction of New Building at the Puttalam Study Centre, Open 
University of Sri Lanka
To replace the Ditwah cyclone-damaged building with a new disaster-resilient 
facility. (Dithawa Project)
2027
2027
420
 
 
300
120
 
27
Construction of New Building (60,000 sq.ft), Faculty of Management, 
University of Peradeniya
To Construct a modern, disaster-resilient six-storey building complex (Dithawa 
Project)
2027
2029
2,175
 
 
350
900
925
7
Previous page Next page Top

MPIP 2027-2029 · file page 12 printed page 8

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
1
Establish a Renewable Energy Training with AI, HUB
To establish Renewable Energy Training Hub (ACET) through a collaborative 
initiative between CGTTI-Moratuwa, SLGTI-Kilinochchi,  and proposed 
institute.
2026
2027
398
286
205
130
 
2
Upgrade VT Centers to Centers of Excellence in each 
province
To upgrade selected VT centers into excellent centers in each province.
2026
2028
4,050
2,000
1,340
1,000
1,100
3
TVET Career Platform Project in Sri Lanka
To establish policies and support systems for improving the employment 
outcomes of Sri Lanka’s vocational and technical education graduates and to 
strengthen career development guidance and employment support for 
vocational and technical education trainees.
2022
2026
1,760
1,985
701
 
 
4
Vocational Training in Sri Lanka (GOSL/Germany)
To improve the quality of Vocational Education and training for all population 
groups in terms of labor market relevance access and environment sustainability 
2019
2026
2,346
1,340
349
106
 
 
5
Skills Development System Transformation Programme
To strengthen Sri Lanka’s Technical and Vocational Education and Training 
(TVET) sector by through expanding equitable access to inclusive, 
employment-oriented training through digital learning, career guidance, 
industry partnerships, workplace training, and student support. The programme 
will also strengthen sector governance, regulatory frameworks, accreditation, 
and public-private partnerships to enhance graduate employability and support 
sustainable economic growth.
2027
2032
12,000
10
1,740
2,622
5,800
 
 
 
1
Construction New Classrooms and Automobile Technology 
Workshop (NVQ Level 5 & 6) at University College of 
Matara, Meddawatta, Matara.
To construct a purpose build Automobile Technology workshop equipment for 
NVQ level 5, 6 practical training at University College Matara
2027
2033
790
50
110
115
2
Development of a Tourism and Hospitality Training 
Laboratory of University of Vocational Technology (UoVT)
To establish a hospitality complex which is fully functional 3 story tourism & 
hospitality training laboratory at Ratmalana 
2027
2029
305
181
124
 
3
Construction of Student Hostel, Workshop and Canteen for 
the University of Vocational Technology at Rathmalana
To contract a Morden 07 story multipurpose building including student hostel 
for 600 male student , modern workshop & well equipped canteen for 300 
seating capacity 
2027
2030
3,380
800
2,105
475
 
 
 
 
1
Upgrading of 25 Training Centers (Colleges of Technology & 
Technical Colleges) under budget proposals 2026
To upgrade identified 25 of colleges of Technology and Technical colleges in 
terms of workshops, strengthening practical learning environment enhancing 
quality and improve skills of trainer
2027
2030
5,996
1,500
2,000
2,497
No
Objectives and Scope of the Project
Sector: Vocational Education
Cumulative 
Expenditure (as 
at 31.12.2025)
Project Period
  Total Estimated 
Cost (TEC)  
Name of the Project
Revised Budget 
for 2026
Estimates for 
2027
Projection for 
2028
Projection for 
2029
University of Vocational Technology and University College
Department of Technical Education & Training (DTET)
Ongoing Projects
Ministry of Education, Higher Education , Vocational Education
New Projects
8
Previous page Next page Top

MPIP 2027-2029 · file page 13 printed page 9

Major Public Investment Project 2027-2029
Sector: Labour 
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
Ongoing Projects
1
Construction of Mehewara Piyasa (Mehewara Piyasa 
Interior Works, Common Facilities and other) 
Mehewara Piyasa Interior Works and Common Facilities to ensure 
required facilities
2020
2027
1,444
728
143
331
1
Structural renovation of the Labour Secretariat (Old) 
building in Narahenpita, belonging to the Department 
of Labour
Mitigate safety risks, extend the service life of the asset, and protect 
the Government’s investment in a strategically important public 
major government office complex serving approximately 800 officers 
and 600 daily service recipients.
2027
2029
1,428
263
275
890
New Projects
No
Name of the Project
Objectives and Scope of the Project
Project Period
Total Estimated 
Cost (TEC)
Ministry of Labour
Cumulative 
Expenditure (as 
at 31.12.2025)
Rivesed Budget 
for 2026 
Estimates for 
2027
Projection for 
2028
Projection for 
2029
9
Previous page Next page Top

MPIP 2027-2029 · file page 14 printed page 10

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
1
Development of Provincial and District 
Sports Complexes 
The establishment of sports complexes equipped with high- quality and complete sports 
facilities to cover all the provinces of the country, thereby attracting talented athletes from 
all over the island to sports.
 To contribute to the economic and social development of the country by improving the 
sports skills of the youth.
2011
2026
9,200
8,022
375
340
355
365
2
Completion of Sports stadium Kalmunai 
Minimizing disruptions to educational activities due to having to go to training in faraway 
areas for school children and other athletes involved in sports, reducing transportation 
costs, preventing dropouts from sports by increasing physical fitness and bringing skills to 
a maximum level.
2019
2026
282
                  
150
40
3
Establishment of Sports Culture 
To provide access to sports infrastructure facilities for the elderly community, youth 
community, sports clubs and schools who do not have access to adequate sports facilities.
To minimize government expenditure on developing sports infrastructure facilities by 
improving existing facilities and ensuring their optimal utilization.
2025
2027
6,300
428
2,600
2,500
2,570
2,650
4
Programme for Provision of Sports 
Infrastructure Facilities for Schools and 
Sports Societies in Rural Areas 
To identify children with sports talent at the regional level by improving access to sports 
for sports-loving school students.
To create a youth who is active and endowed with leadership qualities by improving access 
to sports for the sports-loving youth community
To promote the necessary sports infrastructure to build a systematic foundation for 
achieving national and international achievements from the sub-national level
2025
2027
1,200
25
450
450
460
470
5
Digital Empowerment for youth: V4R & 
National Youth Services Council 
Digitalization Smart Youth App
To introduce V4R digital platform to the youth for transforming new ideas and concepts 
into marketable products by 2027.
2025
2027
259
3
55
64
6
Renovation, Modification & 
Improvement of Multipurpose Hall at 
Youth Centre Maharagama for NYSC 
To renovate and modify multipurpose hall and increase the lifetime of the national asset in 
order to provide infrastructure facility to conduct various programs for youth.
2025
2027
1,564
38
200
386
7
Resurfacing of 400m / 200m and 80m 
artificial Synthetic Running Track and 
upgrading of related infrastructure
 Synthetic Running Track.
 Install electronic time machines and 2 Digital screens and EDM.
 Renovating flood light towers.
2025
2027
1,063
695
1
Establishment of a National High-
Performance Center (HPC) at Diyagama 
Sports Complex
Establish a fully equipped High-Performance Centre with international-standard 
infrastructure.
Enhance Sri Lanka’s medal-winning capacity at international competitions.
Develop an integrated system combining coaching, sports science, and athlete monitoring.
2027
2029
3,980
300
1,250
2,340
2
Transformation and upgrading of NYSCO 
VIDEO into a National Creative & 
Entertainment Technologies Institute 
(Young Creative Cluster-YCC)
Establish a national Creative & Entertainment Technologies Institute to develop industry-
ready youth
Integrate digital media, events, and audiovisual production into a unified ecosystem. 
Reduce government outsourcing costs through in-house production and event services
2027
2029
380
166
146
68
New Projects
Project Period
Sector: Youth Affirs and Sports 
No
Name of the Project
Objectives and Scope of the Project
Ministry of Youth Affairs and Sports
Ongoing Projects
Cumulative 
Expenditure (as 
at 31.12.2025)
Total Estimated 
Cost (TEC)
Rivesed Budget 
for 2026
Estimates for 
2027
Projection for 
2028
Projection for 
2029
10
Previous page Next page Top

MPIP 2027-2029 · file page 15 printed page 11

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
1
Sri Lanka Primary Healthcare System Enhancing Project (PHSEP) Improve access and quality of primary healthcare services across all districts of Sri 
Lanka
2024
2028
52,709
269
8,000
14,195
24,823
24,020
2
Construction of ETU Building -  NH Kandy
2014
2027
788
300
300
3
Construction of ETU Building - DGH Trincomelee
2014
2027
1,075
200
220
375
4
Construction of ETU Building  - TH Kegalle
2014
2025
2,095
500
425
1,100
5
Construction of ETU Building  - DGH Ampara
2014
2027
1,589
250
300
195
6
Construction of ETU Building  - DGH Chilaw
2014
2025
4,386
500
700
1,500
1,250
7
Improvement of ETU Facilities of  Hospitals under the Line 
Ministry
2014
2025
2,637
650
270
8
Construction of a three-story oncology unit at TH Ratnapura 
(Stage II).
 Enhance the treatment capacity of TH Rathnapura 
2025
2027
709
205
300
200
190
9
Medical Ward  Complex at DGH Chilaw
 Enhance the treatment capacity of DGH Chilaw
2014
2026
718
257
150
300
150
10 Construction of Ministry Building (16-stroried building) 
Office building for Ministry of Health, Nutrition and Indigenous Medicine
2016
2027
14,549
6,764
3,000
3,000
2,048
11 Construction of National Stroke Centre at Base Hospital 
Mulleriyawa 
Construction of National Stroke Centre 
2014
2025
1,111
502
300
150
100
12 Provision of High Quality Radiotherapy for Cancer Patients in Sri 
Lanka With High Energy Radiation 
Completion of bunker construction at 10 hospitals and installation of equipment 
(LINAC). 
2014
2026
6,872
5,086
3,120
2,000
13 Construction of Cancer Hospitals at Karapitiya, Kandy and 
Thellipallai 
Complete construction of Cancer Hospitals at Thellipallai 
2016
2021
3,000
1,612
100
270
14 Upgrading Health facilities of selected hospitals (13 nos.)
New Hospital Buildings for selected 13 hospitals in Sri Lanka (Medirigiriya, 
Padaviya, Rikillagaskada, Kalawana, Samanthurai, Pothuvil, Mahiyanganaya, 
Eravur, Walasmulla, Aluthgama, Darga Town, Kalpitiya & Meerigama 
2019
2025
15,292
13,815
1,250
1,500
15 Establishment of special Pediatric Care Complexes in Karapitiya, 
Ampara and Jaffna
Establishment of special Pediatric Care Complexes in Karapitiya, Ampara and 
Jaffna
2017
2025
4,676
93
150
500
1,900
16 Establish Bone Marrow Transplant Unit at TH-Kandy 
Construction of seven-storied building
2017
2027
3,373
1,394
400
400
690
17 Construction of Heart Centre at Lady Ridgeway Hospital 
Construction of twelve-storied building 
2018
2026
6,219
1,939
200
50
18 Establishment of highly specialized Obstetric centers in Colombo, 
De Zoyza Maternity Hospital
Construction of building at De Soyza Maternity Hospital (DMH) Colombo 
2018
2024
1,844
259
73
19 A Neonatal and Obstetrics Reference Center for the De Zoyza 
Maternity Hospital (UK _ Sampath Bank)
Construction of building at De Soyza Maternity Hospital (DMH) Colombo 
2019
2021
5,800
2,045
212
20 Health System Enhancement Project
Strengthening primary healthcare in the North Central, Central, Sabaragamuwa, 
and Uva Provinces, enhancing health and disease surveillance capacity, and 
supporting policy development and project management—through the physical 
infrastructure development of PMCUs and DHs.
2018
2026
10,500
2,400
21 Health  System  Enhancement  Project - Additional Financing 
–ADB
Provision of medical equipment, reagents, consumables, and risk communication 
activities to prevent the spread of COVID-19.                        
2021
2026
25,000
8,035
9,445
28,359
Sector: Health
Cumulative 
Expenditure (as 
at 31.12.2025)
Project Period
  Total Estimated 
Cost (TEC)  
Name of the Project
Estimates for 2027
Revised Budget 
for 2026
Projection for 
2028
Projection for 
2029
To establish Accident and Emergency Treatment Units (ETU) in selected hospitals 
according to the A & E Policy
Ongoing Projects
Ministry of Health and Mass Media
No
Objectives and Scope of the Project
4,687
11
Previous page Next page Top

MPIP 2027-2029 · file page 16 printed page 12

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
Cumulative 
Expenditure (as 
at 31.12.2025)
Project Period
  Total Estimated 
Cost (TEC)  
Name of the Project
Estimates for 2027
Revised Budget 
for 2026
Projection for 
2028
Projection for 
2029
No
Objectives and Scope of the Project
22 Health and Medical Services Improvement Project (JICA) 
Service improments at the hospitals of TH Kandy, TH Anuradhapura, TH 
Kurunegala, PGH Badulla, DGH Trincomalee, MLT Training School Colombo, 
MLT Training School Peradeniya, MLT Training School Kalutara and BME 
Division Colombo
2018
2025
16,594
603
4,285
4,500
7,300
8,290
23 Construction of Surgical Wards and Operation theatre Complex - 
DGH Monaragala 
Improvement of Surgical and Theatre facilities
2019
2027
2,962
342
500
500
500
24 Construction of a Ten-stories Building at the PGH Badulla 
Improvement of patient care and teaching practices at TH Badulla.
2018
2027
6,998
2,221
1,000
1,000
600
660
25 Establishment of Cardiology unit with Cath Lab at DGH Ampara 
Enhance access to high-quality cardiac care services in the Ampara District.
2021
2027
720
53
230
186
55
26 Capacity Building of Biomedical Enmgineering Services in Sri 
Lanka (KOFIH) 
Renovation and remodeling of BES centers, Provision of BME tools and testing 
equipment, Provision of service vehicle and machinery, Establishment of inventory 
management system and Capacity building of biomedical engineers.
2019
2025
1,440
765
1,000
163
27 Programme to improve Non-Communicable Disease Treatment 
Facilities at the Sri Jayawardhanapura General Hospital 
(GOSL/GOJ) 
Supply of and installation of Liver and other Surgical Equipment, Supply of and 
installation of Ophthalmic  Instruments, Supply of and installation of Angio CT 
machine and Establishment of Dental Unit 
2024
2025
1,265
268
28 Project for the Improvement of Infectious Waste Management 
(GOSL/JICA)
Improvement of Infectious Waste Management at the hospitals of Rathnapura, 
Embilipitiya, Rikillagaskada, Meerigama, Nakulugamuwa, Mahiyanganaya, 
Puttalam, Mannar, Kurunegala, Avissawella, Medirigiriya, Welikanda, 
Trincomalee, Hambanthota and Kilinochchi
2024
2026
1,520
809
70
160
180
29 Construction of Surgical Medical Unit TH Karapitiya 
Construction  of surgical and medical wards complex 
2016
2024
1,326
773
500
400
675
30 Construction of Cardiac Care Complex, Rathnapura
Enhance access to high-quality cardiac care services at TH Ratnapura.
2021
2026
1,575
301
500
500
640
31 Construction of Cancer Hospital - TH Kandy 
Development of cancer units at TH Kandy
2016
2021
3,862
1,546
420
500
737
32 Construction of five- Story Building at BH Kalawana
Construction of five- Story Building at BH Kalawana
2025
2027
315
285
625
300
33 Completion of the construction of a three-story building at DGH 
Embilipitiya
Completion of the three floors of the partly completed building at DGH 
Embilipitiya.
2025
2026
289
100
75
600
130
34 Health  Information and Quality Improvement (Global Fund) 
Development of integrated health systems, including Health Information 
Management System (HIMS) and M&E, Laboratory Management Information 
System (LMIS), healthcare quality and safety, training of paramedical staff, and 
tuberculosis control.
2021
2025
4,948
3,947
2,985
330
35 Mental Health Development
Implement medium-term programme to expand the awareness and counselling 
services for mental health issues giving special attention for students and 
adolescents 
2025
2029
170
100
20
36 Provision of healthcare treatment for Children with 
Neurodevelopmental Disabilities, including Autism 
Implement a 5-year national program to improve health, education and service 
facilities for children with neurodevelopmental disabilities, including autism across 
all 25 districts of Sri Lanka
2025
2028
489
100
250
170
37 Manufacturing of Assistive Devices Locally 
Implement a comprehensive programme to expand locally manufacturing facilities 
of assistive devices in all provinces 
2025
2028
700
200
225
38 Project for the Stabilization of Power Supply Using Renewal 
Energy at Hospitals (GoSL_JICA)
Stabilization of Power Supply Using Renewal Energy at Sri Jayawardhanapura, TH 
Kurunegala and TH Rathnapura Hospitals
2024
2026
898
454
1,000
400
660
39 Strengthening Integrated Health Care for Universal Health 
Coverage Program
Improve access and quality of Secondary healthcare services across all districts of 
Sri Lanka
2026
2030
31,000
1,250
6,875
2,500
3,500
12
Previous page Next page Top

MPIP 2027-2029 · file page 17 printed page 13

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
Cumulative 
Expenditure (as 
at 31.12.2025)
Project Period
  Total Estimated 
Cost (TEC)  
Name of the Project
Estimates for 2027
Revised Budget 
for 2026
Projection for 
2028
Projection for 
2029
No
Objectives and Scope of the Project
40 Fleming Fund Phase II Project 
Strengthening of the surveillance system in Sri Lanka across Human Health, 
Animal Health, Environmental and Food sectors
2025
2026
343
150
150
41 Maternal and Early childhood Nutrition Services Project
Increasing access to selected community-based nutrition interventions for pregnant 
and lactating mothers and children under five in four nutritionally vulnerable 
districts namely; Nuwaraeliya, Rathnapura, Polonnaruwa and Trincomalee and 
improving the capacity of Thriposha Limited to produce rice-based Triposha
2026
2028
870
450
525
175
42 Integrated On Health Pandemic Preparedness & Response 
Strengthening Project
Strengthen pandemic preparedness and response capacities of One Health member 
institutions
2026
2028
5,430
1,630
1,355
940
43 Construct a four-storied building for establishment of proposed 
Operating Theatre, Endoscopy Unit and Thoracic pre-op wards in 
Teaching Hospital (TH), Kurunegala
Improve treatment capacity of TH-Kurunegala
2026
2028
1,892
100
500
1,200
44 Primary Healthcare Strengthening through building up 
comprehensive NCD Management Capacities
Building up comprehensive NCD Management Capacities and improve selected 
primary care facilities in Western and Sabaragamuwa provinces
2026
2031
2,433
500
605
572
45 Surgical and Maternity care with radiology department -DGH-
Matale
Improve infrasture and radiologycal service facilities at DGH-Mathale
2026
2029
2,980
100
500
750
1,130
46 OPD and specialized unit at the Institute of Oral Health (IOH) , 
Maharagama
Construct of five-storied State-of –Art Oral Health complex with the facilities of 
Out Patient Door (OPD), ETU, Radiology department, Orthodontic unit, dental 
laboratory and facilities for training.
2026
2028
2,240
100
350
1,650
47 Five stories building for institute of forensic medicine and 
toxicology (JMO’s Office- Colombo)
Construction of a five-storied building for the Institute of Forensic Medicine and 
Toxicology
2026
2028
1,519
100
320
1,000
48 Construction of Accident and Emergency Treatment and Related 
service building complex – Phase 01&02 - TH Anuradhapura
Construct a five-storied building Including equipment requirement to establish a 
dedicated A&E unit, with 02 ward complexes for Orthopedic unit and 8-bed 
operation theater and 6-bed ICU
2026
2028
6,519
200
300
1,300
1,400
49 Construction Consultant's & Medical Officer's Quarters  - TH 
Anuradhapura
Construction of new, well-equipped residential units for 50 Consultants and 100 
Medical Officers
2026
2028
2,200
50
300
1,100
500
50 Extension of Radiology Department -TH Batticaloa
Expand the radiology service facilities at the TH Batticaloa
2026
2027
251
100
171
51 Construction of National Heart Centre (NHC) at NHSL
Establish a 16-storied national cardiology and cardiothoracic care center
2026
2029
12,080
200
1,305
4,500
6,000
52 Construction and Supply of Medical Equipment for Accident and 
Emergency Unit - DGH Mannar (GosL_GoI)
Construction of full equiped Accident and Emergency Unit - DGH Mannar
2026
2028
600
230
440
200
53 Human Resource Development 
Enhancement of the skills and capacities of healthcare professionals across the 
country
2,235
2,950
     4,845 
5,725
      
54 Medical Research
Promote medical reaserch culture
500
425
     1,080 
1,090
      
55 Medical Supplies
Provide Pharmaceuticals for health institutions
1,515
550
        590 
800
         
56 Blood Bank Equipment 
Provision of Blood Bank Equipment to Hospitals
1,100
2,000
     2,500 
2,525
      
57 Bio Medical Equipment 
Provision of Bio-medical Equipment to Hospitals
13,468
15,500
   18,000 
20,000
    
58 Lab apparatus 
Procurement of Lap apparatus to Hospitals
1,300
1,800
     2,000 
2,500
      
59 Maintenance of Medical Equipment
Maintenance of medical equipment in public healthcare institutions
8,400
8,750
     9,500 
10,000
    
60 Improvement in Mechanical, Electrical and Sewerage Systems
Improvement of mechanical, electrical, and sewage systems in Hospitals
3,000
3,000
     1,000 
Annual
Annual
Annual
Annual
Annual
Annual
Annual
Annual
13
Previous page Next page Top

MPIP 2027-2029 · file page 18 printed page 14

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
Cumulative 
Expenditure (as 
at 31.12.2025)
Project Period
  Total Estimated 
Cost (TEC)  
Name of the Project
Estimates for 2027
Revised Budget 
for 2026
Projection for 
2028
Projection for 
2029
No
Objectives and Scope of the Project
1
National Survey on Prevalence and underlying causes of anemia 
and micronutrient deficiencies among school children aged 10 
years to 14 years in Sri Lanka
Conduct National Survey on Prevalence and underlying causes of anemia and 
micronutrient deficiencies among school children aged 10 years to 14 years in Sri 
Lanka
2027
2028
        264 
50
        315 
2
Wolbachia based dengue vector control intervention in Sri Lanka
Establishing a mosquito production facility in Sri Lanka to expand Wolbachia-
based vector control to a large scale, providing a sustainable solution for dengue 
outbreaks
2027
2029
     1,128 
400
        400           328 
3
Strengthening the 1990 Suwa Seriya National Emergency 
Ambulance Service (1990 Suwa Seriya Foundation) through the 
Deployment of 100 Fully Equipped Ambulances
Obtain 100 fully equiped Ambulance to "1990 Suwasariya Foundation" and 
establish parking station facilities 
2027
2028
     1,982 
1,985
4
Modern Sewage Treatment Plant for Teaching Hospital Badulla
Establish a new Sewage treatment plant with modern technologies
2027
2027
        295 
295
5
Establishment of 1000 number of Arogya Health and wellness 
Centers island-wide for enhancing community access
Establishing 1,000 Arogya Health and Wellness Centers by constructing 200 new 
facilities and renovating 800 existing Field Health Clinics 
2027
2029
   17,440 
2,000
     2,500        4,500 
6
Construction of a National Cancer Screening, Training, and 
Research Institute in Sri Lanka
Construction of a National Cancer Screening, Training, and Research Institute Sri 
Lanka at Narahenpita
2027
2028
        345 
50
        295 
7
Construction of four-storied medical Ward Complex at DGH-
Mullaitivu 
Construction of four-storied medical Ward Complex at DGH-Mullaitivu 
2027
2028
        600 
100
        500 
8
Completion of the construction of four-storied building for 
isolation unit (infection disease unit) and paying wards at National 
Hospital – Kandy (NHK)
Complete the construction of Isolation Unit
2027
2028
     1,094 
50
     1,045 
9
Establishment of a National Liver Transplant Centre (NLTC) at 
the National Hospital of Sri Lanka
Construct a six-stored building, equipped with the necessary facilities at NHSL as 
National Centre for Liver Transplantation
2027
2029
     3,155 
50
     1,555        1,550 
10 Construction of proposed six-storied building for the Accident and 
Emergency Unit, Clinics, Diagnostic and Laboratory Complex at 
Base Hospital, Puttalam
Construction of proposed six-storied building for the Accident and Emergency 
Unit, Clinics, Diagnostic and Laboratory Complex at Base Hospital, Puttalam
2027
2030
     4,120 
150
        850        1,450 
11 Extension of the Third Floor of the JICA building for 
Hsitopathology and Microbiology laboratory at Teaching Hospital 
Jaffna
Establish Hsitopathology and Microbiology laboratory at Teaching Hospital Jaffna
2027
2028
        682 
50
        630 
12 Development of Cancer Treatment and Research Unit (Phase II) - 
TH Anuradhapura
Complete the Phase II of fully equipped Oncology complex 
2027
2029
     5,082 
100
     1,500        2,000 
13 Construction of Medical Intensive Care Unit and Medical Ward 
Complex  - TH Anuradhapura
Construct a Six-storied building for Medical Intensive Care Unit and Medical 
Ward Complex
2027
2029
     1,081 
50
        550           580 
14 Construction of Maternity Wards, Labour Room and Operation 
Theatre and Associated Facilities by extending A & E Building 
3rd and 4th floors, Teaching Hospital Batticaloa
Construction of Maternity Wards, Labour Room and Operation Theatre and 
Associated Facilities
2027
2029
        707 
50
        480           180 
15 Construction and completion of balance work of 4 storied ward 
complex at District General Hospital (DGH) - Nawalapitiya
Completion of balance work of 4 storied ward complex 
2027
2027
        334 
235
        100 
16 Project Preparation activities
Carryout Project Preparation related activities including Feasibility Studies
2027
2027
        500 
500
New Projects
14
Previous page Next page Top

MPIP 2027-2029 · file page 19 printed page 15

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
1
Solar  facilitation for  religious places  
Providing Solar facilities for selected religious places
2024
2027
     4,200 
1
240
1,803
2
Renovation of John De Silva Theater -Stage 1&2
Renovation of John de Silwa Theater
2019
2028
     1,567 
551
67
180
500
500
3
Modernization of Art Gallery
Provide facilities to artistes and general public
2019
2027
        551 
251
166
20
5
5
4
Renovation of Archives Main Building
Infrastructure development of Department of National Archives
2019
2027
     2,229 
741
1,000
885
5
6
5
Installation of a Mobile Racking System for the main building  of the 
National Archives (Phase-01)
Maximum utilization of available space for expansion of facilities for safe deposit of 
documents
2021
2027
        700 
145
74
250
8
7
6
Establishment of a Digital Repository in Department of National 
Archives (Phase I)
Streamlining digital document management
2021
2030
        296 
76
51
52
52
7
Rebuilding Sri Lanka - Dittwah Projects
Restoration and Rehabilitation of Religious Places, Cultural Centres, and Department of 
National Archives Activities Affected by Cyclone Ditwah
2026
2030
     1,234 
568
 
8
Developing a Sustainable Digital Cultural Resource Management 
System and Capacity building for Data Collection, Management, and 
Utilization for Sri Lanka
The Project aims to establish a sustainable digital resource management system, digitize 
cultural heritage assets, and build institutional capacity for data collection and utilization 
in Sri Lanka.
2027
2030
720
 
 
 
 
 
Revised Budget 
for 2026
Projection for 
2028
Projection for 
2029
New Projects
Sector: Religious, Culture and Heritage
Cumulative 
Expenditure (as 
at 31.12.2025)
Project Period
  Total Estimated 
Cost (TEC)  
Name of the Project
Ongoing Projects
Ministry of Buddhasana, Religious and Cultural Affairs
No
Objectives and Scope of the Project
Estimates for 2027
15
Previous page Next page Top

MPIP 2027-2029 · file page 20 printed page 16

Cited in: Cyberlaw and policy scorecard, Cybersecurity, Dashboard, Digital economy lines, Education and skills, Governance, risk and assurance, Home, ICT spend by agency, Ministry and programme movers, Privacy and data protection, Topics

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
1
Sri Lanka Unique Digital Identity 
(SLUDI)
To establish a secure, sovereign, and biometrically anchored digital identity credential for all eligible 
citizens, linked directly to the National Population Registry. The objectives focus on deploying a 
national authentication and electronic Know-Your-Customer (eKYC) infrastructure to facilitate 
seamless single service platform for both government and private sectors, such as banking and 
telecommunications.
2021
2030
17,464
0.42
910
1,500
2,000
2,200
2
Institution Strengthening, Policy & 
Regulation
To establish a unified national digital governance framework to drive interoperability and secure data 
sharing across the country. Its core objectives are to legally operationalize the Digital Economy 
Authority (DEA) for centralized policy enforcement, stand up the Cyber Security Regulatory 
Authority (CSRA) for critical infrastructure protection, deploy a standardized GovTech operating 
model to manage shared Digital Public Infrastructure (DPI), and implement a comprehensive digital 
economy legal stack. In short, this project serves as the foundational mechanism to transition Sri 
Lanka into a highly standardized, legally enforceable, and secure digital economy.
2026
2030
11,019
949
1,400
1,880
1,970
3
Digital Government Transformation
Program (DigiGov-SL)
To establish an integrated national ecosystem that shifts government operations toward entirely 
paperless, cashless, and presenceless digital pathways. The objectives are to scale national Digital 
Public Infrastructure (DPI) platforms such as the national digital ID (SLUDI), eSignIn, eLocker, and 
GovPay while deploying a unified citizen access "Super App," launching a collaborative secure 
government email system, establishing a structured marketplace to stop redundant software 
procurements, and embedding dedicated Digital Transformation Units (DTUs) inside individual 
ministries to systematically re engineer back-  end public processes.
2026
2030
43,859
702
9,486
11,200
12,000
4
Digital Industry Development and 
Growth
To expand Sri Lanka’s tech sector into a global competitive destination by upskilling the digital 
workforce, establishing a national incubator and international accelerator program, boosting global 
lead generation for digital enterprises, and providing secure sandboxes for private-sector DPI 
experimentation. In a nutshell, this project builds a sustainable, export-led innovation ecosystem 
designed to drive technology upskilling, attract foreign venture capital, facilitate Global Capability 
Centers (GCCs), and increase the digital industry's overall contribution to the national economy.
2026
2030
9,235
750
380
520
370
5
Digital Revenue Economy
Enablement Initiative
To establish a cohesive, digitally governed financial ecosystem designed to formalize economic 
activity and minimize revenue under reporting.The objectives are to modernize public transaction 
handling by deeply integrating services with GovPay and digital acceptance rails, implement a 
standardized national electronic invoicing (eInvoicing) framework that links business accounting 
directly with tax systems, deploy an integrated National Single Window (NSW) to streamline cross 
border trade operations, and safely expand digital services to underserved areas using the national 
digital identity framework.
2026
2030
3,773
655
400
520
570
6
Strategic Industries Digital Enablement
Initiative 
To establish a standardized, platform driven framework that bridges the gap between public 
infrastructure and private operations.The objectives are to draft and execute sector specific digital 
transformation blueprints, develop and deploy shared digital platform ecosystems integrated with 
national Digital Public Infrastructure (DPI) rails such as unified identity, data exchange, and 
transaction systems and implement extensive ecosystem adoption and training programs to equip 
small and medium sized enterprises (SMEs) with data driven operational capabilities.
2026
2030
7,225
350
1,619
848
256
Ongoing Projects
Ministry of Digital Economy
No
Objectives and Scope of the Project
Sector: Digital Economy
Cumulative 
Expenditure (as at 
31.12.2025)
Project Period
  Total Estimated 
Cost (TEC)  
Name of the Project
Revised Budget for 
2026
Estimates for 2027
Projection for 2028
Projection for 2029
16
Previous page Next page Top

MPIP 2027-2029 · file page 21 printed page 17

Cited in: Cyberlaw and policy scorecard, Cybersecurity, Dashboard, Digital economy lines, Home, ICT spend by agency, Ministry and programme movers, Privacy and data protection, Topics

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
No
Objectives and Scope of the Project
Cumulative 
Expenditure (as at 
31.12.2025)
Project Period
  Total Estimated 
Cost (TEC)  
Name of the Project
Revised Budget for 
2026
Estimates for 2027
Projection for 2028
Projection for 2029
7
Inclusive Access, Adoption and 
Capacity Building
To introduce a legally binding, whole of government operating framework designed to sustainably 
scale the country's digital ecosystem. The objectives are to legally activate the Digital Economy 
Authority (DEA) with statutory enforcement powers, formalize the GovTech national operating model 
to manage shared Digital Public Infrastructure (DPI), strengthen the Cyber Security Regulatory 
Authority (CSRA) to safeguard critical infrastructure, deploy a comprehensive digital economy legal 
stack, and introduce an Architecture Review Board (ARB) mechanism to mandate design approvals 
before procurement cycles begin.
2026
2030
5,015
550
2,700
3,500
3,700
8
Informatin and Communication 
Technology Development Projects 
Implemented by SLCERT
National Cyber Security Operations Centre (NCSOC-Phase I), National Certification Authority 
(NSA), Threat Hunting and Malware Analysis (MATH) Lab, Digital Forensic Laboratory 
Enhancement, Cyber Security Capacity Building program, Development of Legislation, Policies, and 
Standards for Cyber Security.
2016
2029
3,460
1,319
600
590
800
1,000
9
Digitalization of Terrestrial Television 
Broadcasting
To completely transition Sri Lanka's television broadcasting sector from obsolete analog transmission 
to modern digital technology. The project will fix the extreme technical inefficiencies and signal 
limitations of the existing analog transmission model.
2011
2028
32,000
420
2,000
2,800
3,000
17
Previous page Next page Top

MPIP 2027-2029 · file page 22 printed page 18

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
1
National Quality Infrastructure (NQI) (Budget Proposal 
2025)
To fulfilling the desired outcome of the NQI system in the country, testing and 
calibration labs, referral centers, the referral Center for health research on 
cancerous inputs, Universities and other conformity assessment bodies inclusive 
of Industrial Technology Institute will also be developed with an effective 
coordination mechanism to have efficient service delivery for clients.
2025
2027
1,620
743
377
140
National Institute of Fundamental Studies (NIFS)
2
Stabilization of unstable slope - NIFS
To restore the embankments damaged by the earth slips occurred during Ditwah 
to ensure the safety and stability of the laboratory buildings of NIFS
2026
2027
250*
125
125
3
Scaling Up EcoFriendly Biofilm Bio fertilizer (BFBF) of 
NIFS (PPP)
To expand the application of an eco-friendly Biofilm Bio-fertilizer (BFBF) in 
paddy cultivation, with the objective of reducing the cost of chemical fertilizer 
and also minimize adverse consequences of chemical fertilizers to human as 
well as to the environment.
2026
2028
292 
(Domesti
c Fund - 
Rs. 40 
Mn)
13
10
13
Vidatha Programme
4
Strategic Industries Digital Enablement
Initiative 
To empower communities by promoting the adoption of innovative technologies 
and improved production practices among entrepreneurs through a structured, 
needs-based technology transfer framework, enhancing market access.
2026
2030
399
42
78
80
90
5
Establishing a National Incubation Network to Support 
Entreprenurenial Growth and Innovation Quality
To establish an integrated national incubation network to promote the 
commercialization of research, local innovations, and grassroots enterprises 
while providing SMEs and entrepreneurs with equitable access to product 
development, testing, and certification services.
2026
2030
501
141
200
17.6
6
National Initiative for Research and Development 
Commercialization
To create an Innovation Invention Fund for commercialization of Research 
Findings
2026
2028
2,500
228
1,286
1,000
*As per Cabinet Decision No. 26/1611/824/022, an allocation of Rs. 125 million each has been approved for the years 2026 and 2027.
Sector: Science and Technology
Cumulative 
Expenditure (as 
at 31.12.2025)
Project Period
Total Estimated 
Cost (TEC) 
Name of the Project
Revised Budget 
for 2026
Estimates for 
2027
Projection for 
2028
Projection for 
2029
Ongoing Projects
Ministry of Science and Technology
No
Objectives and Scope of the Project
Presidential Secretariat
18
Previous page Next page Top

MPIP 2027-2029 · file page 23 printed page 19

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
1
Smallholder Agribusiness Partnership Programme  
(SAPP) *
To contribute to smallholder poverty reduction and  sustainably increase the income 
and quality of diet of smallholders households involved in commercial - oriented 
production and marketing system
2017
2026
28,477
16,611
1,670
18
 
 
2
Smallholder Agribusiness Resilience Project (SARP)
To contribute to Sri Lanka’s smallholder poverty reduction and food security in the 
dry zone region. The development objective is to build resilience and market 
participation of 40,000 rural smallholder households in the project area  with women 
and youth.
2021
2029
17,573
1,803
9,021
4,560
3,150
888
3
Integrated Rurban Development and Climate Resilience 
Project 
To develop  entire agriculture sector through improving productivty, competitiveness 
and climate resilience.
2025
2030
30,000
21
6,920
8,725
7,100
8,100
4
Special Program for Food Security and Technology
To support activties which are aimed on assuring food security such as; increase 
productivity and production of specific crops, promotion of agro based industries and 
entrepreneurship development, management of water & soil nutrients and crop 
protection.
300
150
 
 
5
Development of Minor Irrigation, Village Tank cascade 
Systems and Abandoned Paddy Lands 
To enhance the cultivation of other field crops in abandoned and under utilized paddy 
lands and improve  productivity of agriculture lands.
3,000
2,000
2,200
2,500
6
National Seed Production and Purchasing Programme
To increase the food production in the country by improving seed production
1,250
1,250
1,300
1,350
7
Development of Youth entreprenures in Agriculture & 
Industry sector
To promote youth engagement in agriculture by facilitating youth entrepreneurship 
development
1,550
500
505
510
 
8
Agriculture Value chain Finance and Commercialization 
Programme
To develop agri food value chains into inclusive, sustainable and resilient value chains 
by increasing competitiveness, promoting agri exports and encouraging food imports.
2026
2030
30,000
 
7,141
10,585
200
1
National Programme for Paddy Productivity 
Enhancement through Advanced Yaya, Coupled with 
Advanced Technological Innovations -2027-2030
To increase national paddy productivity through  adoption of best-performing 
technological packages across selected Yaya fields. 
2027
2029
7,560*
 
400
600
500
2
Implementation of   Integrated Soil–Plant Nutrient 
Management System in Sri Lanka
To address the existing gaps in technical knowledge, institutional arrangement and 
farming practices relating to the plant nutrient management.
2027
2030
239
 
47
55
60
3
National Programme on Ensuring Seed Security through 
Enhanced Quality Seed Production -2027 2030
 To enhance and ensure the national quality seed availability of paddy, Other Field 
Crops (OFC), potato and beans through an integrated approach of public-private-
farmer modality.
2027
2030
2,365*
 
250
250
250
4
National Feld Crop Production Programme
To achieve national self-sufficiency in essential Other Field Crops (OFCs) by 
introducing high-yielding cultivation packages to farming communities operating 
within Yaya based systems, by paddy lands diversifying during the Yala season.
2027
2029
7,968*
 
800
1,000
1,200
5
Establishment of Modernized  25 Agrarian Service 
Centers in Every District to Provide All Essential 
Agricultural Services to Farmers Under One Roof 
To modernize the selected Agrarian Service Centers (ASCs) in 25 districts to facilitate 
and strengthen the service delivery for farmers. 
2027
2029
7,650*
 
250
650
630
6
GCF financial support for the Integrated Rurban 
Development and Climate Resilience Project
To finance cooling investments, energy efficient cooling facilities for public sector 
institutions, institutional support and capacity building.
2027
2030
12,096
 
20
20
 
Sector: Agriculture
Cumulative 
Expenditure (as at 
31.12.2025)
Project Period
  Total Estimated 
Cost (TEC)  
Name of the Project
Revised Budget for 
2026
Estimates for 2027
Projection for 2028
Projection for 2029
Ongoing Projects
Ministry of Agriculture, Livestock, Land and Irrigation
Ministry of Agriculture, Livestock, Land and Irrigation
No
Objectives and Scope of the Project
Annual
Ministry of Finance, Planning and Economic Development
New Projects
Annual
Annual
Annual
19
Previous page Next page Top

MPIP 2027-2029 · file page 24 printed page 20

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
Cumulative 
Expenditure (as at 
31.12.2025)
Project Period
  Total Estimated 
Cost (TEC)  
Name of the Project
Revised Budget for 
2026
Estimates for 2027
Projection for 2028
Projection for 2029
No
Objectives and Scope of the Project
7
Beyond the Harvest: Transforming Resilient Agrifood 
Value Chains (Global Agriculture and Food Security 
Programme GAFSP)
To improve the post harvest management practices along the agri-food value chains 
and strengthen the resilience and productivity of agrifood systems.
2027
2029
6,520
 
8
8
 
* To be revised as per the NPD recommendation
20
Previous page Next page Top

MPIP 2027-2029 · file page 25 printed page 21

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
1
Project on Improvement of Productivty in Dairy Sector (JICA) To improve milk productivty of small scale dairy farmers through strengthening the 
service delivery of Depaertment of Animal Production and Health and respective 
provincial departments in the areas of vaccine production, disease testing, animal 
breeding and feed production.
2026
2027
1,050
385
1,050
 
 
2
Development of Small and Medium Scale Livestock 
Development
To develop dairy, poultry, goat and swine farmers by providing subidized farm inputs, 
quality improvement of milk and milk products, encourage Good Animal Husbandry 
Practices (GAHP) and eco-friendly livestock farming.  
1,250
200
200
200
3
Establishment of Animal Breeder farms
To increase the animal production through improvement of genetic potential of farm 
animals
1,100
700
100
100
1
Importation of 2,000 No. of Sheep for meat purpose 
To establish a nucleus herd of sheep  for  the improvement of breeding potential and 
for the expansion of  breeding flock and distribution of breeding animals for 
multiplication particularly targeting commercial meat production.
2,027
2027
1,000
 
1,000
 
 
 
2
Cattle/Buffalow Breeder Farm Development project at NLDB 
farms
To imporve the genetic potential of domestic cattle and buffaloa herds by importing 
pure elite breeds of cattle and buffaloa to establish a nucleus herd and multiplication
2027
2029
1,750*
* To be revised as per the NPD recommendation
* Rs 700 mn has been included in the establsihment of animal breeder farms
Sector: Livestock
Cumulative 
Expenditure (as at 
31.12.2025)
Project Period
  Total Estimated 
Cost (TEC)  
Name of the Project
Revised Budget for 
2026
Estimates for 2027
Projection for 2028
Projection for 2029
Annual
New Projects
Ongoing Projects
Ministry of Agriculture, Livestock, Land and Irrigation
No
Objectives and Scope of the Project
Annual
21
Previous page Next page Top

MPIP 2027-2029 · file page 26 printed page 22

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
1
Cadastral Surveys in the Plantation Sector
Cadastral surveying and mapping, Monitoring the cadastral survey activities and 
coordinating with RPCs and other stakeholders on cadastral survey issues.*
2018
2027
700
363
110
193
 
 
2
Control and Suppression of diseases in coconut 
cultivation
Management of Weligama Coconut Leaf Wilt Disease (WCLWD) in the 
protective Zone by Coconut Research Institute and diseased Zone by Coconut 
Cultivation Board and Seedling Distribution for selected GN Divisions.
2023
2026
312
271
174
3
Enhancement of coconut production  through 
establishment of Northern coconut triangle  (Rs. 
1,650.00 Mn from domestic financing and
Rs. 3,478.00 Mn from beneficiary contribution).
To incraese the annual coconut yield by 100 Mn nuts and to incraese export 
income by USD 70 Mn through export of coconut and related products and 
thereby, to encourage local and foreign investors for the development of the 
coconut plantation industry.
2025
2027
5,128
399
600
650
 
 
4
Providing underutilized lands for investments
To incraese efficient and effective land utilization and productivity enhancement 
of underutilized lands in the plantation and agriculture sectors.
2025
2026
425
50
175
5
 
 
5
Infrastructure Development in the Estate Sector
Restore living conditions for estate families affected by disasters through 
improve line housing and amenities, Establish hygienic water and sanitation 
facilities,Ensuring a healthier enviornment, Empower estate youth, Enhance 
economic and social status of plantation community through livelihood projects 
and community development.**
1,985
3,000
3,000
3,500
6
Increasing the productivity of abandoned mature rubber 
cultivations through rehabilitation
To rehabilitate abandoned matured rubber cultivations to increase production  
and thereby, increase exports.
2026
2028
1,212
       
 
296
500
 
 
7
Assisting the Farmers for Revitalizing Ceylon Cinnamon 
Industry
Transforming Sri Lanka's cinnamon industry through achieving sustainable 
growth and global competitiveness.
2025
2027
453
93
250
8
Assisting the Farmers for Export Crop Development
To increase the Export Agriculture Crop (EAC) production by 30 % by 2030, 
and to incraese Export income of the EAC of  Sri Lanka by 80% by 2030 
compared to 2024.
1,164
1,179
1,218
1,264
1
Management of Weligama Coconut Leaf Wilt Disease 
(WCLWD) and reestablishment of the coconut 
cultivation in the affected areas of the Southern Province 
(Included under Control and Suppression of diseases in 
coconut cultivation in the Budget Estimate)
Prevent the spread of  Weligama Coconut Leaf Wilt Disease from affected areas 
to other disease free coconut growing areas of the country and to re-establish the 
coconut cultivation disease controlled areas in the Southern Province.
2027
2029
577
 
 
100
160
267
2
500 Ceylon Tea Villages
Adopt a multi-demensional and integrated approach to address the identified 
issues in the tea smallholding sector***
2027
2029
2,800
 
 
730
1,120
650
3
Sustainable Transformation of the Palmyrah Industry to 
Support Sri Lanka's Export-Led Growth and Rural 
Economic Development through Value Chain 
Enhancement, SME Promotion and Innovation
Increase the economic value and export competitiveness of the Palmyrah sector 
in Sri Lanka by improving production, quality standards, value addition and 
market access.***
2027
2028
236
 
 
100
136
 
New Projects
Ongoing Projects
Ministry of  Plantation and Community Infrastructure
Annual
Annual
Ministry of Agriculture, Livestock, Land and Irrigation
Ministry of  Plantation and Community Infrastructure
Sector: Plantation
Cumulative 
Expenditure (as 
at 31.12.2025)
Project Period
  Total 
Estimated Cost 
(TEC)  
Name of the Project
No
Objectives and Scope of the Project
Projection for 
2029
Projection for 
2028
Estimates for 
2027
Revised Budget 
for 2026
22
Previous page Next page Top

MPIP 2027-2029 · file page 27 printed page 23

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
Cumulative 
Expenditure (as 
at 31.12.2025)
Project Period
  Total 
Estimated Cost 
(TEC)  
Name of the Project
No
Objectives and Scope of the Project
Projection for 
2029
Projection for 
2028
Estimates for 
2027
Revised Budget 
for 2026
4
Project Preparation Grant for the Regional 
Empowerment through Vibrant, Inclusive and Viable 
Economies Project — Phase 2 (REVIVE 2) (Feasibility 
study)
Undertake value chain diagnostics, market analysis, and feasibility study to 
identify priority agri-food investments in the Northern and Eastern Provinces 
covering the key value chains in the agriculture, fisheries, livestock, and 
plantation sectors, as well as related rural enterprises.
2027
2028
330
 
 
261
69
 
5
National Ceylon Cinnamon Productivity, Quality and 
Global Market Development Programme (2027-2029) 
(Included under Assisting the Farmers for Revitalizing 
Ceylon Cinnamon Industry in the Budget Estimate)
Enhance productivity, quality, competitiveness and global  market positioning of 
Sri Lanka's Ceylon Cinnamon Industry by increasing national production to 
30,000 MT and export earnings to USD 350 Mn by 2029.
2027
2029
1,350
 
 
400
450
500
*TEC to be revised.
**Included the project titled "Implementation of a Mitigation Plan by National Building Research Organization (NBRO) for Housing Programme in Plantation Sector.
***Included under each respective implementing agency.
Ministry of Agriculture, Livestock, Land and Irrigation
23
Previous page Next page Top

MPIP 2027-2029 · file page 28 printed page 24

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
1
Development and Conservation of Lagoons
Development and Conservation of the aquatic environment around lagoons and 
inland reservoirs.
2018
2026
4,200
2,860
150
150
250
 
2
Development of Myliddy Fishery Harbour
Re - Activation of Myliddy Fishery Harbour (Stage I,II & III ) - safe berthing 
facilities, increase fish production.*
2021
2027
791
525
419
240
 
 
3
Construction of Gandara Fishery Harbour
Developing a fishery harbour of adequate capacity in Gandara, which would 
provide safe navigational access and shelter for a variety of fishing craft 
throughout the year.*/**
2020
2026
11,354
9,537
1,324
1,500
1,995
 
4
Construction of Rekawa Anchorage
Construction of Rekawa Anchorage - Safe Berthing Facilities.*
2020
2026
379
371
22
2
 
 
5
Improvement works at Inginiyagala, Murutawela, Dambulla, 
Iranamadu, Sevanapitiya, Kalawewa, Nuwara Eliya and 
Udawlawe (Tilapia,Carp & New), Pambala, 
Kahandamodara, Kallarawa Aquaculture Development 
Centers of NAQDA in order to enhance the fish/prawn seed 
production (NAQDA)
To increase fish seed supply and improve availability of quality freshwater fish.
2026
2027
250
100
150
 
 
6
Rehabilitation of Karainagar Boat Yard of Cey - Nor 
Foundation Limited (Indian Grant)
To Commence operation and create job opportunities by completion of the 
Karainagar Boat Yard.**
2026
2026
290
290
25
 
 
7
Renovation, Rehabilitation and Improvements of Existing 
Fishery Infrastructure of 15 Harbours
To improve the infrastructure available for fishing vessels to support increased 
fishing activities, enhance safety measures to reduce accidents and improve 
compliance and increase harbour capacity to handle large volume of boats and 
fish processing.*
2026
2028
1,804
1,300
300
205
 
8
Provide Infrastructure facilities for small scale landing sites 
to increase livelihood through post-harvest loss mitigation
To upgrade fishery landing sites to enable higher quality  and higher quantity 
fish production by minimizing the post - harvest losses.
2026
2026
500
500
 
 
 
9
Extension of the Existing Quay Wall, Access Road and 
Boundary Wall at Valachchenai Fishery Harbour
To uplift coastal fisheries sector by providing improved services to fisherman 
and boats and ensure safe navigation and reduce congestion of the harbour 
during peak hours.
2026
2028
1,139
350
450
200
100
10 Providing Supportive Equipment for Fisheries Industry from 
Government of Japan
To Strengthen the surveillance system to ensure safety of fisherman and 
establish cold chain facilities to improve quality and quantity of fish production 
in Northern and Eastern areas of Sri Lanka.**
2026
2026
1,075
1,001
150
 
 
11 Providing Electric Motor Bikes for Field Officers in 
Fisheries Sector (Indian Grant)
To enhance the operational mobility and effectiveness of the fisheries field 
officers in field visits, awareness, technical support, training programmes and 
monitoring activities to fishermen and aquaculture farmers and thereby, improve 
service delivery and accessibility to remote fishing and aquaculture 
communities and sites.**
2026
2026
345
 
 
232
 
 
1
Construction of three Finger jetties at wellamankara Fishery 
Harbour
To optimize the usage of harbour basin to anchor more boats which will result 
in increased availability of fish and reduced post-harvest losses.
2027
2028
649
 
 
300
346
 
2
Enhancing Value Addition in Culture-based Fisheries 
through Blast Freezer Technology
To address  the issue of spoilage of fish due to inadequate preservation 
techniques through the provision of blast freezers which enables the storage of 
fish at optimal conditions for longer periods preserving the structural intergrity, 
flavour and nutritional value.
2027
2029
300
 
 
100
100
100
Sector: Fisheries
Cumulative 
Expenditure (as 
at 31.12.2025)
Project Period
  Total Estimated 
Cost (TEC)  
Name of the Project
Revised Budget 
for 2026
Estimates for 
2027
Projection for 
2028
Projection for 
2029
Ongoing Projects
Ministry of  Fisheries, Aquatic and Ocean Resources
No
Objectives and Scope of the Project
New Projects
24
Previous page Next page Top

MPIP 2027-2029 · file page 29 printed page 25

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
Cumulative 
Expenditure (as 
at 31.12.2025)
Project Period
  Total Estimated 
Cost (TEC)  
Name of the Project
Revised Budget 
for 2026
Estimates for 
2027
Projection for 
2028
Projection for 
2029
No
Objectives and Scope of the Project
3
Fisheries Technology Development and Ensure Safety at 
Water
To address several critical technological, environmental, industrial and socio-
economic gaps affecting to the Sri Lankan fisheries sector at present, by 
establishing the country’s first integrated HDPE-based fisheries equipment 
manufacturing and recycling facility.
2027
2030
1,182
 
 
400
250
300
4
Integrated Marine Resources Management and Ecosystem 
Restoration Project
To address the increasing need for science-based fisheries and coastal resource 
management in Sri Lanka's marine and lagoon ecosystems through systematic 
marine surveys, acoustic surveys, stock assessments, habitat mapping and 
establishment of a structured surveillance data programme covering biological, 
physical, chemical and marine-aquatic non-living resource parameters. 
2027
2030
1,900
 
 
300
600
500
5
Fisheries Research , Innovation Technology and 
Commercialization
To increase the export earnings significantly through the production and 
commercialization of high-value sea cucumber products and value-added 
derivatives and to promote transition from unsustainable wild harvesting of the 
sea cucumber to controlled aquaculture systems, which will help conserve 
marine biodiversity and restore ecosystem balance. 
2027
2030
1,960
 
 
600
450
500
6
Strengthening Laboratory Facilities to Compliance the 
International regulations for the Sustainable Development of 
Fisheries and Aquaculture and Ocean Resources Sector in 
Sri Lanka
To establish a state-of-the-art Central Laboratory complex to bring all the 
existing analytical facilities available at different technical divisions of NARA 
and centralize the activities relevant to the research and services provided by 
NARA.***
2027
2029
6,937
 
 
100
3,000
3,800
7
National Fisheries Quality Assurance, Safety and Laboratory 
Network Project
To strengthen Sri Lanka’s fisheries quality assurance and food safety system 
through a coordinated national laboratory network.
2027
2030
6,595
 
 
771
1,935
1,935
8
Need Assessment /Feasibility /Studies/ Preparatory Work
To conduct need assessments /feasibility studies/ preparatory work for selected 
08 projects.
2027
2027
300
 
 
300
 
 
*TEC to be revised.
**Project Duration to be revised.
***PIC instructed to revalidate the TEC.
25
Previous page Next page Top

MPIP 2027-2029 · file page 30 printed page 26

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
1
Land Information Services System in Sri Lanka (LISS)
Strengthen the Sri Lanka’s land management capacity through the establishment of 
Land Data Infrastructure and Consolidated Land Administration System.
2022
2031
18,120
1
313
8
9
9
2
Bimsaviya Programme-Establishing land rights of people 
Establish a digital system for land information and to provide a globally recognized 
land title certification
739
800
850
900
3
Land Acquisition for State Purposes
Pay compensation for lands acquired for the State Purposes
2,165
1,400
1,500
1,600
1
Construction of Fourth Floor of Land Section of Ministry 
of Agriculture, Livestock, Lands and Irrigation*
To improve the working environment and operational efficiency of the Land Section 
by constructing the fourth floor of the existing building and providing adequate office 
accommodation and essential facilities.
2027
2028
495
345
150
Annual
New Projects
* Include under the operational capital in the budget for 2027
Annual
Ongoing Projects
Ministry of  Agriculture, Livestock, Lands and Irrigation
Sector: Land
Cumulative 
Expenditure (as at 
31.12.2025)
Project Period
  Total Estimated 
Cost (TEC)  
Name of the Project
No
Objectives and Scope of the Project
Revised Budget for 
2026
Estimates for 2027
Projection for 2028
Projection for 2029
26
Previous page Next page Top

MPIP 2027-2029 · file page 31 printed page 27

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
1
SME  Line of Credit  2 (GOSL/ADB)
Enhance SMEs’ access to finance, to support their recovery from the 
economic crisis and help to improve their adaptive capacity to deal with 
vulnerabilities stemming from changes in their business operating 
environment including from climate change.
2025
2030
 14,840
Revolving 
 fund 
511
5,936
5,938
 
2
Stimulating Loan Scheme for Re-energizing the MSME 
Sector
Assist the existing MSMEs to survive, recover and expand and to 
provide seed capital for new MSMEs to commence business.
2024
Annual
 
Revolving 
 fund 
29,982
30,000
30,000
30,000
30,000
3
SME Sector Development Programme (GOSL/ADB)
Design a sector development programme that strengthens Sri Lanka's 
MSME financing eco-system and financial literacy.
2026
2028
34,500
7,750
17,250
8,625
 
4
Colombo Port City Development Project
Infrastructure Development
Provide necessary basic infrastructure such as water, electricity, 
drainage etc.
2016
2027
10,508
9,527
876
4,000
1,000
 
5
Creating an Investment Friendly Environment
Introduce necessary reforms to improve transparency and reduce time 
cost, procedures enabling to create a healthy business environment.
2023
2027
400
115
1,600
1,000
1,500
1,500
6
External Infrastructure Development work for establishment 
of new Investment Promotion Zone in Bingiriya Economic 
Processing Zone
Develop External Infrastructure work for establishment of new 
Investment Promotion Zone in Bingiriya Economic Processing Zone.
2019
2027
3,239
1,424
1,487
800
250
 
7
National Trade Single Window -NSWP
Establish a single-entry point for submission of application, documents 
and information by the import, export and transit traders to fulfill border 
regulatory requirements in Sri Lanka.
2024
2027
5,921
65
500
1,990
 
8
Industrial Estate Development Programme (Establishment of 
an Industrial Estate in the  Kalutara  (Ingiriya), Kalutara  
(Raigama - Millaniya Stage II), Gampaha  (Katunayaka), 
Matale District (Dambulla), Anuradhapura (Nochchiyagama), 
etc)
Establish New Industrial Estates and renovation of existing Industrial 
Estates with key infrastructure facilities and services (electricity, water, 
road network) to upgrade the industry sector in the country and thereby 
increase its contribution to country's Gross Domestic Production (GDP).
2023
2029
Annual
824
5,000
3,200
4,800
7,400
9
Establishment of Business Incubators in 9 Provinces - Sri 
Lanka
Promote Entrepreneurship and Innovation of the country, mainly via 
supporting start-ups, accessing to mentorships and innovation eco 
system.
2026
2027
285
94
191
 
 
10 Sri Lanka Expo
Showcase Sri Lanka’s diverse export industries including agricultural, 
industrial, services, tourism and hospitality sectors, Increase export 
revenue up to US$ 36 Bn by 2030.
2026
2027
732
450
282
 
 
11 Development of Handicraft sector in Sri Lanka 2026 - 2030 
Find sustainable solutions for identified issues and problems in the 
handicrafts sector in Sri Lanka.
2026
2030
420
72
50
116
79
12 Establishing Productivity Evaluation Mechanism for Public, 
Manufacturing and Service and School sectors, through 
National Productivity Awards (NPA)
Encourage institutions encompassing three key sectors, namely (1) 
Schools, (2) Manufacturing & Services and (3) Public sector evaluating 
on the implementation of productivity concepts, resource optimization 
and sustainable development practices that enhance quality, efficiency, 
and service delivery.
2025
2027
385
78
174
133
 
 
 Presidential Secretariat (under Clean Sri Lanka Programme)
 Ministry of Industry and Entreprenuership Development
Ongoing Projects
Ministry of  Finance, Planning and Economic Development
Sector: Industry, Trade and Investment Promotion
Cumulative 
Expenditure (as 
at 31.12.2025)
Project Period
  Total Estimated 
Cost (TEC)  
Name of the Project
No
Objectives and Scope of the Project
Revised Budget 
for 2026
Estimates for 2027
Projection for 
2028
Projection for 
2029
27
Previous page Next page Top

MPIP 2027-2029 · file page 32 printed page 28

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
Cumulative 
Expenditure (as 
at 31.12.2025)
Project Period
  Total Estimated 
Cost (TEC)  
Name of the Project
No
Objectives and Scope of the Project
Revised Budget 
for 2026
Estimates for 2027
Projection for 
2028
Projection for 
2029
13 Producer Cooperative Society for youth entrepreneurs
Provide agricultural equipment to rural agricultural production 
cooperatives, with the broader goal of creating an innovative 
transformation in the rural agricultural sector.
2025
2028
800
55
100
100
200
300
1
Establishment of an Industrial Estate in the  Batticaloa 
District -Valachchenai 
Drive regional industrial growth, enhance infrastructure, and generate 
local employment by establishing an industrial estate in Valachchenai 
within the Batticaloa District.
2027
2031
3,000
500
700
900
2
Renovation of Internal road & Drain System - Rathmalana IE
Upgrading industrial infrastructure by rehabilitating internal roads and 
drainage systems to provide an efficient, functional environment for 
businesses operating in the Ratmalana Industrial Estate.
2027
2027
300
300
 
 
3
Establish the Ministry of Industry and Entrepreneurship 
Development in the new office premises in Narahenpita 
owned by the Urban Development Authority (UDA)
Improving operational efficiency by relocating and centralizing the 
Ministry of Industry and Entrepreneurship Development into a modern, 
UDA-owned office facility in Narahenpita.
2027
2029
3,429
1,860
1,500
69
4
Establish a general testing hub for analyze Textile, Apparel, 
Leather, Footwear, Food, Material, Chemical, Dyes Water, 
for necessary enhancement of quality of products oriented for 
local and export market and extend support for research and 
development in relevant sectors by Sri Lanka Institute of 
Textile and Apparel (SLITA)
Enhance product quality assurance and drives research and development 
across multiple manufacturing sectors, through a central testing facility 
and SLITA support, to meet domestic and export market standards.
2027
2029
564
300
164
100
5
Establishment of Traditional Crafts Promotional Villages
Foster rural entrepreneurship and preserve cultural heritage by 
establishing craft promotion villages that empower local artisans with 
sustainable livelihood opportunities.
2027
2031
500
100
100
100
 Ministry of Trade, Commerce, Food Security and Co-operative Development
 Ministry of Industry and Entreprenuership Development
New Projects
28
Previous page Next page Top

MPIP 2027-2029 · file page 33 printed page 29

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
1
Market Development Facility Project (MDF) - GOSL 
/Australia 
Foster inclusive economic growth and poverty reduction
2022
2027
2,500
30
2
IDA Grant Facility for THRIVE Colombo Project Preparation
(GFPP )
The objective of the proposed grant facility is to enable the successful 
implementation of the World Bank-funded Tourism for Heritage, Resilience, 
Inclusion and Value-driven, Employment Project (THRIVE project) by financing 
essential preparatory activities. These include strengthening key tourism 
institutions and completing detailed planning, design, and safeguard studies for 
proposed tourism investments.
2026
2027
660
108
123
3
Development Assistance- Development of Tourists 
Attractions
To ensure the sustainable growth in the Tourism Industry focusing development 
of tourism in rural area.
To create direct and indirect employment opportunities and increasing streams of 
income for small entrepreneurs and commercial operators.
To develop and popularize lesser-known tourist attractions in the country under 
the varieties of thematic initiatives.
To increase the rural community participation in tourism.
2025
2027
3,102
276
800
360
4
Tourism for Heritage, Resillience, Inclusion and Value-
Driven Employment project (GOSL/WB) - THRIVE Colombo 
To develop and promote sustainable, high-value, nature-based and heritage 
tourism destinations, with a special focus on restoring and showcasing 
Colombo’s colonial-era heritage sites and cultural assets, in order to enhance 
visitor experiences, generate local employment, stimulate inclusive economic 
growth, and strengthen cultural and environmental preservation, while 
establishing responsible tourism governance and empowering local communities 
through integrated tourism value chains.
2026
2030
29,126
50
136
3,019
5,742
5
Sustainable Tourism Development Project (GOSL/ADB)
Transform the tourism sector into a resilient, inclusive, and sustainable engine of 
economic growth, through improved Sector Governance & Strategic Reforms and 
Targeted Infrastructure & Destination Development.
2025
2028
30,000
                
1,475
3,000
3,150
1,387
Rivesed Budget for 
2026
Estimates for 2027
Projection for 2028
Projection for 2029
Total Estimated 
Cost (TEC)
Cumulative 
Expenditure (as at 
31.12.2025)
Ongoing Projects
Ministry of Foreign Affairs, Foreign Employment and Tourism
Sector: Tourism
No
Name of the Project
Objectives and Scope of the Project
Project Period
29
Previous page Next page Top

MPIP 2027-2029 · file page 34 printed page 30

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
1
Transport Project Preparatory Facility (TPPF) - Resettlement 
of Unauthorized residents in the Keleni Velly Railway 
Reservation 
Resettlement of families living in railway Right-of-Way (ROW) to cater 
proposed railway line development.
2017
2025
11,255
5,717
840
900
200
 
2
Colombo Suburban Railway Efficiency Improvement Project 
(GOSL-ADB)
Improving railway efficiency, safety, and sustainability to support safe and 
efficient movement of people and goods.
2019
2027
40,186
24,488
4,935
12,680
800
 
3
Rehabilitation of permanent way with new rails and sleepers 
The project involves replacing aged and damaged rails and sleepers along 
the railway track to improve safety, operational reliability, and passenger 
comfort.
4,450
6,100
7,500
8,000
8,500
4
Railway development projects under USD 318 Mn. Credit 
Line - Procurement of 160 nos. passenger coaches and 
improvement of Rathmalana workshop, double tracking from 
Polgahawela - Kurunegala rehabilitation and installation of 
signalling from Maho - Omantha (GOSL/ India) 
Rehabilitating and upgrading railway infrastructure and rolling stock to 
provide safe, reliable, and efficient passenger services
2019
2026
48,494
Track -
20,952
Signaling - 
763
9,000
3,000
 
 
5
Rehabilitation of old rail passenger coaches
The project involves refurbishing old passenger coaches to improve safety, 
comfort, and service reliability while extending their operational life.
2025
2027
1,800
65
800
600
650
700
6
Manufacturing new passenger coaches
Manufacturing passenger carriages locally for Sri Lanka Railways (SLR) to 
enhance passenger comfort, promote local industry, and reduce the burden 
on the national budget.
2025
2027
950
 
500
500
550
600
7
Kelani Railway Bridge Project 
Rehabilitation of Kelani Railway Bridge. 
1,200
1,500
1,500
1,000
8
Acquiring 600 New 49-54 seater standard buses for Sri Lanka 
Transport Board for long distance operations
Providing efficient, comfortable, and reliable long-distance Deluxe bus 
services while increasing SLTB revenue and reducing emissions through 
Euro IV compliant buses
2025
2026
17,766
 
3,600
6,000
4,800
 
9
Development of Kandy Railway Station to Align and Integrate 
with Kandy Multimodal Transport  Terminal (KMTT)
Upgrading and integrating Kandy Railway Station with the KMTT to 
improve service quality, capacity, passenger experience. 
2026
2030
1,500
 
768
500
 
 
10 Procurement of 5 nos. of DMUs
Providing safe, efficient, and comfortable passenger train services through 
value-added fully air-conditioned train sets for suburban commuters
2026
2028
16,500
 
3,300
5,000
8,300
 
11 Replacement of 10 old railway bridges
Replacing deteriorated railway bridges to enhance railway safety, improve 
passenger and freight services, and increase railway revenue
2026
2029
8,025
 
370
1,850
1,000
500
12 Double tracking of railway line from Polgahawela to 
Kurunegala
Improving railway infrastructure to provide efficient passenger and freight 
services, enhance value-added services, and increase railway revenue.
2026
2029
22,555
 
100
4,000
 
 
13 Development of Kelani vally Railway track from Maradana to 
Rathnapura
Providing an efficient passenger rail service in the Kelani Valley, reducing 
travel time and road congestion, while supporting future network expansion
2026
2030
28,000
 
500
330
6,000
7,000
14 Maintanance of Signaling and Communication System 
Maintaining signaling and communication systems to improve railway 
safety, reliability, and operational efficiency.
850
1,500
2,500
3,000
Ongoing Projects
Ministry of Transport, Highways and Urban Development 
Projection for 
2029
Projection for 
2028
Estimates for 2027
Revised Budget 
for 2026
Annual
Annual 
Annual 
Sector: Transport
Cumulative 
Expenditure (as at 
31.12.2025)
Project Period
  Total Estimated 
Cost (TEC)  
Name of the Project
No
Objectives and Scope of the Project
30
Previous page Next page Top

MPIP 2027-2029 · file page 35 printed page 31

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
Projection for 
2029
Projection for 
2028
Estimates for 2027
Revised Budget 
for 2026
Cumulative 
Expenditure (as at 
31.12.2025)
Project Period
  Total Estimated 
Cost (TEC)  
Name of the Project
No
Objectives and Scope of the Project
15 Major Reparis to Rolling Stock
Restoring and upgrading rolling stock to ensure safe, efficient, and reliable 
railway operations.
4,000
5,000
6,000
7,000
16 Minor Repairs to Rolling Stock
Maintaining rolling stock in optimal condition to support safe, efficient, 
and uninterrupted railway services.
3,000
3,500
4,000
4,500
17 Plant Machinery and Equipment - Replacement 
Modernizing plant machinery and equipment to strengthen operational 
capacity and ensure efficient, reliable operations.
850
2,000
2,000
2,200
18 Installation Level Crossing Protection
Reducing rail-road crossing accidents and enhancing transport safety 
through modern level crossing protection measures.
 
700
700
700
19 Rehabilitation of Steel Bridges (SLR)
Restoring and strengthening steel bridges to ensure safe, resilient, and 
reliable transport infrastructure
 
200
300
300
20 Production of Concrete Sleepers
Supporting the modernization and sustainability of railway infrastructure 
through the production of durable concrete sleepers.
 
300
330
360
21 Surveys, Investigations and Feasibility Studies
Supporting data-driven decision-making and optimizing  planning through 
detailed surveys and feasibility studies
500
1
Establishment of the Cluster-based Bus Operation Model in 
selected Provinces & Districts in Sri Lanka as pilot 
Operation/Project
The project aims to introduce a cluster-based bus operation model in 
selected provinces and districts as a pilot initiative to improve the 
efficiency, coordination, and quality of public transport services while 
enhancing passenger convenience.
2027
2029
526
 
 
200
300
 
2
Metro EV Bus Development project - 2027
Developing the essential infrastructure required for electric buses
2027
2027
5,990
 
 
4,500
 
 
3
Construction of a New Office Complex for the Head Office of 
the Deparment of Motor Traffic at the Werahera Office 
Premises
Constructing a modern green office complex for the Department of Motor 
Traffic to enhance public service delivery, digitalization, operational 
efficiency, and customer convenience.
2027
2029
8,000
 
 
500
3,750
3,750
4
Implementation of a Vehicle Registration and
Transfer System at Department of Motor traffic
Implementing a digital vehicle registration and transfer system to improve 
service efficiency, transparency, and public convenience while reducing 
congestion and manual intervention.
2027
2029
1,473
 
 
700
300
426
5
Digital Driver Demerit Points and Road Safety Enforcement 
Platform for Sri Lanka
Establishing a secure, transparent, and digital Driver Demerit Points 
System to improve traffic enforcement, road discipline, and public trust.
2027
2029
2,245
 
 
1,500
700
 
6
Construction of Kelani Valley (KV) Line from Maradana to 
Avissawella (Electrification)
Developing the Kelani Valley (KV) Railway Line to provide efficient, 
sustainable, and passenger-oriented rail services, promote transit-oriented 
development, and support urban growth.
2027
2032
424,293
 
 
45,000
75,850
75,850
7
Construction of Main Line from Maradana to Rambukkana of 
Sri Lanka Railways (Electrification)
Developing and electrifying the Main Line in the Colombo suburban area 
to provide efficient, safe, and integrated passenger and freight transport 
services, support transit-oriented development, and meet future travel 
demand
2027
2031
459,651
 
 
16,400
110,800
110,800
8
Construction of Coastal Railway Line from Maradana to 
Kalutara South (Electrification)
Developing and electrifying the Coastal Railway Line to meet future 
passenger demand, improve sustainable rail transport, and support transit-
oriented urban development
2027
2031
313,715
 
 
17,700
74,000
74,000
9
Railway station Modernization and standardization Programme Upgrading and standardizing railway stations to improve accessibility, 
passenger facilities, safety, and passenger flow management,
2027
2030
13,520
 
 
2,000
3,500
3,500
Annual
 Ministry of Transport, Highways and Urban Development 
Annual 
Annual 
New Projects
Annual 
Annual
Annual
Annual
31
Previous page Next page Top

MPIP 2027-2029 · file page 36 printed page 32

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
Projection for 
2029
Projection for 
2028
Estimates for 2027
Revised Budget 
for 2026
Cumulative 
Expenditure (as at 
31.12.2025)
Project Period
  Total Estimated 
Cost (TEC)  
Name of the Project
No
Objectives and Scope of the Project
10 Construction of New rail track from
Mavaththipuram to CPSTL Bulk Depot to
support petroleum product transpotation
Optimizing the fuel supply chain to ensure reliable fuel distribution, 
improve transport efficiency, and support regional economic development.
2027
2029
688
 
 
250
300
138
11 Renovation of Workshop 27 & 28 at Ratmalana (SLR)
Upgrading and modernizing railway workshops to improve locomotive and 
rolling stock maintenance, operational efficiency, and staff working 
conditions.
2027
2028
405
 
 
150
150
105
12 Acquiring 50 Nos.New 22 Seater Mini Buses for Sri lanka 
Transport Board for operation in disaster affected Hilly & 
Rural Roads
To provide more reliable, efficient and dependable bus service to people 
affected by the "Ditwah" cyclone in hilly and rural routes
2027
2027
1,000
 
 
1,000
 
 
13 Procuring 200 Nos.30-33 seater small new normal buses for 
Sri Lanka Transport Board for rural operations
To provide an efficient and dependable bus service to rural commuters
2027
2027
4,000
 
 
4,000
 
 
14 SLTB Total Digital Transformation and Integrated 
Management System Development Project
Digitalizing SLTB operations through integrated management systems to 
improve efficiency, transparency, revenue management, and service 
delivery
2027
2029
900
 
 
200
350
350
15 Acquiring 100 New Battery Electric Buses for Sri Lanka 
Transport Board through a grant from China (Grant)
To provide comfortable, efficient and dependable luxury bus service to 
commuters travelling on  expressways & long distance routes,To reduce 
emission of harmful gases by replacing similar number of existing diesel 
buses
2027
2027
14700 
(Grant)
32
Previous page Next page Top

MPIP 2027-2029 · file page 37 printed page 33

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion Year
1
Colombo - Rathnapura - Pelmadulla Expressway 
The project involves the construction of the first phase of the Colombo-
Ratnapura-Pelmadulla Expressway from Kahatuduwa to Ingiriya, aiming to 
improve connectivity, reduce travel time, and support economic development
2017
2025
60,695
6,786
1,500
27,000
40,000
45,000
2
Port Access Elevated Highway Project (GOSL - ADB) 
The elevated Port Access Expressway will strengthen regional connectivity, 
reduce traffic congestion, and provide an efficient connection between the 
Colombo Port and the expressway network. 
2019
2027
77,969
60,486
12,500
10,750
550
 
3
Central Expressway Section 01 - Kadawatha to Meerigama 
(GOSL - China Exim Bank)
To construct a modern expressway connecting Kadawatha to Meerigama 
(Section 01 of Central Expressway)
2020
2028
176,785
135,728
64,150
51,000
40,000
6,500
4
Central Expressway Section 02 - Meerigama to Kurunegala Construction of modern expressway from Mirigama to Kurunegala (Part 2 of 
Central Expressway)
2016
2021
144,600
 
350
200
 
 
5
Central Expressway Section 03 - Pothuhera to Galagedara 
Construction of modern expressway from Potuhera to Galagedara (Part 3 of 
Central Expressway).
2016
2029
214,866
64,583
30,500
28,000
30,000
30,000
6
Central Expressway Section 04 – Kurunegala to Dambulla 
Construction of modern expressway from Kurunegala to Dambulla (Part 4 of 
Central Expressway).
2016
2029
179,831
1,558
1,006
30,000
36,000
35,000
7
Baseline Road - Phase III
Upgradation of Baseline Road and related land acquisition process
2007
2023
7,200
3,192
1,000
2,000
1,200
200
8
Rehabilitation of Peradeniya-Badulla - Chenkalady Road 
from Badulla to Chenkalady (GOSL - SFD) 
Rehabilitation of Ampara-Uhana road and improvements of Chenkalady 
junction.
2024
2026
8,361
2,846
610
1,000
 
 
9
Road Network Development Project (GOSL- SFD) 
Construction of Kurinchankerny bridge, construction of 1/4 Ambatale bridge 
and road section in Homagama 
2013
2027
9,755
9,210
1,637
1,300
 
 
10 Road Network Development Project (GOSL- OPEC) 
Construction of Maharagama-Piliyandala road section.
2013
2025
7,035
5,989
440
650
 
 
11 Colombo District Road Development Project (GOSL-OFID) Reconstruction of Maharagama Piliyandala Road (stage 1 - 1.8 Km)
2013
2026
23,110
22,494
1,810
155
150
 
12 Western Province National Highways (GOSL-OFID)
Reconstruction of bridge 1/9 on Orugudawatta - Ambatale Road
2017
2026
6,447
6,111
288
65
 
 
Rehabilitation of Bibila-Lunugala road and Climate Recilient Project at 
Beragala-wellawaya road
2022
2025
Climate Resilient / Slope Protection Project from Badulla to Bibile & 
Improvements of Kandehandiya - Randenigala Road 
2025
2027
14 Marine Drive Extension up to Panadura
Construct an alternative road for reduce traffic congestion in Colombo-Galle 
road
2014
2024
5,346
245
25
 
 
 
15 Gap Financing of the Road Development Authority's 
commitments
To ensure the timely completion and sustainability of ongoing and planned road 
infrastructure projects by addressing financial shortfalls in the Road 
Development Authority's commitments
162,568
45,049
39,400
40,000
40,000
16 Land Acquisition for Completed and Ongoing Projects
Timely land acquisition for completed and ongoing projects to minimize project 
delays and social disruptions
7,500
8,000
3,500
3,500
3,000
17 Surveys, Investigations and Feasibility Studies
Supporting data-driven decision-making and optimizing infrastructure 
development planning through detailed surveys and feasibility studies
158
1,290
668
707
753
18 Rehabilitation of the A 17 Road Corridor from Rakwana to 
Suriyakanda (GOSL / OFID IV) 
Development of 18 km at A17 road corridor from Rakwana to Suriyakanda
2021
2025
7,600
6,619
2,872
300
 
 
19 Inclusive Connectivity & Development Project (GOSL/WB)
To enhance inclusive, safe, and sustainable transport solutions by improving 
infrastructure, accessibility, and connectivity for all users, including vulnerable 
communities
2021
2027
57,318
30,918
13,390
13,720
1,500
 
No
Objectives and Scope of the Project
Sector: Highways
Cumulative 
Expenditure (as at 
31.12.2025)
Project Period
  Total Estimated 
Cost (TEC)  
Name of the Project
Revised Budget for 
2026
Estimates for 2027
Projection for 2028
Projection for 2029
Ongoing Projects
Ministry of Transport, Highways and Urban Development 
 
1,700
13 Rehabilitation of Peradeniya-Badulla - Chenkalady Road 
from Badulla to Chenkalady (GOSL-OFID) 
Annual
Annual
Annual
500
7,590
3,963
1,130
33
Previous page Next page Top

MPIP 2027-2029 · file page 38 printed page 34

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion Year
No
Objectives and Scope of the Project
Cumulative 
Expenditure (as at 
31.12.2025)
Project Period
  Total Estimated 
Cost (TEC)  
Name of the Project
Revised Budget for 
2026
Estimates for 2027
Projection for 2028
Projection for 2029
20 Kandy Multimodal Transport Terminal Development 
Project (GOSL - WB) 
Developing the Kandy Sustainable Multimodal Transport Terminal to improve 
urban mobility, reduce congestion, and enhance the passenger experience
2021
2027
32,833
10,498
10,754
14,000
2,000
 
21 Integrated Road Investment Programme (I - Road) - Phase I 
(GOSL-ADB) 
Under the iRoad Programme, approximately 3,000 km of rural roads in the 
Southern, Sabaragamuwa, Central, North Western, North Central Provinces, 
and the Kalutara District of the Western Province are being 
improved/rehabilitated and maintained
2014
2024
135,900
98,766
500
500
 
 
22 Integrated Road Investment Programme (I - Road) - Phase 
II (GOSL-ADB) - 
Under the iRoad Programme, approximately 3,000 km of rural roads in the 
Southern, Sabaragamuwa, Central, North Central, and North Western 
Provinces, as well as the Kalutara District of the Western Province, are being 
improved, rehabilitated, and maintained
2018
2027
152,168
124,527
16,020
20,000
1,000
 
23 Development of Access Roads to Kandy Multimodal 
Transport Center 
To  improve accessibility to the Kandy Multimodal Transport Hub by 
developing well-integrated, efficient access roads
2024
2025
1,500
379
700
325
 
 
24 Reconstruction of Damaged / Weak Bridges on National 
Highways  
Identifying the existing bridges in the national road network that need to be 
urgently renovated and carrying out renovation work.
1,465
4,000
4,000
4,500
 
25 Construction of Rural Bridges using old Bridge Component 
Identifying the existing bridges in the rural road network that need to be 
urgently renovated and carrying out the restoration work of those bridges using 
old bridge parts
373
2,500
2,000
2,200
 
26 Design and Construction of Flyovers in Kohuwala and 
Gatambe 
To ease traffic congestion and improve connectivity by designing and 
constructing flyovers in Kohuwala and Gatambe
2021
2028
20,561
8,101
7,600
3,000
1,150
 
27
Construction of Flyovers over the Railway Line at 
Uttharananda Mawatha and near the Slave Island Railway 
Station
To reduce traffic congestion, improve connectivity, and enhance road safety by 
constructing flyovers over the railway line at Uttharananda Mawatha and near 
the Slave Island Railway Station.
2021
2025
9,133
12,790
330
200
 
 
28 Rehabilitation of Garagoda Bridge on Yatiyanthota – 
Magammana Road
Giving quick access to the towns to the people of the area by renovating the 
Garagoda bridge on the Yatianthota-Magammana road
2024
2025
415
126
50
50
 
 
29 Construction of system interchange at Kadawatha and 
500m road towards Meerigama in Central Expressway 
The project involves the construction of a system interchange at Kadawatha and 
a 500m connecting road towards Meerigama to improve connectivity between 
expressway corridors, enhance traffic flow, and reduce travel time on the 
national expressway network.
2025
2027
10,257
3,264
6,820
2,450
500
 
30 Construction of Petta and Aluthmawatha interchanges with 
ramps
The improve traffic flow and connectivity by constructing the Pettah and 
Aluthmawatha interchanges with ramps while enhancing access to key 
transport routes.
2025
2026
15,000
 
3,000
2,700
1,200
 
31 Enhancement of National Traffic Database and Capacity 
Building (GOSL-KOICA)
Improvement of National Traffic database and capacity building
2020
2021
1,200
370
50
20
10
 
32 Infrastructure and Road Safety
Improving road infrastructure and safety features to minimize road accidents.
150
4,250
2,100
2,000
2,200
33 Traffic Management
Making essential improvements to reduce traffic congestion on roads.
94
500
400
500
600
34 Improvement of Junctions (11) in Baseline Road
Improving 11 major intersections along Baseline Road to enhance traffic 
efficiency, road safety, and connectivity while reducing traffic congestion
2026
2027
1,490
 
990
400
100
 
35
Conducting a Feasibility Study for the Construction of 
Connectivity from the Port Access Elevated Highway 
(PAEH) to the Marine Drive Extension (Phase 2) & 
Minimizing the Traffic Congestion in the Lotus 
Roundabout Area
Assessing the feasibility of establishing a direct connection between the PAEH 
and the Marine Drive Extension while reducing congestion in the Lotus 
Roundabout area
2026
2027
330
 
105
175
50
 
Annual
Annual
Annual
Annual
34
Previous page Next page Top

MPIP 2027-2029 · file page 39 printed page 35

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion Year
No
Objectives and Scope of the Project
Cumulative 
Expenditure (as at 
31.12.2025)
Project Period
  Total Estimated 
Cost (TEC)  
Name of the Project
Revised Budget for 
2026
Estimates for 2027
Projection for 2028
Projection for 2029
36
Improve People Accessibility and Traffic Circulation in 
Kandy Central Business District after Implementing the 
KMTT
Improving accessibility and traffic circulation within the Kandy CBD following 
the implementation of the Kandy Multimodal Transport Terminal (KMTT)
2026
2029
4,402
 
412
1,950
1,000
 
37 Improving Bus Management and Operations in Kandy 
District to Optimize Benefits from the KMTT
To strengthen bus management and operations in the Kandy District in order to 
maximize the efficiency and benefits of the Kandy Multimodal Transport 
Terminal (KMTT).
2026
2029
460
 
210
185
400
 
38 Rehabilitation and improvement of William Gopallawa 
Mawatha
To construct William Gopallawa Mawatha (AB042) to enhance road 
connectivity, improve traffic flow, and provide safer and more efficient 
mobility for commuters.
2026
2028
950
 
241
400
 
 
39 Construction of Structures at Meda Ela – William 
Gopallawa Mawatha (AB042)
To construct necessary structures along Meda Ela on William Gopallawa 
Mawatha (AB042) to improve road safety, ensure proper drainage, and enhance 
overall functionality of the roadway.
2026
2028
650
 
236
275
50
 
40
Improvement of Ambilipitiya – Panamure – Buluthota 
Road (B115) from Kolonna to Suriyakanda (29+000Km to 
38+620Km)
Improving road safety and connectivity through the upgrading of the 
Kolonna–Suriyakanda section of the Embilipitiya–Panamure–Buluthota Road 
(B115)
2026
2029
3,202
 
1,005
760
1,000
 
41
Widening and Improvement of Katugastota – Kurunegala-
Puttalam-A010 Road from Katugastota to Galagedara 
(0+000 Km to 13+400 Km)
Improving road safety and connectivity through the upgrading of the 
Katugastota–Galagedara (A010) Road
2026
2029
30,180
 
1,000
4,250
15,000
10,000
42 Road Maintenance and Improvement
Implementing road maintenance and development activities to improve road 
safety, traffic efficiency, and connectivity.
26,091
32,000
31,200
34,000
38,000
43 Construction of Mahaiyawa Tunnel with Related Road 
Improvement
Constructing the Mahaiyawa Tunnel to reduce traffic congestion and improve 
road safety, traffic efficiency, and connectivity
2026
2028
825
 
520
180
50
44 Widening and Improvements of Roads (Island wide)
Carrying Out Essential and Emergency Repairs to the Road System Covering 
the Entire Island
5,934
22,000
22,000
25,000
27,000
45 Construction of Vadduvakal Bridge in Mullaitivu
Constructing the Vadduvakal Bridge to improve connectivity, accessibility, and 
regional development
2025
2028
1,379
 
1,200
500
 
 
46 Rural Road Reawakening Programme - Maga Neguma 
Promoting livelihoods, economic growth, and employment opportunities 
through the improvement of rural connectivity and infrastructure.
 
 
17,500
15,500
15,500
47 Rural Road and Bridges Programme
Improvement of rural roads and rural bridges islandwide.
Annual
4,500
4,500
4,500
1
Construction of Flyover over the Railway line at the 
entrance to the Kandy Multimodal transport Terminal near 
Kandy Post Office 
Reducing traffic congestion around the Kandy Multimodal Transport Terminal 
(KMTT) while improving road safety and traffic efficiency
2027
2029
6,947
 
 
1,200
3,250
2,500
2
Construction of a Flyover Bridge; At the Railway Crossing 
at Alawwa on the Alawwa-Maharagama Road
Improving traffic efficiency by reducing delays, congestion, and safety risks 
caused by railway gate closures
2027
2029
1,042
 
 
400
500
400
3
Construction of a Flyover Bridge; At the Railway Crossing 
on the Ambepussa- Kurunegala- Trincomalee Road (A06) 
near Muttettugala Railway Station
Improving traffic efficiency by reducing delays, congestion, and safety risks 
caused by railway gate closures
2027
2029
1,043
 
 
300
500
200
4
Construction of a Bridge and a Causeway across Kokkilai 
Lagoon
Establishing a direct road connection across the Kokkilai Lagoon to enhance 
connectivity between the Northern and Eastern Provinces while promoting 
trade and economic development
2027
2029
6,000
 
 
600
3,400
2,000
New Projects
Annual
Annual
Annual
35
Previous page Next page Top

MPIP 2027-2029 · file page 40 printed page 36

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion Year
No
Objectives and Scope of the Project
Cumulative 
Expenditure (as at 
31.12.2025)
Project Period
  Total Estimated 
Cost (TEC)  
Name of the Project
Revised Budget for 
2026
Estimates for 2027
Projection for 2028
Projection for 2029
5
Development of Access Roads to the Angampitiya- Nawala 
Bridge to Establish Connectivity Between B120 (Etul 
Kotte- Mirihana-Kohuwala) and B470 (Welikada-Nawala) 
National Road Corridors
Improving road connectivity, traffic efficiency, and travel convenience through 
the development of access roads to the Angampitiya–Nawala Bridge
2027
2029
2,000
 
 
500
1,695
 
6
Realignment and Improvement of Panadura-Nambapana- 
Rathnapura A008) from Ingiriya to Rathnapura (33+750km 
to 67+770km) 
Upgrading the Ingiriya–Ratnapura (A008) Road to reduce traffic congestion 
and improve travel time and road safety
2027
2030
22,200
 
 
2,800
13,000
6,500
7
Construction of Kiran Bridge
Establishing a direct and reliable road connection across the Kiran Causeway to 
reduce travel distance and time, while improving access to the A5 highway
2027
2029
1,750
 
 
400
900
450
8
Construction of Pondukalchenai Bridge
Establishing a stable and reliable road connection to improve community 
connectivity, accessibility, road safety, and regional economic development
2027
2028
650
 
 
200
450
 
9
Construction of Bridge on Punnaiyadi Ferry Road Acrosss 
Verugal River in Trincomalee District (Non -RDA)
Constructing a bridge on the Punnaiyadi Ferry Road across the Verugal River 
in the Trincomalee District to improve connectivity, accessibility, and regional 
economic development
2027
2028
850
 
 
340
520
 
10
Project proposal for Integrated Connectivity Development 
Project for Central Expressway Section 01 (Kadawatha to 
Meerigama) (12 road sections)
Reducing traffic congestion while enhancing regional connectivity, economic 
development, and freight transport efficiency
2027
2030
59,528
 
 
3,000
18,840
18,840
11
Integrated Connectivity Development Project for Central 
Expressway Section 03 (Pothuhera to Galagedara)10 Nos. 
Roads
Enhancing connectivity between major commercial cities and expressways, 
reducing traffic congestion, and improving economic and transport efficiency
2027
2030
18,317
 
 
5,000
4,440
4,440
12
Integrated Connectivity Development Project for Central 
Expressway Section 04 (Kurunegala-Dambulla) 9 road 
sections
Enhancing connectivity between major commercial cities and expressways, 
reducing traffic congestion, and improving economic and transport efficiency
2027
2030
31,260
 
 
500
10,250
10,250
36
Previous page Next page Top

MPIP 2027-2029 · file page 41 printed page 37

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
Ports & Shipping
1
Port Access Elevated Highway Project (PAEH)  
(proposed workshop building complex for SLPA) 
Relocating the workshop with a new workshop building complex while 
demolishing the existing workshop in order to continue the PAEH Project.
2021
2024
2,039
1,731
275
2
Rehabilitation of Kankasanthurai Habour (GOSL-India) consultancy work, Rehabilitation of Existing Breakwater, Rehabilitation of 
existing peir No. 01 ,Construction of new peir No. 02 as a continuation to the 
peir No. 01,Construction of New commercial Berth, Provide infrastructure 
facilities
2020
2027
18,327
198
45
500
935
2,000
3
Detail Design for the Extension of Western Breakwater 
for West Container Terminal II – Colombo Port 
Extension Project Phase II (GOSL- ADB)
To make SLPA fully ready for implementation of Colombo Port Expansion 
Project Phase II [CPEP Phase II)] including Extension of the Western breakwater  
 including partial demolition of the existing breakwater, Logistics facility 
development next to the western breakwater and Development of Western 
Container Terminal -II.
2024
2026
1,830
91
900
700
4
Revision and Update of the National Port Master Plan 
along with the Strategic Land Use Master Plan
To revise and update the National Port Master Plan, including the Strategic Land 
Use Master Plan, to ensure sustainable port development, optimize land use, and 
align with national economic, environmental, and strategic priorities.
2026
2027
300
125
175
5
Carrying out additional studies required for Colombo 
North Port Development Project
To conduct additional studies for the Colombo North Port Development Project 
to support informed decision-making, optimize project design, and ensure 
efficient and sustainable port development.
2026
2027
300
96
180
25
6
Preparation Grant for the Sri Lanka Ports and Logistic 
Development Programme
To support preparatory assessments, including comprehensive land use surveys, 
feasibility studies, technical designs, and land optimization planning for the Port 
of Colombo. Ultimately, this initial phase aims to establish the operational, 
environmental, and financial frameworks required to transform Colombo Port 
from a basic container transshipment hub into a world-class, integrated maritime 
logistics facility.
2026
2027
1,007
634
635
7
Procurement of Design, Development, Customization, 
Finance, Operation, Upgrading and Maintenance of Port 
Community System for Sri Lanka Ports Authority
To procure the design, development, customization, financing, operation, 
upgrading, and maintenance of a Port Community System for the Sri Lanka Ports 
Authority to enhance efficiency, streamline port operations, and improve 
stakeholder coordination.
2026
2027
3,000
500
Aviation
8
Hingurakgoda International Airport Development 
Project (1st phase)
To upgrade the airfield's physical infrastructure to support commercial aviation 
by extending the existing runway as a fully functional runway baseline
2024
2027
3,500
2,206
1,482
120
Ministry of Ports & Civil Aviation 
9
Replacing Obsolete Vessel Traffic Management System 
(VTMS) and Modernization of Marine Aids to 
Navigation System at the Port of Colombo
To enhance maritime safety, navigational reliability, and operational efficiency at 
the Port of Colombo by completely replacing its aging Vessel Traffic 
Management System (VTMS) and modernizing its marine aids to navigation 
infrastructure
2027
2028
3,579
575
3,005
Projection for 
2028
Projection for 
2029
New Projects
Sector: Ports and Civil Aviation
Cumulative 
Expenditure (as 
at 31.12.2025)
Project Period
  Total 
Estimated Cost 
(TEC)  
Name of the Project
Ongoing Projects
Ministry of Ports and Civil Aviation
No
Objectives and Scope of the Project
Revised Budget 
for 2026
Estimates for 
2027
37
Previous page Next page Top

MPIP 2027-2029 · file page 42 printed page 38

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
1
Lower Malwathu Oya Multisector Development Project
Irrigation of 1,052 acres of new lands (Paddy and other field crops) and 
12,420 acres cultivated in the vicinity of Yoda Wewa and Agathamurippu 
tanks, providing 27 MCM of water for domestic and drinking water 
facilities in Vavuniya, Anuradhapura and Mannar districts, transfer 4.68 
GWh of electricity annually to the National Grid.
2019
2030
47,180
2,209
4,610
7,500
9,000
10,000
2
Integrated Watershed and Water Resources Management Project 
(World Bank)
Improve watershed and water resources planning and enhance the 
functionality of water resources infrastructure.
2021
2027
20,308
8,603
3,600
5,550
3
Strengthening Climate Resilience of Subsistence Farmers and 
Agriculture Plantation Communities in Vulnerable River Basins, 
Watershed Area and Downstream of the Knukles Mountain Range 
Catchment of Sri Lanka (Green Climate Fund)
Strengthening climate resilience of subsistence farmers and Agriculture 
Plantation Communities in vulnerable river basins, watersheds area and 
downstream of the Knuckles Mountain Range Catchment of Sri Lanka.
2023
2029
15,672
931
3250
2,700
900
850
4
Elle Wewa Reservoir
Enhanced living standard of people living in the area by providing water for 
both agriculture and domestic purpose, ensure water security for irrigated 
agriculture during dry season.
2021
2026
2,950
801
690
500
5
Mundeni aru River Basin Development (Rugam-Kithul Reservoir)
Feasibility and initial Project Work- The project is for providing irrigation 
facilities for 6,500 ha new and existing lands among 10,000 farmer 
families, supply of drinking water for 31,000 families in Batticaloa and 
Ampara district, flood control in the downstream area, Increase the inland 
fisheries by 800 MT per year in both reservoirs.
2022
2028
24,141
383.5
50
10
6
Uma Oya Down Stream Development Project
Delivery of 150 MCM water received annually from the upper watershed of 
Uma Oya, throughout the cultivation area of 10,000 acres and newly 
identified cultivation area of 11,000 acres in Kirindi Oya basin through 
main tanks and rural tanks.
2013
2026
22,107
18,632
2,175
750
7
Mahweli Water Security Investment Programme (GOSL/ADB)
Completion of the remaining packages connected with the North Central 
Province Canal project, up to Yakalla and Mahakanadarawa including a 
component with commercial agriculture Development.
2026
2032
149,000
22,300
19,500
38,000
31,000
8
Maduru Oya Right Bank Development Project
Development of 12,462 ha of lands under the Maduru Oya Right Bank in 
Ampara and Batticaloa Districts, with the construction of 83 km long main 
and branch canal system.
2026
2032
42,979
300
1,500
4,000
10,000
9
Kivul Oya Reservoir Project
Construction of a reservoir - Kivul Oya (a tributary of Ma Oya) in Vavunia 
District to provide irrigation for 1,700 ha of new lands and enhance 700 ha 
of existing lands, while supplying drinking water for uplifting the 
livelihoods.
2026
2031
23,546
200
2,000
7,400
4,600
10 Essential Rehabilitation in Selected Major Irrigation Scheme
Stabilize and increase agricultural production in selected major/medium 
irrigation schemes by rehabilitating the essential components of the 
downstream canal system.
6,500
6,000
7,000
8,000
11 Gravity Irrigation Works
Operation and maintenance works of all irrigation schemes under the 
purview of Department of Irrigation.
2,200
2,665
2,800
3,000
12 Rehabilitation of Major and Medium Irrigation Schemes Including 
Emergency Infrastructure
Increase agricultural productivity and water efficiency by rehabilitation of 
major and medium irrigation schemes.
1,500
500
500
500
Sector: Irrigation
Cumulative 
Expenditure (as 
at 31.12.2025)
Project Period
  Total Estimated 
Cost (TEC)  
Name of the Project
Revised Budget 
for 2026
Estimates for 2027
Projection for 
2028
Projection for 
2029
No
Objectives and Scope of the Project
Annual 
Annual
Annual 
Ongoing Projects
Ministry of Ministry of Agriculture, Livestock, Lands and Irrigation
38
Previous page Next page Top

MPIP 2027-2029 · file page 43 printed page 39

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
Cumulative 
Expenditure (as 
at 31.12.2025)
Project Period
  Total Estimated 
Cost (TEC)  
Name of the Project
Revised Budget 
for 2026
Estimates for 2027
Projection for 
2028
Projection for 
2029
No
Objectives and Scope of the Project
13 River Basin Development and Management
Establish the river profile to secure livelihoods, maintain river bank by 
preventing erosion and maintain water quality by minimizing 
contamination to rivers.
700
760
1,000
1,000
14 Agriculture and Livestock Programme Implemented by Sri Lanka 
Mahaweli Authority
Uplift living standards of farmer community through enhancing agricultural 
productivity
1,400
1,400
1,500
1,600
15 Mahaweli Authority of Sri Lanka
Operation and maintenance works of all irrigation schemes under the 
purview of Mahaweli Authority of Sri Lanka.
4,406
3,800
4,000
4,500
1
Completion of Spillover Activities of the Climate Resilience Multi-
Phase Programmatic Approach -CREsMPA
The project aims to strengthen Sri Lanka’s climate resilience through 
modernization of hydro-meteorological forecasting, flood forecasting, 
landslide forecasting, multi-hazard early warning systems, decision support 
systems, LiDAR surveys, flood forecasting models and emergency 
operation centers 
2,027
2027
3,054
3,054
2
Transforming Irrigation system for improved food security (ADB 
Grant)
Project seeks to establish four modern Pipe Distribution Networks for 
irrigation in slected 4 locations in Meegas Ara, Ridi Bendi Ela, Magalla and 
the Inginimitioya on a pilot basis
2,027
2031
1,496
600
266
266
3
Wari Mahima Ape Urumaya Programme
Nationwide initiative to rehabilitate, restore and climate-proof village 
irrigation schemes, village tank cascade systems, anicuts and associated 
agricultural infrastructure across 25 districts.
2,027
2029
9,250
2,500
3,000
3,700
4
Assessment of Mahaweli River Morphology Changes, Flood Risk and 
Mitigation Measures
Identifying the changes occurred in the Mahaweli River, main reasons for 
the changes and identifying the affected areas by flooding and river bank 
erosion to provide practical and sustainable solutions to reduce flooding and 
to control river bank erosion
2027
2030
350
100
108
142
5
Gampaha City Flood Protection Project
The project consists of the construction of a Northern Flood Bund across 
Minuwangoda Road with associated pump houses, a North-East Flood Wall 
across Wijayarama Road with associated pump houses, increasing the 
conveyance capacity of Kundivila Canal, and improving the conveyance 
capacity of culverts along the Gampaha–Minuwangoda Road. 
2027
2031
5,393
50
2,000
3,000
6
Modernization of the Rajanganaya Lift Irrigation Scheme and 
Development of New Lift Irrigation Schemes
It is expected to rehabilitate the aging lift irrigation infrastructure 
established in 1973 and address the existing deficiencies that have 
constrained agricultural production and the effective utilization of 
agricultural lands. 
2027
2029
2,927
300
1,000
1,500
7
Mahakithula Inlet Tunnel Project
Project involves the construction of the Mahakithula Inlet tunnel, which 
compriss  a 580m long New Austrian Tunnelling method, a 465 m long 
twin rectangular cut and cover canal and a 120 m long open canal with a 
total length of approxiamately 1,165m. 
2027
2029
3,525
600
1,000
1,800
8
Remaining works related to the project for construction of feeder 
canal from Siyabalangamuwa Oya to Mahagalagamuwa Tank
Completion of the remaining packages connected with the North Central 
Province Canal project, up to Yakalla and Mahakanadarawa including a 
component with commercial agriculture Development.
2027
2028
469
156
300
9
Plot Consolidation of Paddy Lands by Farmers with Government Co-
financing (50-50)
Through a 50% government contribution for plot consolidation and land 
leveling, the project will enable farmers to adopt modern cultivation 
practices, increase land productivity and crop yields by approximately 20%, 
reduce cultivation costs, improve water-use efficiency, and strengthen 
national food security
2027
2029
500
100
200
200
Annual 
Annual 
Annual
New Projects
39
Previous page Next page Top

MPIP 2027-2029 · file page 44 printed page 40

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion Year
1
Accounting for the foreign loan disbursement & Grant of CEB - 
 National Transmission Distribution Network Development & 
Efficiency Improvement Project (NTDND & EIP)  All  
Packages 
This Project is to develop and enhance National Transmission and Distribution 
Network by improving and upgrading transmission lines, substations, and 
distribution lines for improving reliable and sustainable power supply and energy 
efficiency, thereby contributing to economic development in the country.
2019
2030
41,590
40,487
5,712
4,900
6,900
4,000
2
Kerawalapitiya - Port 2nd transmission line project
Supply, delivery, installation, testing and commissioning of
 15.6km of 220kV underground cable from Kerawalapitiya SS to Colombo
2026
2028
14,985
5,400
4,200
3,000
6,000
3
New Habarana kappalthurai transmission Development Project - 
 CEATP 1 (AIIB)
Facilitate power evacuation from renewable energy zones identified in the 
Eastern part of the country and enhance transmission capacity and reliability in 
the Eastern Province - Construction of 77km long. 220kV double circuit 
transmission line from New Habarana Switching Station to Kappalthurai Grid 
substation, augmentation of New Habarana 220/132 kV Switching Station and 
Modification of Kappalthurai 220/33 kV Grid Sub Station.
2026
2029
16,378
256
1,984
3,300
3,500
6,500
4
Sampur Kappalthurai Transmission Development Project 
(SKTDP)
Enhance power evacuation capacity to enable integration of solar power from 
northeastern Sri Lanka into the national grid and enhance transmission capacity 
and reliability in the Eastern Province - Construction of Sampur-Kappalthurai 38 
km long 220kV double circuit transmission line, construction of Sampur Solar 
Collector GSS III and augmentation of Kappalthurai 220/33 kV Grid Sub Station
2026
2028
11,077
25
1,500
3,100
3,500
5,000
5
Installation of 75 MVA Synchronous Condenser Unit at New 
Habarana
Maintain system stability from voltage collapse and frequency support during 
contingency conditions by installing a 75 MVA Synchronous Condenser Unit at 
the
 existing New Habarana Grid substation
2026
2029
** 8,252 
(USD 25 
Mn.)
53
1,000
4,400
4,000
6
Rooftop Solar Aggregation and Virtual Net Metering Project
Empower vulnerable small enterprises through renewable energy–based virtual 
net metering by installing solar power systems on available rooftop areas of
 government buildings
2026
2029
** 5,611 
(USD 17 
Mn.)
1,000
1,000
3,200
3,400
7
Installation of STATCOM at Padukka 220kV GSS
Maintain system stability from voltage collapse during contingency conditions by 
installaing a STATCOM at Padukka 220kV Grid Substation
2027
2029
** 4,291 
(USD 13 
Mn.)
2
390
1,500
2,000
8
Development of Northern 400kV Transmission Network
To conduct the preliminery works of the Development of the transmission 
network backbone to facilitate the integration of variable renewable energy 
sources to be commissioned in the Northern part of Sri Lanka into the national 
grid and increase the transmission capacity of the existing network
2026
2027
500
2
500
1,500
3,800
Sector:  Power & Energy
Cumulative 
Expenditure (as at 
31.12.2025)
Project Period
  Total Estimated 
Cost (TEC)  
Name of the Project
Ongoing Projects
Ministry of Energy
No
Objectives and Scope of the Project
Revised Budget for 
2026
Estimates for 2027
Projection for 2028
Projection for 2029
40
Previous page Next page Top

MPIP 2027-2029 · file page 45 printed page 41

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion Year
Cumulative 
Expenditure (as at 
31.12.2025)
Project Period
  Total Estimated 
Cost (TEC)  
Name of the Project
No
Objectives and Scope of the Project
Revised Budget for 
2026
Estimates for 2027
Projection for 2028
Projection for 2029
9
Obtaining Grant Support for Renewable Energy Admission and 
Energy Efficiency Enhancement Project
Introduce High Temperature Low Sag (HTLS) conductors to the electricity 
distribution networks and to introduce Battery Energy Storage Systems (BESS) 
at Lanka Electricity Company (Pvt) Ltd (LECO) distribution transformers to 
enable virtual power plant functionality and enhance solar PV
 integration
2026
2029
** 1,650 
(USD 5 
Mn.)
600
50
1,000
1,500
10 Partnership for Energy Efficiency Buildings (PEEB) Project
Support development, capacity building, knowledge management and 
strengthening of public policies for energy effciency in Sri Lankan building sector
2026
2028
316
100
200
220
1
Project Preparatory Activities for selected Transmission 
Development Projects through Grant Facility for Project 
Preparation from the World Bank
Grant Facility for Project Preparation on Hambantota-Monaragala 220 kV 
transmission line, Norochcholai-Wariyapola 220kV transmission line with 
Wariyapola GSS, New Habarana-Kirindiwela 400kV transmission line, 
Kalmunai 132kV/33kV GSS
2027
2028
504
300
650
400
2
Establishment of Four Distribution conrol cenrtres (DCCS) 
with Advanced Distribution Management System (ADMS) 
supported by SCADA and Advanced Metering Insfrastructure 
(AMI) for the Four Distribution Divisions
Upgrade, modernize and digitalize Sri Lanka’s power distribution system to 
enable higher renewable energy integration, supporting the national target of 
70% renewables by 2030 and beyond.                                                                       
                                                                                                         Introduce 
advanced technology for distribution system efficiency and reliability 
improvement in Sri Lanka.                    
2027
2029
8,811
5,130
6,100
3,000
** USD Rate as at 28.10.2026 - 333.07 Sri Lankan Rupee
New Projects
41
Previous page Next page Top

MPIP 2027-2029 · file page 46 printed page 42

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
1
Water Supply and Sanitation Improvement Project 
(WASSIP) (GOSL-WB)*
Increase access to potable pipe-borne water and sanitation facilities in  11 Districts by 
constructing  water supply schemes,  rehabilitation of  small scale WSSs, Sewerage 
Treatment Plants and provision of  sanitation units in urban, rural and plantation areas.
2015
2026
48,200
50,814
1,660
 
 
 
2
Jaffna Kilinochchi Water Supply and Sanitation 
Project (GOSL/ADB)*
Provide safe drinking water facilities to people  in Jaffna District and some parts in 
Kilinochchi District  through a desalination plant to improve health and living standards of 
the people in the area.
2011
2027
35,881
39,979
5,090
4,053
 
 
3
Ambathale Water Supply System Improvement & 
Energy Saving Project (GOSL/France)*, **
Enhance the efficiency and reliability of the water supply to Colombo and its suburbs by 
upgrading and replacing the deteriorated pipe network and equipment in Ambatale water 
supply system (Project is domestically funded on re-imbursement basis).                                  
2016
2026
13,000
14,157
3,590
200
 
 
4
Greater Ruwanwella Water Supply Project 
(GOSL/Korea)*
Provide safe drinking water to   people living in Bulathkohupitiya, Ruwanwella, 
Yatiyanthota DS Divisions by constructing a water treatment plant and  water supply 
connections. (After 2026 project finance on domestically).
2019
2029
6,291
5,766
1,230
875
635
220
5
Kandy North & Pathadumbara Integrated Water 
Supply Project (GOSL/China)**
Improve the water treatment plant to provide safe and adequate drinking water facilities to  
people living in Kandy Municipal Council, Kandy Four Gravates, Pathadumbara, 
Harispattuwa,  Pujapitiya and Akurana Divisional Secretariats in Kandy District. 
2019
2027
51,324
34,051
7,500
3,000
1,500
 
6
Anuradhapura North Water Supply Project  Phase 
II (GOSL/JICA) 
Provide safe drinking water and increase water supply coverage by constructing a water 
supply system in Padaviya, Horowpothana, Kahatagasdigiliya  and Kebithigollewa DSDs in 
Anuradhapura District where the people depend on unsafe ground water which has high 
tendency to cause CKD. 
2018
2031
31,598
510
5,390
6,662
7,502
7,635
7
Kalu Ganga Water Supply Expansion Project (1) 
(GOSL/JICA)
Expand Kalu ganga water supply facilities by re-structuring water distribution network to 
increase water supply to cover 14 DS divisions in Colombo and Kalutara Districts. 
2020
2029
55,338
1,005
460
5,595
8,900
7,600
8
Eppawala, Giribawa, Rajanganaya & 
Nochchiyagama Integrated Water Supply Project - 
Stage I
Provide safe pipe-borne water to around 154,058 beneficiaries in Eppawala, Giribawa, 
Rajanaganaya & Nochchiyagama areas covering together with commercial demand for 
industries in Thalawa, Ipalogama, Galnewa, Rajanganaya, Nochchiyagama, Giribawa, 
Galgamuwa DSDs (110 GNDs) in Anuradhapura & Kurunegala Districts.
2025
2029
32,211
 
1,000
4,500
5,110
2,211
9
Deduru Oya Water Supply Project - Phase II**
Provide safe drinking water to people living in 112 GNDs in Polpithigama & Mahawa DS 
Divisions in Kurunegala District who are vulnerable to CKDu. 
2026
2027
5,614
 
10
60
2,797
2,747
10 Climate Resilient Sustainable Water Supply and 
Sanitation Improvement Project (GOSL/ADB)
Provide more reliable and improved water supply and sanitation services in urban areas 
with high priority in service improvement.
2026
2030
56,999
 
500
5,000
6,770
12,856
11 Anamaduwa Integrated Water Supply Project
Provide safe drinking water to Anamaduwa, Nawagaththegama, Part of 
Mahakumbukkadawala, Puttlam & Mundal, Kotawehera and Part of Galgamuwa DS 
Division with a 11,000 m3/day WTP, 12,500 m3/day Intake and 04 water towers.
2012
2028
8,625
6,031
780
800
841
 
12 Kandy City Waste Water Management Project 
(GOSL/JICA)*, **
Improve sanitary conditions of the people in high density areas in Kandy city by providing a 
centralized waste water management system including treatment plant, sewer network and 
sludge treatment facilities.
2010
2027
22,588
21,628
2,110
1,200
857
 
Sector: Water Supply and Sanitation
Cumulative 
Expenditure (as at 
31.12.2025)
Project Period
  Total Estimated 
Cost (TEC)  
Name of the Project
Estimates for 2027
Projection for 
2028
Projection for 
2029
Revised Budget 
for 2026
Ongoing Projects
Ministry of Housing, Construction and Water Supply
No
Objectives and Scope of the Project
42
Previous page Next page Top

MPIP 2027-2029 · file page 47 printed page 43

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
Cumulative 
Expenditure (as at 
31.12.2025)
Project Period
  Total Estimated 
Cost (TEC)  
Name of the Project
Estimates for 2027
Projection for 
2028
Projection for 
2029
Revised Budget 
for 2026
No
Objectives and Scope of the Project
13 Phase II Stage I of Ratmalana/Moratuwa Waste 
Water Disposal Project (Expansion of Pipe Sewer 
Coverage to Moratuwa & Ekala Areas) 
(GOSL/AFD)*, **
Extend the pipe sewer coverage in Moratuwa & Ratmalana Areas. Project is domestically 
funded on re-imbursement basis.
2016
2026
16,073
3,182
2,135
1,000
350
 
14 Waste Water Management System for Ella 
Township
Develop a centralized waste water management system to address sanitation needs in Ella 
township in Badulla District covering 03 GNDs in Ella DSD.
2026
2029
4,819
 
300
741
1,860
1,000
15 Gampaha, Attanagalla & Minuwangoda Integrated 
Water Supply Scheme (GOSL/CHINA)*, **
Provide pipe-borne water connection to uncovered areas and improve service level of 
existing customers in Gampaha, Attanagalla, Minuwangoda DS Divisions and part of 
Meerigama, Mahara DS Divisions.
2017
2026
33,060
41,148
45
30
 
 
16 Capacity Enhancement and Distribution Expansion 
Project (CEDE) (Completion of ongoing projects 
with more than 25% physical progress, in 
accordance with the Cabinet directive)*
Enhance the capacities of existing water supply schemes and expansion of the distribution 
network island wide.
2020
2029
43,700
30,887
8,500
10,000
10,318
11,048
17 Water Reclamation-connection enhancement 
project stage I (A7-CEP) Dehiwala Mt.Lavania 
Sewerage Scheme
Improve sewer connectivity in the Dehiwala/Mt. Lavinia area by providing 1,500 new sewer 
connections, extending sewer networks, and upgrading pumping facilities and transmission 
infrastructure.
2024
2029
2,477
 
 
80
500
800
18 Upgrading Pelmadulla Water Treatment Plant 
Capacity 5000m3 day and 21.5 km Transmition & 
Distribution Pipelines(DH/HDPE)
Upgrade the Pelmadulla Water Treatment Plant to 5,000 m³/day capacity and improve 21.5 
km of transmission and distribution pipelines to provide safe and reliable drinking water to 
underserved areas.
2024
2029
2,904
 
 
150
300
700
19 Bandarawela Water Supply Project Phase I & II 
Improve access to safe and reliable drinking water in Bandarawela, Haputhale, Welimada, 
Ella, and Hali-Ela through a 10,000 m³/day water treatment plant, transmission and 
distribution pipelines, and 9,000 new water connections.
2022
2029
9,350
1,614
 
175
250
500
20 Distribution Expansion of Mathugama/Agalawatta 
Area in Kalutara District
Expand and improve water distribution networks in Mathugama, Agalawatta, and 
surrounding areas to enhance service reliability and provide safe drinking water to 
underserved communities.
2023
2029
1,783
285
 
75
500
750
21 Augmentation of Oddusudan & Nedunkerny WSS 
(Stage 1&2)
Augment the Oddusuddan and Nedunkerny Water Supply Scheme by developing a 2,000 
m³/day water treatment plant and distribution infrastructure to provide safe drinking water 
to around 16,000 beneficiaries through 4,000 connections.
2023
2029
1,948
59
 
65
200
500
22 Proposed Pipeline Extension in Walapane WSS 
(Keerthibandarapura) and Dambulla WSS**
Extend the Walapane water supply network to Keerthibandarapura and improve 
transmission capacity under the Dambulla Water Supply Scheme to enhance reliable 
drinking water supply in the beneficiary areas.
2021
2027
788
550
 
100
138
 
23 Pipeline Extension to Serankada in Padiyathalawa
Extend the water supply network to Serankada, Aranthalawa, and surrounding areas through 
13 km of pipelines and associated storage and pumping facilities to provide safe drinking 
water to approximately 2,500 families.
2021
2029
820
10
 
20
500
200
24 Implementation of Thriukovil Water Supply 
Scheme
Improve the Thirukovil and Pottuvil Water Supply Schemes through intake upgrades, a 
primary treatment plant, and enhanced storage facilities to provide reliable drinking water to 
new and existing consumers.
2022
2029
563
22
 
12
300
200
25 Improvement to Minneriya WTP & WSS
Upgrade the Minneriya Water Treatment Plant to increase capacity from 9,000 to 13,500 
m³/day and improve transmission infrastructure to enhance water supply reliability and 
provide 5,625 new connections.
2021
2029
911
48
 
30
200
633
26 Improvement and Distribution Expansion Project 
of Kataragama WSS (Short Term) 
Augment the Kataragama Water Supply Scheme by upgrading treatment and intake 
facilities and expanding the distribution network to improve water supply reliability and 
provide approximately 9,800 new connections.
2023
2031
5,466
 
 
140
200
400
43
Previous page Next page Top

MPIP 2027-2029 · file page 48 printed page 44

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
Cumulative 
Expenditure (as at 
31.12.2025)
Project Period
  Total Estimated 
Cost (TEC)  
Name of the Project
Estimates for 2027
Projection for 
2028
Projection for 
2029
Revised Budget 
for 2026
No
Objectives and Scope of the Project
27 Improvement of Awissawella Water Treatment 
Plant 
Upgrade the Awissawella Water Treatment Plant from 3,000 to 6,000 m³/day and construct 
a new intake facility to ensure safe, reliable, and uninterrupted drinking water supply.
2024
2029
1,295
 
 
45
700
550
28 Capacity Improvement and Distribution Expansion  
 Project of Baddegama Water Supply Scheme
Improve the Baddegama Water Supply Scheme through a 10,000 m³/day package treatment 
plant, reservoir construction, pipeline upgrades, and distribution expansion to provide 4,500 
new connections and improve services for existing consumers.
2021
2031
3,230
647
 
65
400
600
29 Improvement of Omanthai WSS**
Improve the Omanthai Water Supply Scheme through transmission and distribution network 
upgrades, a 450 m³ elevated water tower, and pumping facilities to enhance access to safe 
and reliable drinking water.
2023
2027
876
23
 
35
800
 
30 Distribution Expansion in 
Polgahawela,Pothuhera,Alawwa Integrated Water 
Supply Project
Expand approximately 417 km of distribution pipelines in the 
Polgahawela–Pothuhera–Alawwa areas to increase water supply coverage and fully utilize 
the existing 22,000 m³/day water treatment plant capacity.
2021
2028
2,248
174
 
95
1,500
 
31 Naththandiya, Wennappuwa, Kakkapalliya, 
Mawathagama WSS, Lakeside Pump house in 
Kurunegala WSS
Improve multiple water supply schemes in Kurunegala and Puttalam districts through 
treatment plant construction and upgrades, pipeline expansion, and improved pumping and 
sludge management facilities to ensure safe and reliable drinking water supply.
2021
2031
4,471
536
 
95
1,300
1,000
32 Wellawaya Water Supply Project Stage II Phase II
Augment the Wellawaya Water Supply Scheme through a 5,000 m³/day water treatment 
plant, storage facilities, and pipeline improvements to provide 1,470 new connections and 
improve services for existing consumers.
2022
2029
2,325
123
 
70
300
500
33 Improvement of Dehiattakandiya & Lihiniyagama 
WSS
Improve the Dehiattakandiya and Lihiniyagama Water Supply Schemes through intake 
upgrades, improved pumping facilities, and infrastructure enhancements to ensure reliable 
drinking water supply and provide approximately 2,300 new connections.
2021
2029
900
6
 
20
400
474
34 Distribution Improvements  in Demodara WSS 
(Extension to Damanwara,Sirimalgama Area of 
Badulla WSS and Ella Ballaketuwa,Dowa Zone 
After Improving the Demodara Distribution 
System)
Improve the Demodara Water Supply Scheme through treatment capacity augmentation, 
replacement of 68 km of aging pipelines, and enhanced storage and distribution facilities to 
ensure safe and reliable drinking water supply.
2021
2030
4,500
890
 
175
500
1,300
35 Augmentation of Delft Water Supply Scheme
Augment the Delft Water Supply Scheme by installing a 300 m³/day seawater reverse 
osmosis plant and developing intake, storage, and transmission facilities to provide safe and 
reliable drinking water to approximately 3,800 beneficiaries.
2023
2028
868
 
 
30
700
 
36 Upgrading Muthur Water Treatment Plant (WTP) 
Capacity From 8,500 cum/day to 17,000 cum/day 
Including Intake Improvement at Neelapola
Upgrade the Muthur Water Treatment Plant capacity from 8,500 to 17,000 m³/day and 
improve the Neelapola intake facilities to enhance water supply reliability and provide 
approximately 20,400 new connections.
2024
2029
2,868
 
 
50
500
800
37 Zoning Arrangement at Water Supply Schemes in 
Ampara & Akkaraipattu Region
Improve water supply efficiency in the Ampara and Akkaraipattu regions through hydraulic 
zoning, upgraded pumping and monitoring systems, and rehabilitation of transmission 
mains to reduce water losses and enhance service reliability.
2021
2029
1,539
261
 
25
700
500
38 Increase Service Coverage in Unnichchai and 
Surrounding Areas
Expand safe drinking water coverage in Unnichchai and surrounding areas through a 1,000 
m³/day package water treatment plant, pumping facilities, and distribution network 
expansion.
2022
2028
1,214
39
 
18
600
500
39 Improvement of Bangalawadiya WTP at 
Sammanthurai
Rehabilitate and modernize the Bangalawadiya Water Treatment Plant through equipment 
replacement, automation, and pumping system upgrades to ensure reliable drinking water 
supply to approximately 32,000 consumers.
2022
2029
342
88
 
5
160
89
44
Previous page Next page Top

MPIP 2027-2029 · file page 49 printed page 45

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
Cumulative 
Expenditure (as at 
31.12.2025)
Project Period
  Total Estimated 
Cost (TEC)  
Name of the Project
Estimates for 2027
Projection for 
2028
Projection for 
2029
Revised Budget 
for 2026
No
Objectives and Scope of the Project
40 Augmentation of Thissawewa WTP 
Augment the Thissawewa Water Treatment Plant by 4,500 m³/day and improve treatment, 
storage, and distribution infrastructure to enhance water supply reliability and provide 
approximately 3,820 new connections in the Anuradhapura Sacred City area.
2021
2029
3,180
387
 
70
500
1,300
41 Ground Water Source Development in Mannar & 
Kilinochchi**
Develop sustainable groundwater sources in Mannar and Kilinochchi through production 
wells, pumping and chlorination facilities, and transmission pipelines to improve safe 
drinking water supply reliability.
2021
2028
1,435
197
 
45
500
693
42 Capacity Improvement and Distribution Expansion 
Project of Lunugamwehera Water Supply Scheme
Upgrade the Lunugamwehera Water Supply Scheme by increasing treatment capacity from 
12,000 to 18,000 m³/day and expanding transmission and distribution networks to improve 
service reliability and provide approximately 3,900 new connections.
2020
2029
1,754
171
 
75
500
1,000
43 Greater Galle Integrated Water Supply Project - 
Urgent  Improvement 
Augment the Hapugala Water Treatment Plant capacity from 7,500 to 10,000 m³/day 
through additional treatment facilities and network improvements to enhance water quality 
and supply reliability in the Greater Galle area.
2021
2028
697
400
 
165
132
 
44 "Praja Jala Abhiman" Water Supply Scheme 
(Completion of ongoing projects)*, **
Develop existing community water Supply Schemes in island wide to increase pipe-borne 
water coverage in community water supply.
2021
2027
12,025
2,730
2,000
2,000
2,800
5,200
45 Ditwah Recovery Projects 
Restore and strengthen cyclone-damaged water supply infrastructure to ensure safe, reliable, 
and climate-resilient drinking water services in affected areas of Sri Lanka.
2026
2028
16,199
 
3,895
 
 
 
1
Greater Colombo Waste Water Management 
Project - (GOSL/ADB)*, **
Rehabilitation of existing 08 pumping stations in Maligawatta, Thimbirigasyaya, Borella, 
Modara, Fort, Wanathamulla, Bambalapitiya and SlaveIsland.
2010
2026
     7,000 
8,717
1,000
832
50
 
2
Greater Colombo Water and Waste Water 
Management Improvement Programme - Tranche 3 
(GOSL/EIB)*, **
Rehabilitate and expand the wastewater system in the south catchment area of Colombo 
city, construction of a secondary wastewater treatment plant in south catchment area of the 
colombo city and strengthening the institutional structure and capacity of service provider.
2024
2027
   15,000 
2,580
5,700
6,000
50
 
3
Greater Colombo Water and Waste Water  
Improvement Investment Programme -Tranche 3 
(GOSL/ ADB)*, **
Upgrade sewerage infrastructure, strengthen the institutional and operational capacity.
2018
2027
     7,000 
5,449
2,425
2,750
50
 
1
Upgrading the Water Supply Facilities in Kotte
Upgrade and zone the water distribution network and introduce DMAs to improve pressure, 
service reliability and NRW management.
2027
2030
     2,428 
 
 
200
500
1,000
2
Construction of an Updtream Impounding 
reservoirs across Maha Oya Yatimahana, Kegalle 
District for Securing Drinking Water Supply
Construct an upstream impounding reservoir to secure year-round water availability for 
downstream drinking water supply schemes.
2027
2031
   22,158 
 
 
300
200
200
3
Valachchenai Water Supply Project Phase 1
Develop a water supply system covering residential, commercial and tourism areas in 
Valachchenai and Pasikuda.
2027
2029
     9,836 
 
 
300
500
800
4
Eheliyagoda Water Supply Project-Capacity 
14,000m3/day
Construct a 14,000 m³/day water treatment plant with storage and associated water supply 
infrastructure.
2027
2029
     4,475 
 
 
1,600
2,000
900
5
Greater Kilinochchi Water Supply Project
Develop water supply infrastructure including a new intake, treatment plant, towers, ground 
reservoirs transmission systems and distribution networks.
2027
2034
   41,140 
 
 
1,800
3,000
3,000
6
Greater Galle Water Supply Project Stage III - 
Phase I
Construct a 30,000 m³/day water treatment plant with associated intake, transmission, 
storage and distribution infrastructure.
2027
2030
37,502
  
 
 
3,000
2,476
8,835
Ministry of Public Administration, Provincial Councils and Local Government
New Projects
Ministry of Housing, Construction and Water Supply
45
Previous page Next page Top

MPIP 2027-2029 · file page 50 printed page 46

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
Cumulative 
Expenditure (as at 
31.12.2025)
Project Period
  Total Estimated 
Cost (TEC)  
Name of the Project
Estimates for 2027
Projection for 
2028
Projection for 
2029
Revised Budget 
for 2026
No
Objectives and Scope of the Project
7
Nainativu Water Supply Project
Develop a 200 m³/day seawater reverse osmosis water supply system with associated 
abstraction, transmission and pumping facilities.
2027
2028
397
 
 
50
347
 
8
Kundasale Haragama Water Supply Project
Develop a 50,000 m³/day water treatment plant, intake, service reservoirs, distribution 
system with transmission mains, pumping facilities and SCADA.
2027
2031
34,368
 
 
1,800
3,000
3,000
9
Haldumulla Beragala Water Supply Project
Construct a 3,000 m³/day water treatment plant with transmission, distribution and storage 
facilities.
2027
2029
3,262
 
 
700
1,000
1,050
10 Infilling of Kilinochchi, Mullaitivu,Vavuniya, 
Mannar, Jaffna Districts
Extend and infill existing water supply networks and provide new household connections in 
unserved and underserved areas.
2027
2028
9,843
 
 
1,015
5,000
 
11 Bingiriya, Udubaddawa & Makadura Pannala, 
Kuliyapitiya IWSP (Phase 1) (Feasibility Study)
Undertake a feasibility study for a water supply system including a 40,000 m³/day treatment 
plant, transmission, storage structures  and distribution networks.
2027
2027
284
 
 
250
 
 
12 Non-revenue water reduction and Management 
Project for the Galle Water Supply Scheme (TA 
Grant)
Rehabilitate the Galle water distribution network and reduce NRW through network 
improvements and PPP-based NRW management.
2027
2031
2,828
 
 
150
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
** The Project Duration to be revised
* The Total Estimated Cost (TEC) to be revised
Projects Nos. 17 to 43 in the list were suspended in accordance with the Cabinet decision dated 22.09.2025, and their implementation is scheduled to resume in 2027.
46
Previous page Next page Top

MPIP 2027-2029 · file page 51 printed page 47

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
1
"Thamangema Thanak - Lassana Jeewithayak" Housing Grant 
Programme for Poor and Low Income Homeless Families.     
Construct 70,110 houses over a period of 05 years covering the entire island
2026
2030
114,281
10,200
13,000
14,020
15,000
2
Renovation of Housing Schemes
Rehabilitate  building and common amenities of low income and public 
servants housing schemes constructed by National Housing Development 
Authority
500
280
3
Housing Project (600 houses) in Southern Province - 2017
Construct 600 Houses in Southern Province
2017
2026
300
237
343
119
4
Housing Project Phase II (600 houses) in Southern Province - 2019 Construct 600 Houses in Southern Province
2019
2026
380
156
431
190
5
Sanitary Facilities for the Persons with Differently Abled
Provide sanitory facilities for 500 differently abled people in Western province
2026
2026
500
500
6
Renovation of Buildings, Common Amenities and the Sewerage 
Systems of Old Housing Schemes Constructed by NHDA for Low 
Income Families
Redevelope buildings, commonamenities, and sewerage systems of 31 old 
housing schemes constructed by National Housing Development Authority
2026
2026
681
681
7
Construction of 300 Low - cost Housing Units in Mannar
Construct transit housing units 
2018
2026
425
237
285
100
8
New Multi - Sector Emergency Project - AIIB (Housing 
Reconstruction)  
Provide housing assistance for "Cyclone Ditwah" affected families.
2026
2028
35,650
9
Restructuring of Ongoing Support to Colombo Urban Regeneration 
Project - AIIB
Provide housing assistance for "Cyclone Ditwah" affected families.
2026
2028
3,596
10 Post - "Cyclone Ditwah" Reconstruction & Livelihoods Support - 
ADB (Owner - Driven Housing Reconstruction)
Provide housing assistance for "Cyclone Ditwah" affected families.
2026
2030
10,695
11 Construction of New Housing Units for Fully Damaged Houses 
(Indian Grant)
Provide housing assistance for "Cyclone Ditwah" affected families.
2026
2027
20,000
12 Repairing Partially Damaged Houses (Indian Grant)
Provide housing assistance for "Cyclone Ditwah" affected families.
2026
2027
7,500
13 Construction of Temporary Housing Units (Indian Grant)
Provide temporary houses for"Cyclone Ditwah" affected families
2026
2027
459
14 Providing New Housing to the Plantation Community who have 
Lost their Homes due to Natural Disasters 
Relocate the plantation community who have been affected by natural 
disasters and are currently living in temporary housing for an extended period 
to a safe location.  
2025
2027
4,200
507
1,200
15 Indian Funded 10,000 Housing Programme
Construct 10,000 housing units in three stages.
2023
2027
32,640
2,660
4,290
2,800
1
Housing Project for Conflict - Affected Areas in Northern and 
Eastern Provinces of Sri Lanka 
Construct 13,000 permanant houses for conflict - affected families in 
Northern and Eastern Provinces
2027
2030
27,300
6,000
7,062
8,064
2
Proposed Resettlement Housing Project at Aramaya Place
Construct apartment housing units at Aramaya Place, Dematagoda to 
relocating the existing underserved settlements into safe, modern, and 
adequate housing 
2027
2028
3,633
2,145
2,000
3
Renovation of Buildings, Common Amenities and the Sewerage 
Systems of Old Housing Schemes Constructed by NHDA for low 
Income Families - 2027
Renovate  buildings, common amenities and the sewerage systems of old 
housing schemes  constructed by NHDA  for low-income families 
2027
2027
2,051
2,000
Projection for 
2029
Total Estimated 
Cost (TEC) 
Cumulative 
Expenditure (as 
at 31.12.2025)
Revised Budget 
for 2026
Estimates for 
2027
Projection for 
2028
Sector: Housing
No
Name of the Project
Objectives and Scope of the Project
Project Period
New Projects
Ongoing Projects
Ministry of Housing, Construction and Water Supply
Annual 
Ministry of Plantation and Community Infrastructure
Ministry of Defense (Projects 8 - 13 are included under "Cyclone Ditwa" Assistance Programme)
47
Previous page Next page Top

MPIP 2027-2029 · file page 52 printed page 48

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
1
Development of Strategic Cities - Anuradhapura 
Promote balanced mode of co- development between the sacred and modern 
parts of Anuradapura city. Construction of Anuradhapura multimodal transport 
center is ongoing
2016
2027
20,467
3,188
1000
450
2
Construction of 2,000 Housing Units under the Chinese 
Aid Programme for the Low Income People
Construct 1996 housing units to the residents of the underserved settlements in 
Colombo and its suburbs and Veteran Artist.
2023
2026
28,847
6,539
6500
6,500
6,880
3,220
3
Metro Colombo Solid Waste Management Project
Establish a long-term sustainable solid waste management system
2017
2027
33,238
26,057
2500
2,200
500
500
4
Support to Colombo Urban Regeneration Project
Construct 4074 housing units for resettling dwellers in underserved settlements 
in Colombo and suburbs
2019
2027
54,091
28,545
Urban Regeneration Programme
Urban Regeneration Projects - Ongoing 
Torrington Avenue Housing Project (Recommencement)
2025
2028
1,619
499
Colambage Mawatha Housing Project (Recommencement)
2025
2028
7,288
1,860
Urban Regeneration Projects - New
Construction of 600 no.Housing Units at Meethotamulla 
Bus Depot Land 
Construct 600 housing units at Meethotamulla to provide safe, adequate, and 
climate-resilient housing for low-income families
2027
2031
8,400
Construction of 560 no Housing Units at Meethotamulla 
Land 
Construct 560 housing units at Meethotamulla to provide safe, adequate, and 
climate-resilient housing for low-income families
2027
2031
8,751
Construction of 472 Housing Units in Kimbula Ela Land
Construct 472 housing units at Kimbula Ela area to provide safe, adequate, and 
climate-resilient housing for low-income families
2027
2031
6,659
Other urban housing projects - New
Provide Urban Housing for Underserved Settlements for 
Main Cities of Sri Lanka (Construction of 300 no of 
Housing Units at Kurunegala Wilgoda Land) 
Construct 300 apartment housing units at the Wilgoda land in Kurunegala to 
relocate households currently living in underserved settlements within the 
Kurunegala Municipal Council area
2027
2031
4,170
Daraniyagala, Maliboda Estate Infrastructure Housing 
Project (Balance Works - Stage II) - 32 Housing Units 
Construct 32 houses (balance work) and relevant infrastructure for the estate 
workers in the Maliboda Estate
2027
2028
472
6
Reconstruction of Jaffna Town Hall
Reconstruct Town Hall in Jaffna
2019
2026
2,350
2,189
220
700
200
7
Implementing Solid Waste Disposal Mechanism in 
Anuradhapura Municipal Council Area
Establish sustainable solid waste management system in Anuradhapura 
Municipal Council Area
2025
2027
1,442
26
530
702
8
Tourism Promotion and City Branding
Promote selected ancient cities and tourism destinations (Kataragama, Kandy, 
Anuradhapura, & Colombo) through city branding
2025
2029
4,072
52
1800
2,700
100
9
Siyak Nagara /Urban Infrastructure and Township 
Development Programme (Recommencement)
Reducing imbalance between the main and regional cities
2025
2026
2,474
697
930
500
200
Improvement of Road Infrastructure in the 
Homagama Region (Tec City) 
Western Bypass Road Development - Acquisition 
(compensation) - Ongoing component
2024
2026
917
702
Pitipana Thalagala Road Development -Ongoing 
component
2026
2027
581
Ongoing Projects
Sector: Urban Development
No.
Name of the Project
Objectives and Scope of the Project
Project Period
Total Estimated 
Cost (TEC) 
Cumulative 
Expenditure (as 
at 31.12.2025)
Revised Budget 
for 2026
Estimates for 
2027
Projection for 
2028
Projection for 
2029
Ministry of Transport, Highways and Urban Development
20,320
5
Resettle dwellers in underserved settlements in Colombo and suburbs 
(Construction of 730 Housing units in Colambage Mawatha and Torrington 
Lane are ongoing)
10
Improving Road Infrastructure in the Homagama Tech City Region to enhance 
accessibility
998
21,000
23,000
500
200
14,700
48
Previous page Next page Top

MPIP 2027-2029 · file page 53 printed page 49

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
No.
Name of the Project
Objectives and Scope of the Project
Project Period
Total Estimated 
Cost (TEC) 
Cumulative 
Expenditure (as 
at 31.12.2025)
Revised Budget 
for 2026
Estimates for 
2027
Projection for 
2028
Projection for 
2029
Balance Connection - Connect to High Level Road -
Homagama - New Component
2027
2027
198
Development of Proposed Road Section of NSBM Green 
University to Sri Lanka Biotechnology Center- New 
Component 
2027
2027
220
11 Oliyamulla Storm Water Drainage & Environment 
Improvement Project
Improving storm water drainage and envirionment by reducing the flood risk
2018
2027
3,970
2,892
320
793
800
840
12 Kolonnawa Storm Water Drainage & Environment 
Improvement Project
Improving storm water drainage and envirionment by reducing the flood risk in 
Kolonnawa Area
2018
2031
15,044
1,526
1310
1,700
1,730
1,830
Conducting preparatory activities of the project - (Grant)
2026
2026
300
To catalyze regional economic growth and enhance the competitiveness of the 
North and Eastern Provinces by strengthening clusters with economic potential 
and improving support to SMEs and local businesses - (Loan)
2026
2030
32,000
14 Implementing of Waste Management in the Western 
Province- Kerawalapitiya Waste Management Park
Construct composting facilities at the Kerawalapitiya waste management park
2026
2028
2,591
215
160
1,000
460
15 Maintenance and rehabilitation of existing canals, lakes, 
wetlands and walkways
Ensure maintenance of drainage system and wetlands
972
1,140
1,200
1,300
16 Drainage Design & Implementation and Environment 
Protection Activities
Conduct studies, design works and relevant implementations for environment 
and drainage improvement 
735
640
640
660
1
Construction of  Quarters for Government Officials, 
Rathnapura                                                                             
Construct 200 quarters units  for government officials in Rathnapura District 
and utilize the land currently occupied by government quarters  for urban 
development activities
2027
2030
5,887
1,000
2,000
3500
2
Implementation of Beira Lake Intervention Area 
Development Plan (Beira Lake Rehabilitation and 
Redevelopment Project)
Enhance the environmental, social and economic value of the Beira lake
2027
2027
1,110
900
1,000
3
Implementation of Oliyamulla Pumping Station Stage - I)
Construct a pumping station at Oliyamulla to reduce flood risk in Peliyagoda, 
Kelaniya and Kiribathgoda areas
2027
2029
5,962
12
10
1,000
4
Urban Development Programme for Identified 26 Cities 
(To be changed as "Life Cities Development Programme")
Transform identified strategically important urban centers to  sustainable, 
resilient, and economically vibrant ucities
2027
2031
65,618
5,084
10,000
15,000
5
Mudun Ela Storm Water Drainage and Environmental 
Improvement Project
Improve canal network  and drainage infrastructure, increase stormwater 
pumping and retention capacity, and land development to reduce flood risk and 
improve storm water drainage and envirionmental conditions in the Mudun Ela 
sub-basin 
2027
2034
46,191
500
3,000
3,500
6
"Dehiwala Metro-Link" (Proposed Bus Terminal and 
Facility Center Dehiwala) 
Establish a bus terminal within Dehiwala-Mount Lavinia Municipal Council 
Area, providing organized facilities for bus operations, passenger services, and 
multimodal transport integration.
2027
2029
1,295
500
800
7
Proposed Storm Water Drainage and Public Facility 
Improvement Project at Beruwala, Dikwella 
Mitigate recurrent flood condition by improving storm water conveyance and 
retention capacity through the development of a comprehensive drainage 
network, enhancement of hydraulic conveyance, restoration of natural water 
retention areas, and development of public retention facilities in Beruwala, 
Dickwella
2027
2030
2,946
380
1,200
850
New Projects
Annual 
Annual
13 Regional Empowerment through Vibrant, Inclusive and 
Viable Economies (REVIVE) - (Previously known as 
"Integrated Regional Development in Northern and 
Eastern Provinces")
1,300
6,394
7,500
300
49
Previous page Next page Top

MPIP 2027-2029 · file page 54 printed page 50

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
No.
Name of the Project
Objectives and Scope of the Project
Project Period
Total Estimated 
Cost (TEC) 
Cumulative 
Expenditure (as 
at 31.12.2025)
Revised Budget 
for 2026
Estimates for 
2027
Projection for 
2028
Projection for 
2029
8
Implementation of Storm Water Drainage and 
Environment Improvement Project along Piliyandala 
Bypass Road 
Enhance the storm water conveyance and retention capacity throughout the 
development of a comprehensive drainage network in Piliyandala area 
2027
2029
1,821
270
700
850
9
Bindunu Ela Storm Water Drainage & Environmental 
Improvement Project 
Rehabilitate Bindunu Ela to mitigate flood, restore paddy cultivation
2027
2031
2,214
145
500
1,000
10 Bus Stand Development, Children Park and Primary 
School Development Project at Deiyandara 
Construct a bus stand, a primary school and a children park with recreational 
area at Deiyandara
2027
2029
2,387
750
1,000
1,637
11 Land Development and Drainage Improvement for the 
Proposed Rathgama Township Development Project
Develop a comprehensive, professionally engineered drainage management 
system for Rathgama town and develop land for future urban development.
2027
2029
3,380
150
1,000
1,130
12 Bus Stand Development at Madhu Sacred Area 
Construct a bus stand at Madhu sacred area for improving passenger 
convenience, traffic management and public transport operations
2027
2028
256
90
166
13 Improvements of the St. Sebestian North Canal
Widen and rehabilitate a 345 m section of the canal to enhance storm water 
conveyance and reduce flooding. 
2027
2027
670
14 Refurbishment work of Asphalt Layer in Bicycle Track at 
Bellanwila Park and Installation of Protective Fence 
(Crocodile Fence) around the  Kelimadala Lake and Lake 
02 at Bellanwila
Improve the safety, accessibility, environmental, and recreational value of the 
area
2027
2027
117
15 Construction of Open Concrete Drain at Japan Friendship 
Walkway and Kimbulawela Walkway
Construct open concrete drains to improve storm water conveyance 
2027
2027
89
16 Rectification of the Damaged Canal Maintenance Road 
and Rehabilitation Canal Bank with Gabion Wall at 
Kirulapone Canal
Construct a gabion wall at Kirulapone canal and refurbishment of the asphalt 
surface
2027
2027
49
17 Construction of Gabion Wall and Refurbishment Work of 
Asphalt Layer along the Maintenance Road of St. 
Sebastian East Canal
Construct a gabion wall and refurbishment of the asphalt surface
2027
2027
141
18 Installation of Proposed Gate Mounted Pumps at Kalu 
Palama for Flood Mitigation
Installate gate-mounted pumps at Kalu Palama to facilitate the discharge of 
storm water from the Kittampahuwa Canal into the Kelani River to mitigate 
flooding in the Kolonnawa area 
2027
2029
3,154
600
1,500
1,054
19 Survey, Studies and preparatory works
Conduct feasibility studies, surveys and preperatory works 
2027
2027
480
480
707
753
20 Enhancing the Socio-Economic Well-Being of the 
Dwellers in Urban Underserved Settlements through 
Social Empowerment and Development Initiatives
Enhance human capital development, economic growth and social well-being of 
the dwellers in urban underserved settlements 
2027
2031
1,125
82
80
75
21 Development of Mass Scale Waste Management (Waste 
to Energy) Project at Karadiyana (PPP)
Implement a Thermal Recovery Facility/ Waste-to-Energy plant with the 
Capacity of 10 MW and process approximately 500-700 MT of Waste per day at 
Karadiyana.
2027
2028
16,279
588
50
Previous page Next page Top

MPIP 2027-2029 · file page 55 printed page 51

Major Public Investment Project 2027-2029
Started/ Expected 
Starting Year
Expected 
Completion Year
1
Defence Headquarters Complex Project - Phase I
Create a centralized organizational structure that would enhance corporation and 
operational flexibility and other tasks amongst the tri forces effectively, whilst 
enhancing efficiency through the sharing of resources within the defence hierarchy
2011
2027
65,451
59,036
4,100
2,850
 
 
2
Strategic Defence Communication Network
Development of a Strategic Defence Communication Network to ensure secure, 
reliable, and integrated communications for effective coordination, information 
sharing, and operational command across defence establishments.
2015
2027
     2,159 
684
 
 
 
3
Rebuilding Sri Lanka - (Ditwah)
Reconstruction, renovationa and repair work of damages caused by Cyclone Ditwah
2026
2027
1,490
    
 
1,002
 
 
 
1
Modernization of Sri Lanka Army Telecommunication 
Network
Upgrade the Sri Lanka Army’s microwave backbone and PABX systems to ensure 
high-speed, uninterrupted communication and establish redundancy for enhanced 
reliability
2026
2030
        509 
 
40
244
250
 
2
Replacement of Out-dated  Radio Communication 
Systems
Strengthen the communication capabilities of the Sri Lanka Army by replacing the 
existing Cougar radio systems with Hytera digital radio equipment, with special 
emphasis on expansion and sustainability strategies
2026
2030
     1,812 
 
350
733
345
 
3
Army Hospital Project
Providing medical services to armed forces personnel, their families, retired members, 
and civilian staff serving in the forces by constructing a 15-story building to 
accommodate medical facilities
2017
2027
     4,004 
1,823
200
200
 
 
4
Army Hospital Information System
Upgrade and Integration of Army Hospital Information System with Smart Picture 
Archive Communication System and Laboratory Information Management System
2024
2027
        284 
85
174
 
 
 
1
Upgrading VHF Clear communication system
Acquiring VHF Clear Handsets, Base Stations and VHF Clear Repeaters to achieve 
uninterrupted communication for administration and operational requirement
2021
2028
550
160
50
50
50
50
2
Construction of Quay and Infrastructure Facilities at 
Naval Dockyard Trincomalee
Enhancing the berthing facilities at Trincomalee Harbor to address current 
inadequacies and accommodate larger naval vessels, supporting the operational 
requirements of the Sri Lanka Naval Dockyard
2021
2028
7,582
4,904
1,000
1,680
 
 
3
Expansion of MTTU Unit by Acquisition of new 
equipment
To facilitate the transition from Planned Preventive Maintenance to Condition-Based 
Maintenance by utilizing accurate and reliable statistics, thereby ensuring a more cost-
effective approach
2026
2030
250
103
50
50
50
50
4
Upgrading SLN PABX & Switch Network
Upgrading the Sri Lanka Navy’s (SLN) PABX and switch network to improve 
communication efficiency, network reliability, and connectivity across naval 
establishments.
2021
2030
275
57
50
 
 
 
5
Enhancement of Infrastructure Facilities at SLN 
Dockyard incorporated with floating dock
Enhancement of infrastructure facilities at the Sri Lanka Navy (SLN) Dockyard, 
including the floating dock, to strengthen ship repair, maintenance, and operational 
support capabilities.
2024
2028
528
34
 
 
 
6
Obtaining a 4,000 Ton Floating Dock Under Indian 
Donation
The proposed project aims to improve the ancillary facilities to ensure the maximum 
functioning of the dock after the establishment of the floating dock received from 
India as a grant
2025
2028
528
75
562
100
118
 
Sector: Governance - Defence
Cumulative 
Expenditure (as at 
31.12.2025)
Project Period
  Total Estimated 
Cost (TEC)  
Name of the Project
No
Objectives and Scope of the Project
Revised Budget for 
2026
Estimates for 2027
Projection for 2028
Projection for 2029
Sri Lanka Army
Sri Lanka Navy
Ongoing Projects
Ministry of Defence
51
Previous page Next page Top

MPIP 2027-2029 · file page 56 printed page 52

Cited in: ICT spend by agency, Ministry and programme movers

Major Public Investment Project 2027-2029
Started/ Expected 
Starting Year
Expected 
Completion Year
Cumulative 
Expenditure (as at 
31.12.2025)
Project Period
  Total Estimated 
Cost (TEC)  
Name of the Project
No
Objectives and Scope of the Project
Revised Budget for 
2026
Estimates for 2027
Projection for 2028
Projection for 2029
7
Development of Naval acadamy
Development of the Naval Academy to enhance training infrastructure and facilities 
for naval personnel, strengthening professional education, skills development, and 
operational readiness.
2013
2029
1,472
1,335
200
260
364
 
1
Capital overhaul of SMH-4416 Helicopter 
2026
2027
1,530
 
1,530
 
 
 
2
Capital overhaul of SMH-588 Helicopter 
2026
2027
1,168
 
1,168
 
 
 
3
Capital overhaul of SMH-599 Helicopter 
2026
2027
1,485
 
1,485
 
 
 
4
Capital overhaul of SMH-596 Helicopter 
2026
2027
1,524
 
1,523
 
 
 
5
Recovery of Mi-17 Helicopters
Repair and overhaul the engines, main gearboxes, and auxiliary power units necessary 
to facilitate the comprehensive overhaul of the Mi-17 helicopter
2026
2027
1,047
 
144
 
 
 
6
Sustainablity of Mi-17 Helicopters
Obtain overhauled and repaired components from an overseas facility to ensure the 
continuation of operational flying hours.
2026
2027
476
 
476
 
 
 
7
Upgrade of Qty 05 Kafir Aircraft 6
Advanced upgradation of Kafir aitcratfs 
2026
2028
   10,370 
 
10,897
 
 
 
8
Construction of Auditorim at SLAF Academy at China 
Bay
Construction of a auditorium building
2025
2027
226
 
226
296
 
 
1
Enhancing Operational Readiness and Humanitarian 
Assistance & Disaster Relief (HADR) capabilities of the 
Sri Lanka Army by acquisition of Military Drone and 
Counter-Drone
Aquiring high-endurance surveillance  military drones and  anti-drone defence 
systems.
2027
2027
344
 
 
344
 
 
2
Capacity Building and Operationalization of the cyber 
security regiment for enhance security and cuber 
resilience
Capacity building and operationalization of the Cyber Security Regiment to strengthen 
cyber defence capabilities, protect critical information systems, and enhance 
cybersecurity preparedness and resilience against evolving cyber threats.
2027
2029
310
 
 
107
100
104
3
Enhancement of Army Digital Correspondence and 
application Platform
Enhancement of the Army’s digital correspondence and application platform to 
streamline administrative processes, improve information sharing, and strengthen the 
efficiency, security, and accessibility of internal communications and digital services.
2027
2031
1,379
 
 
300
272
272
4
Upgradation of Army Headquarters Local Area Network
Replace all End-of-Support (EoS) and End-of-Life (EoL) switches.
2027
2029
638
 
 
223
196
219
5
Upgrading of Sri Lanka Army Transmission Network's 
Core Nodal Transport Network (Digital Backbone) from 
E1 to Gigabit Ethernet Architecture and related 
expansions
Deployment of secure, centralized, and high-speed network connectivity to remote 
Army establishments.
2027
2029
497
 
 
198
105
195
1
Establishment of a Disaster Management Recovery 
Center for State Intelligent Service
Establishment of a Disaster Management Recovery Center
2027
2031
400
 
 
400
 
 
1
Enhance the national security while uplifting the attack 
helicopter capabilities of the Sri Lanka Air Force
Comprehensive overhaul and refurbishment of three Mi-35 helicopters
2027
2029
9,240
 
 
 
8,778
462
Sri lanka Air Force
Overhaul the aircraft’s structural, avionics, power plant, armament, and other systems 
to ensure full operational capability for fulfilling flying requirements in the UN 
Multidimensional Integrated Stabilization Mission in the Central African Republic 
(MINUSCA)
New Projects
Sri Lanka Army
State Intelligence Service
Sri Lanka Air Force
52
Previous page Next page Top

MPIP 2027-2029 · file page 57 printed page 53

Cited in: ICT spend by agency, Ministry and programme movers

Major Public Investment Project 2027-2029
Started/ Expected 
Starting Year
Expected 
Completion Year
Cumulative 
Expenditure (as at 
31.12.2025)
Project Period
  Total Estimated 
Cost (TEC)  
Name of the Project
No
Objectives and Scope of the Project
Revised Budget for 
2026
Estimates for 2027
Projection for 2028
Projection for 2029
2
Enhance the National Security through uplifting the F-7 
GS (Fighter Jet) Aircraft Capabilities of Sri Lanka Air 
Force
Overhaul, refurbishment, and service-life extension of existing grounded F-7GS 
aircraft
2027
2029
3,900
 
 
780
2,210
910
3
The Acquision of 01 Unmanned Aerial Vehicle(UAV) 
Platform with payload
Acquisition of 01 Unmanned Aerial Vehicles (UAV)
2027
2027
3,092
 
*3092
 
 
4
Enhance Search and Rescue (SAR) flights, Firefighting 
operations, Maritime and offshore flights, Humanitarian 
Assistance and Disaster Relies (HADR), Casualty 
Evacuation (CASEVAC), Medical Evacuation 
(MEDIVAC) and pilot training by purchasing of power 
sections and related spares for Bell 412EP helicopters
Acquisition of Qty-1 Pratt and Whitney Power Sections required for the replace Time 
between Overhaul (TBO) 
2027
2028
520
 
 
 
520
 
5
Enhancing National Security through improving aircraft 
serviceability of the Sri Lanka Air Force aircraft fleet
Purchase of Tools and test equipment for flying and engineering formations of SLAF
2027
2028
350
 
 
100
250
 
6
Sustainability and Capability Enhancement of SLAF AN-
32B Fleet for Improved Medium Aircraft and National 
Security requirements
 Purchase of main components for recovery and sustainability of AN-32B aircraft fleet 
2027
2028
1,650
 
 
 
1,650
 
7
Avionics Upgradation of SCH-880 (SCH-280) C-130 
Aircraft
Procurement and commissioning of suitable aircraft and associated support systems to 
enhance SLAF capabilities for HADR
2027
2029
6,900
 
 
3,219
50
3,631
8
Aquiring of 07 Mobile Anti Drone Defence system and 
03 static Anti Drone System to enhance counter Drone 
Capabilities of National Air Defence System
Acquiring of 07 Mobile Anti Drone Defence System and 03 Static Anti Drone System 
to SLAF
2027
2028
7,726
 
*3,863
*3,863
 
9
Strengthening National Security by Uplifting the 
serviceability, reliability, and operational readiness of the 
Beechcraft King Air 300 fleet of the Sri Lanka Air Force
Procurement of spares/ components 
2027
2028
570
 
 
370
200
 
10 Enhance Humanitarian Assistance and Disaster relief 
(HADR) Operational capabilities of Bell 412 & 412EP 
Helicopters by Purchasing of Floatation pack
Purchase of Floatation Pack for Bell 412 & 412EP helicopters 
2027
2027
750
 
 
750
 
11 Enhance the National Security while uplifting the Mi-17 
Helicopter Capabilities of the SLAF by purchasing of 
Major Components for Mi-17 Helicopter fleet SLAF and 
Un Mission at MINUSCA (CAR)
Procurement  of major components for Mi 17 aircrafts
2027
2028
340
 
 
100
240
 
12 Aquiring a Kfir Simulator for No. 10 Squadron
Acquiring a Kfir Simulator
2027
2028
2,900
 
 
27
2,873
 
13 Enhance the National Security while uplifting the 
advanced jet trainer aircraft capabilities of the Sri Lanka 
Air Force
Procurement of overhaul and service-life extension services from the OEM for K-8 
aircraft
2027
2028
2,320
 
 
1,020
1,300
 
14 Enhance the national security while uplifting the medium 
lift helicopter capabilities of the Sri Lanka Air Force
Capital overhaul and refurbishment of  Mi-17 helicopters
2027
2029
15,411
 
 
 
11,340
771
53
Previous page Next page Top

MPIP 2027-2029 · file page 58 printed page 54

Major Public Investment Project 2027-2029
Started/ Expected 
Starting Year
Expected 
Completion Year
Cumulative 
Expenditure (as at 
31.12.2025)
Project Period
  Total Estimated 
Cost (TEC)  
Name of the Project
No
Objectives and Scope of the Project
Revised Budget for 
2026
Estimates for 2027
Projection for 2028
Projection for 2029
15 Enhance the National security while uplifting the Heavy 
lift aircraft capabilities of the Sri Lanka Air Force
Programmed Depot Maintenance (PDM) of one C-130 aircraft
2027
2029
6,200
 
 
1,239
4,651
310
16 Enhance the national security while uplifting the overhaul 
of K-8 and F-7 GS aircraft fleet capabilities of Sri Lanka 
Air force.
Overhaul, repair, inspection, and modification programme for F-7, K-8, and PT-6 
aircraft and components
2027
2027
481
 
 
481
 
 
17 Enhance the national security while uplifting the medium 
lift helicopter capabilities of the Sri Lanka Air Force
To Check and recovery works/overhaul and service life extension of  SCM-860 AN-
32B aircraft
2027
2030
4,660
 
 
1,864
2,019
699
18 Acquisition of Qty 01 C130 Aircraft under U.S. Excess 
Defence Articles (EDA) Programme for Sri Lanka Air 
Force
Acquisition of Qty 01 C130 Aircraft as a grant
2027
2027
6,642
 
 
6,642
 
 
1
Establishment of a Digital Forensic Laboratory
Procurement, installation, configuration, and commissioning of specialized digital 
forensic hardware, software, and secure laboratory facilities, including system 
integration and training of authorized personnel.
2027
2029
855
 
 
212
377
265
2
Replace and upgration of servers, Network & Security 
infrastructure and implementation of new role-over 
Backup Server at the Border Risk Assessment Centre for 
improving the system functioning capabilities
Replacement and upgration of Servers, Network & Security infrastructure and 
implementation of new role-over Backup Server.
2027
2027
420
 
 
420
 
 
3
Architectural Modernization with Hyper converged 
Infrastructure (HCI) in Ministry of Defence
Architectural Modernization with hyper converged Infrastructure (HCI) in Ministry of 
Defence
2027
2027
250
 
 
250
 
 
1
Purchasing of 10 Nos Rigid Hull Inflatable Boat (RHIB) 
to enhance Operational Readiness and Disaster Response 
Capability of Sri Lanka Coast Guard
Purchasing of 10 No's Rigid Hull Inflatable Boats 
2027
2029
383
 
 
77
77
77
2
Construction of 04 Nos Accommodation Type Air-
conditioned Wave Rider Patrol Craft (AWRIPC) for Sri 
Lanka Coast Guard to replace IPC fleet of SLCG which 
are aged beyond 25 years and more
Construction of 04 No’s Accommodation Type Air-conditioned Wave Rider Inshore 
Patrol Craft (AWRIPC) for Sri Lanka Coast Guard to replace IPC fleet of SLCG which 
are aged beyond 25 years and more.
2027
2027
524
 
 
524
 
 
3
Strengthening Sri Lanka Coast Guard Oil Spill response 
Capability through Donation of 3 vessels, Multi-Beam 
Sonar, 20 oil Booms, 4 Crane Trucks, and Associated Oil 
Spill Response Equipment bt JICS(Japan International 
Cooperation System)
Acceptance and deployment of donated vessels, multibeam sonar, oil booms, crane 
trucks, and associated oil spill response equipment
2027
2027
3,378
 
 
3,378
 
 
1
Construction of 20 No's of 23 feet Cedric craft with 02 
No's 200HP OBM (for each craft) to enhance the rapid 
response capability
Construction and commissioning of 20 new 23-foot Cedric craft equipped with twin 
200 HP outboard motors
2027
2030
622
 
 
3
248
248
2
Acquisition of 4 Patrol Boats to upgrade the Fast Gun 
Boat Fleet
Acquisition of 4 Fast Gun Boats
2027
2029
3,000
 
 
1,000
1,000
1,000
Sri Lanka Navy
Ministry of Defence
Department of Sri Lanka Coast Guard
54
Previous page Next page Top

MPIP 2027-2029 · file page 59 printed page 55

Major Public Investment Project 2027-2029
Started/ Expected 
Starting Year
Expected 
Completion Year
Cumulative 
Expenditure (as at 
31.12.2025)
Project Period
  Total Estimated 
Cost (TEC)  
Name of the Project
No
Objectives and Scope of the Project
Revised Budget for 
2026
Estimates for 2027
Projection for 2028
Projection for 2029
3
Retrofitting 8 Patrol Boats to upgrade the fast gun Boat 
(FGB) Fleet with Enhanced Surveillance, 
Communication, and UAV Compatibility
Procurement, installation, integration, and commissioning of shipborne UAV systems 
and associated surveillance
2027
2027
300
 
 
300
 
 
4
Enhancement of Sri Lanka Navy Habour Operations by 
Acquiring Two Tug Vessels
Procurement of a tugboat for the Sri Lanka Navy
2027
2027
1,100
 
 
1,100
 
 
5
Upgrading of 25kW (40 No's) networkable radars in 
Coastal monitoring System
Replacement of obsolete 25 kW radars
2027
2030
590
 
 
118
136
153
6
Standardizing and upgrading of medical and Dental 
equipment's of SLN hospitals
Procurement and replacement of outdated medical and dental equipments of Navy 
Hospitals
2027
2030
400
 
 
100
100
100
7
Upgrading Integrated Maritime Surveillance System 
including Harbour protection Sonar system and Aerial 
surveillance to Strengthen Harbour Security
Procurement, installation, integration, testing, and commissioning of modern 
underwater detection and SONAR systems at Colombo and Trincomalee harbours
2027
2029
354
 
 
142
47
165
8
Equipping 09 x  Disaster Response Units (DRUs) with 
Humanitarian Assistance and Disaster Relief (HADR) 
equipment for rescue operations and rehabilitation 
operation
Equipping 09 x Disaster Response Units (DRUs) with Humanitarian Assistance and 
Disaster Relief (HADR) equipment for rescue operations and rehabilitation operation
2027
2029
858
 
 
286
286
286
9
Ascertaining coastal security through enhancement of 
efficiency of the
Inshore Patrol Craft fleet of Sri Lanka Navy by 
construction of Accommodation Type Air-conditioned 
Wave Rider Inshore Patrol Craft (AWRIPC)
Construction and commissioning of indigenously manufactured Waterjet Rigid 
Inflatable Patrol Craft (WRIPCs) to replace ageing Inshore Patrol Craft (IPCs)
2027
2028
892
 
 
435
457
 
10 Procurement, Installation and Commissioning of 12.7mm 
Remote Controlled Naval Weapon Station (RCNWS) for 
Advances Offshore Patrol Vessels (AOPVs) of Sri Lanka 
Navy to enhance Maritime and National Security
Provision four (04) modern 12.7 mm RCNWS, two for each AOPV        
2027
2027
590
 
 
590
 
11 Upgrading of 50kW (10 No’s) radars in fleet units in Sri 
Lanka Navy
Replacement of existing 50 kW onboard radar systems with modern advanced radar 
systems
2027
2030
250
 
 
50
58
67
12 Upgrading of HF Secure communication network of Sri 
Lanka Navy
Replacement of obsolete SLN HF communication equipment with modern military-
grade HF radio systems incorporating encryption, Automatic Link Establishment 
(ALE)
2027
2031
750
 
 
150
150
150
13 Upgradation of UHF fleet communication and ground to 
air communication systems
Replacement of obsolete UHF fleet communication equipment and expansion of the 
Ground-to-Air VHF communication network
2027
2031
262
 
 
106
106
30
14 Official Security Assistance Program for Sri Lanka Navy
Acuqisition of drones for Sri Lanka Navy
2027
2028
1,428
 
 
510
 
 
* To be ammeded based on the Cabinet Decisions 
55
Previous page Next page Top

MPIP 2027-2029 · file page 60 printed page 56

Cited in: Ministry and programme movers

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion Year
1 UN Peace Keeping Mission
To deploy STF Formed Police unit for the United Nation Peace Keeping Operations and to 
have a foreign income Generation for the country to uplift the current economic situation 
Public order Management. Protecting UN personnel and facilities. Protecting civilian. 
Supporting police operations Adhering to international standards
2017
2027
2,771
2,110
250
100
 
 
2 Construction of a Building to Police Academy
Objective- Providing accommodation facilities for training officers Scope - Build up a three 
storied building for Katana Police Academy
2024
2028
1,185
490
100
150
445
3 Development of Police Training Colleges
Providing required buildings for training colleges
2023
2027
484
182
100
70
 
4 Software Development of Police Department 
Development of software solutions to improve the efficiency, data management, and 
operational processes of the Police Department.
2025
2028
4,700
29
1,000
1,210
1,255
5 Constrction of three story Administrative building  at 
Gonahena (STF)
Construction of a three-story building in order to provide facilities at the Gonahena STF 
camp. (Administrative building, Barracks, etc)
2026
2027
346
96
250
 
 
1 Construction of CID Building
The project aims to centralize all Criminal Investigation Department (CID) divisions into a 
single integrated facility and provide the advanced infrastructure necessary for 
investigative operations.
2027
2029
9,663
500
4,100
5,000
2 Construction of a ward complex with administrative and 
accommodation facilities at the Narahenpita Police Hospital
The Project is initiative focused on constructing a 20-story ward complex and a 12-story 
accommodation building to provide modern, high-quality, and efficient healthcare services 
for active and retired police officers and their families.
2027
2031
8,100
500
3,800
3,800
3 Construction of accommodation building and dining hall 
for Sri Lanka Police (50% contributed by the Police Fund)
The project aims to construct a ten-story accommodation building, standard dining hall, 
and space-optimized parking facility in Colombo to provide modern lodging for senior-
level Sri Lanka Police officers, thereby enhancing their well-being and operational readiness
2027
2029
1,621
162
300
340
4 Construction of Mirihana Police Sports Complex (50% 
contributed by the Police Fund)
The project aims to complete all outstanding civil and stuctural works for a fullly equipped 
indoor facility that will support the well-being of nearly 85,000 active police personnel and 
train athletes for national and international
2027
2029
945
95
5 Completion of the Police Trainning Collage, Attidiya (50% 
contributed by the Police Fund)
The project plan to finalize long-stalled building assets and establish a modern, centralized, 
and technologically advanced training facility designed to enhance the professional 
competencies and operational capabilities of approximately 85,000 police officials.
2027
2029
6,500
300
1,100
1,850
6 Development and Managed Service of an Integrated 
Human Resource Management Information System 
(HRMIS)
The project aims to establish a secure, digitally enabled platform that modernizes and 
automates the end-to-end human resource lifecycle to enhance institutional efficiency, 
transparency, and data-driven decision-making.
2027
2030
376
100
275
 
7 National Incident Management System (IMS) - National 
Police Digital Core Platform
The project aims to establish an integrated, secure, and interoperable platform that 
modernizes policing operations, enhances public safety, and supports transparent and 
accountable criminal justice administration.
2027
2029
370
100
270
 
8 Request for Digital Communication Equipment to the Sri 
Lanka Police
The Project is designed to transition the police's outdated analog communication system  to 
a secure and efficient Digital (Tier II) network to enhance operational capabilities and 
public safety .
2027
2028
1,721
900
400
420
9 Construction of indoor Sports Complex and Swimming 
Pool for National Police Academy
The project aims to enhance the physical fitness, tactical readiness, and disaster response 
capabilities of police personnel.
2027
2029
1,628
200
700
720
Projection for 2028
Projection for 2029
New Projects
Sector:  Governance - Public Security
No
Name of the Project
Objectives and Scope of the Project
Project Period
  Total Estimated 
Cost (TEC)  
Cumulative 
Expenditure (as at 
31.12.2025)
Ongoing Projects
Ministry of Public Security and Parliamentary Affairs
Revised Budget for 
2026
Estimates for 2027
56
Previous page Next page Top

MPIP 2027-2029 · file page 61 printed page 57

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion Year
Projection for 2028
Projection for 2029
No
Name of the Project
Objectives and Scope of the Project
Project Period
  Total Estimated 
Cost (TEC)  
Cumulative 
Expenditure (as at 
31.12.2025)
Revised Budget for 
2026
Estimates for 2027
10 Construction of Academic & Administrative Building 
Stage II at National Police Academy
The project aims to strengthen the academic and institutional capacity of the Sri Lanka 
Police and other law enforcement agencies by establishing a modern, integrated training 
facility.
2027
2029
2,067
330
820
900
11 Enhancement of the Security of the Boarder system in the 
Department of Immigration & Emigration System
The project plans to install 12 Automated Border Control (ABC) e-Gates at Bandaranayke 
International Airport, modernizing the gateway through biometric verification to improve 
passenger processing efficiency and strengthen national security.
2027
2028
1,350
1,000
350
 
12 Establishment of Immigration Temporay Holding Facility- 
Wattala
Establishment of Immigration Temporay Holding Facility- Wattala
2027
2029
1,500
500
500
500
13 Upgrading of Department of Immigration & Emigration 
Existing System
Upgrading of Department of Immigration & Emigration Existing System
2027
2027
975
750
225
 
14 Enhancement of the Security of the Department of 
Immigration & Emigration System
The project aims to enhance the security, resilience, and reliability of the Department of 
Immigration and Emigration's critical ICT infrastructure by implementing a robust disaster 
recovery solution, a centralized Network Operations Center (NOC) monitoring system, and 
privileged access controls.
2027
2028
325
200
125
 
15 Digitalization of Department of Immigration & Emigration 
System
The project aims to modernize and automate the department's core processes to eliminate 
operational delays, enhance cybersecurity readiness, and improve service efficiency for 
over 10 million service receivers.
2027
2028
350
250
100
 
16 Establishment of office and Rest room Complex, 
Trincomalee
The project aims to construct a modern port facility to enhance operational efficiency, staff 
welfare, and immigration service delivery for passengers, investors, business personnel, 
and crew members.  
2027
2029
362
100
260
 
17 Development of Kandakadu Rehabilitation Center
The project plans to enhance and upgrade infrastructure facilities, such as office buildings, 
security fencing, and essential operational amenities. 
2027
2027
801
145
300
300
18 Construction of accommodation building for Other Rank 
Officers
The Project aims to enhance the overall academic, physical, technological, and operational 
training capacity of Sri Lankan law enforcement.
2027
2029
822
90
300
440
57
Previous page Next page Top

MPIP 2027-2029 · file page 62 printed page 58

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion Year
1
House of Justice 
Original Plan 16 Floors, Scope reduce to 6 Floors be fully completed and further 
Construct Structure from 7 Floors to 10 Floors
2021
2026
8,864
6,253
1,400
3,000
1,746
 
2
Support to Justice Sector in Sri Lanka 
Improving access to justice for poor and persons in vulnerable situations, children 
under the care of women inmates in prisons
2022
2027
6,935
87
129
215
226
237
3
Construction of 3000 Rain Water Harvesting System in 
Jaffna District - ONUR Project (India)
Refurbishment of Supreme Court and Court of Appeal with facilities
2017
2028
421
308
15
16
17
4
MOJ Building
Strengthen administration of Justice through support to adopt international best 
practices and tools and strengthen the qualifications and professionalism of Justice 
sector actors
2025
2027
11,943
704
3,100
1,860
2,000
3,692
5
Galle Court Complex
Recommencement of the construction work of the court Complex - Galle
2020
2027
1,686
1,307
300
100
242
 
6
Small Scale Development Programme
Improvement of infrastructure facilities for courts
2021
2027
303
65
284
140
 
 
7
Gampola Court Complex
Enhance court facilities
2017
2028
458
356
20
1
 
 
8
Construction of Court Complexes
in Anuradhapura, Polonnaruwa,
Matale, jaffna and residential
facilities for judges
Construction of court complexes and residential facilities
2021
2027
871
294
240
230
159
 
9
Relocating courts in Rathnapura and Welimada 
Enhance court facilities
2018
2027
3,030
2,424
50
15
 
 
10
Expansion of Courts in Kilinochchi, Theldeniya, 
Pugoda and Kantale 
Construction of courts
2018
2027
1,882
1,271
410
130
 
 
11
Walapane Magistrate Court Complex
Construction of Court Complex Walapane
2022
2028
1,033
92
300
200
300
344
12
 Improvement of the Infrastructure Facilities in the 
Judicial Sector
Improvement of infrastructure facilities for courts
2021
2027
18,500
1,314
1,373
876
1,060
150
13
Construction of Pallekele Prison Complex
Expanding the correctional facilities to meet the increasing needs of the Prison system
2007
2028
4,364
1,474
540
600
630
662
14
Relocation of Prisons in Western Province 
To expand the correctional facilities to meet the increasing needs of the Prison system
2025
2026
318
101
175
150
158
165
15
Enhancement of Sanitary Facilities of detainees in 
Prisoners
Improving hygiene and sanitation of the Prisoners in all Prison Institutions Island wide
2022
2028
1,296
580
350
288
302
318
16
Construction of Kaduwela Court
Construction of four story building
2026
2028
1,233
400
300
500
500
17
Construction of Security Wall and 2 Nos. of inmate 
Building at Watareka Prison
Construction of Ward Buildings ( 2 nos of Two-Story Buildings) and Construct of 20’ 
high parapet wall
2026
2028
256
100
200
210
221
18
Establish a residential correctional centre for the 
Development of community-based corrections at 
Kakirawa
Construction of Offenders Rehabilitation Center and Offenders Hostel including main 
security office, operation office, Individual counseling and medical center, training 
center, stores, hygiene building, electrical and mechanical operation room walls and 
fence.
2026
2027
600
10
350
275
 
Ongoing Projects
Sector:  Governance - Justice
No
Name of the Project
Objectives and Scope of the Project
Project Period
  Total Estimated 
Cost (TEC)  
Cumulative 
Expenditure (as at 
31.12.2025)
Ministry of Justice and National Integration
Revised Budget for 
2026
Estimates for 2027
Projection for 2028
Projection for 2029
58
Previous page Next page Top

MPIP 2027-2029 · file page 63 printed page 59

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion Year
No
Name of the Project
Objectives and Scope of the Project
Project Period
  Total Estimated 
Cost (TEC)  
Cumulative 
Expenditure (as at 
31.12.2025)
Revised Budget for 
2026
Estimates for 2027
Projection for 2028
Projection for 2029
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
1
Project for the Development of Infrastructure in the 
Judicial Sector
The Project is comprising 14 sub-projects.  Its primary goals are to construct and 
modernize court complexes and judicial residences across the country to accelerate the 
resolution of pending cases and create public-friendly environments.
2027
2031
36,748
1,100
5,103
5,117
2
Strengthening Social Cohesion And Dispute Resolution 
in  Sri Lanka (SSDR)
The Project aims to foster a tolerant, inclusive, and peaceful society in Sri Lanka by 
addressing social exclusion, strengthening access to justice through alternative dispute 
resolution mechanisms, and supporting inter-communal economic cooperation, with a 
specific focus on women, youth, and communities in the North, East, and Uva 
provinces
2027
2030
3,054
10
 
 
Department of Prisons
3
Relocation of Matara Prison to Kotawilawatta Area
The Project aims to resolve severe overcrowding at the existing Matara facility by 
constructing a modern, purpose-built correctional facility with a capacity for 1,300 
inmates, thereby enhancing safety, security, and human rights standards while aligning 
prison infrastructure with local town planning and judicial institutions.
2027
2029
5,189
500
2,316
2,000
4
Expansion of Wariyapola Remand Prison
 The project aims to resolve severe overcrowding by expanding capacity to 1,100 
inmates, modernizing physical security, and upgrading facilities to improve welfare 
and operational efficiency. 
2027
2029
4,422
500
800
2,000
5
Capacity expansion of Wataraka Prison (Phase II)
 The Project (Phase II) aims to expand the facility's capacity from 500 to approximately 
1,500 inmates using modern prefabricated construction technology, thereby alleviating 
severe overcrowding at the Welikada, Magazine, and Colombo prisons. 
2027
2029
1,770
500
870
 
Ministry of Justice
New Projects
59
Previous page Next page Top

MPIP 2027-2029 · file page 64 printed page 60

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
1
e Grama Niladari (e-GN) Project to Enhance the ICT usage 
among Grass Root Level Government Officers - Phase II (E-GN 
Project)
To enhance ICT-enabled public service delivery at the grassroots 
level by empowering Grama Niladhari officers with digital tools, 
systems, and technological capacities.
2016
2027
1,689
401
594
 
 
 
2
Implementation of the project to establish and implement a 
business center for incubators/accelerators in Jaffna
To establish a business incubation and acceleration center in Jaffna 
to support entrepreneurship, innovation, and the growth of startups 
and small businesses.
2025
2027
372
 
 
 
 
 
3
Digitalization of Divisional Secretariates Phase II
To strengthen digital governance and improve service delivery by 
expanding ICT infrastructure and digital systems in Divisional 
Secretariats.
2026
2027
500
500
975
1,500
2,000
4
Construction of New Office Building at Negambo Divisional 
Secretariat Division 
To construct a new office building for the Negombo Divisional 
Secretariat to enhance administrative efficiency and improve public 
service delivery.
2026
2028
399
 
200
250
 
 
5
Completion of Homagama Divisional Secretariat Building
To complete the construction of the Homagama Divisional 
Secretariat building to provide improved administrative facilities and 
public services.
2021
2027
512
277
90
100
 
 
6
Continuation construction of Ampara District Secretariat 
Building
To continue and complete the construction of the Ampara District 
Secretariat building to strengthen district-level administrative 
operations and service delivery.
2024
2027
354
237
121
 
 
 
7
Construction of Kalthota Divisional Secretariat Building
To construct a new Divisional Secretariat building in Kalthota to 
improve administrative capacity and accessibility of government 
services to the public.
2024
2027
328
145
190
 
 
 
1
Construction of New Building Complex for Elepatha Divisional 
Secretariat
To construct a modern building complex for the Elapatha Divisional 
Secretariat to enhance administrative efficiency and improve the 
quality and accessibility of public service delivery.
2027
2029
322
 
 
75
175
130
2
Construction of New Administrative Building Complex for the 
Anuradhapura District.
To construct a new administrative building complex for the 
Anuradhapura District Secretariat, comprising modern office and 
public service facilities, to strengthen administrative efficiency and 
improve service delivery.
2027
2029
2,435
 
 
300
1,068
1,067
3
Construction of New Administrative Complex for the District 
Secretariat at Vavuniya 
To construct a new administrative complex for the Vavuniya District 
Secretariat to improve administrative functions and public service 
delivery.
2027
2029
1,560
 
 
500
600
460
4
Construction of Divisional Secretariat Building Complex at 
Dehiattakandiya Divisional Secretariat Division
To construct a new building complex for the Dehiattakandiya 
Divisional Secretariat to enhance administrative and public service 
functions.
2027
2029
704
 
 
190
239
275
5
Construction of an office building for Puttalam District 
Secretariat
To construct a new office building for the Puttalam District 
Secretariat to improve administrative efficiency and public service 
delivery.
2027
2030
2,680
 
 
830
890
890
6
Construction of a new building for Welimada Divisional 
Secretariat 
To construct a new building for the Welimada Divisional Secretariat 
to improve administrative efficiency and public service delivery.
2027
2029
741
 
 
150
300
291
7
Construction of a new building at Uva Paranagama Divisional 
Secretariat 
To construct a new building with modern office and public service 
facilities for the Uva Paranagama Divisional Secretariat to improve 
administrative efficiency and service delivery.
2027
2029
741
 
 
150
300
291
New Projects
Ongoing Projects
Ministry of Public Administration, Provincial Councils and Local Government
Sector:  Governance - Public Management 
No
Name of the Project
Objectives and Scope of the Project
Project Period
  Total 
Estimated Cost 
(TEC)  
Cumulative 
Expenditure (as 
at 31.12.2025)
Projection for 
2029
Projection for 
2028
Estimates for 
2027
Revised Budget 
for 2026
60
Previous page Next page Top

MPIP 2027-2029 · file page 65 printed page 61

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
No
Name of the Project
Objectives and Scope of the Project
Project Period
  Total 
Estimated Cost 
(TEC)  
Cumulative 
Expenditure (as 
at 31.12.2025)
Projection for 
2029
Projection for 
2028
Estimates for 
2027
Revised Budget 
for 2026
8
Construction of New Building for Land and District Registry, 
Colombo.
To construct a new Divisional Secretariat building with modern 
facilities to enhance administrative efficiency and public service 
delivery.
2027
2029
1,916
 
 
65
900
951
9
Nilapiyasa Quarters project – Polonnaruwa District
To construct Nilapiyasa quarters with essential amenities in the 
Polonnaruwa District to support government officers and improve 
public service delivery.
2027
2028
562
 
 
350
212
 
10
Transforming Local Administrative Data Collection Systems for 
SDG Acceleration (One Registry) 
To establish an integrated digital registry for efficient collection, 
management, and sharing of local administrative data to support 
SDG implementation.
2027
2029
1,050
 
 
10
 
 
11
Construction of a New Building for Puttalam District Assistant 
Registrar General Office and Marawila Land Registry Office
Construct a new building with office, records management, and 
public service facilities for the Puttalam District Assistant Registrar 
General Office and Marawila Land Registry Office.
2027
2029
397
 
 
14
250
 
12
Construction of New Building for Land & District Registry, 
Matara  
To construct a new building with office, records storage, and public 
service facilities for the Land and District Registry, Matara.
2027
2029
607
 
 
31
 
 
61
Previous page Next page Top

MPIP 2027-2029 · file page 66 printed page 62

Cited in: Governance, risk and assurance, Privacy and data protection

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion Year
1
Financial sector Safety Net Strengthening Project - FSSNP (WB)
Strengthen financial sector stability through improved safety nets, regulation, and 
institutional capacity.
2024
2027
44,700
39,160
3,532
3,220
 
 
2
Rolling out of ITMIS Programme to expenditure units
Expand ITMIS to government expenditure units to improve financial management and 
reporting.
2019
2027
6,342
644
 
 
 
 
 
Department of National Planning
 
 
 
 
 
 
 
 
 
3
Governance for Growth Programme (Australian Grant)
Strengthen governance, public sector capacity, and service delivery through 
institutional reforms.
2021
2030
11,250
817
510
415
341
 
4
Promoting Autonomy, Literacy and Attentiveness through Market 
Alliance (PALAMA) Project in Sri Lanka Phase II
Improve literacy, learning outcomes, and educational inclusion through teacher 
development, learning interventions, stakeholder partnerships, community 
engagement, and institutional capacity strengthening.
2024
2027
10,400
4,528
1,439
3,039
1,400
 
5
Decentralized Capital Budget Programme (DCB)
Reduce regional disparities and promote rural development by empowering local 
representatives to implement small-scale capital projects that address specific 
community needs, enhance living standards, and improve socio-economic conditions 
within their districts
2,250
2,250
2,250
2,250
 
Department of Development Finance
 
 
 
 
 
 
 
 
6
Construction of three warehouses (Local)
Construct three warehouse facilities, including storage buildings, handling facilities, 
utilities, and supporting infrastructure, to improve the storage, security, and 
management of government resources and materials.
2015
2028
895
539
 
45
47
50
 
Department of Public Finance
 
 
 
 
 
 
 
 
 
7
e-Government Procurement Project (e-GN)
Establish and implement a nationwide electronic government procurement system, 
including digital procurement platforms, supplier registration, e-bidding, contract 
management, and supporting ICT infrastructure to enhance transparency and efficiency 
in public procurement.
2023
2027
1,200
133
200
502
402
 
 
Department of Inland Revenue
 
 
 
 
 
 
 
 
 
8
Revenue Administration Management System for Department of 
Inland Revenue (RAMIS) 
Modernize tax administration through the implementation of an integrated Revenue 
Administration Management System covering taxpayer registration, tax filing, 
assessments, revenue collection, compliance monitoring, and reporting functions.
2014
2029
17,990
17,424
3,259
4,285
4,499
4,725
 
Department of Excise
 
 
 
 
 
 
 
 
9
Revenue Administration System for Excise Department (RASED) Digitize excise administration through automated licensing, revenue collection, and 
compliance monitoring.
2024
2027
3,000
64
300
286
260
248
 
Sri Lanka Customs 
 
 
 
 
 
 
 
 
 
10
Development and Implementation of Risk Management Software 
in Sri Lanka Customs
Strengthen customs operations through the development and implementation of a risk 
management software system for cargo profiling, risk assessment, intelligence analysis, 
compliance monitoring, and trade facilitation.
2024
2027
279
33
150
 
11
Implementation of Oracle Exadata System
Enhance government data management capabilities through the establishment of an 
Oracle Exadata platform, including high-performance database infrastructure, data 
storage, security, disaster recovery, and business continuity facilities.
2024
2031
2,198
110
121
198
22
Sector:  Governance - Finance
No
Name of the Project
Objectives and Scope of the Project
Project Period
  Total Estimated 
Cost (TEC)  
Cumulative 
Expenditure (as at 
31.12.2025)
Revised Budget for 
2026
Estimates for 2027
Projection for 2028
Projection for 2029
Ongoing Projects
Ministry of Finance, Planning and Economic Development
Annual
62
Previous page Next page Top

MPIP 2027-2029 · file page 67 printed page 63

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion Year
No
Name of the Project
Objectives and Scope of the Project
Project Period
  Total Estimated 
Cost (TEC)  
Cumulative 
Expenditure (as at 
31.12.2025)
Revised Budget for 
2026
Estimates for 2027
Projection for 2028
Projection for 2029
 
Department of Census and Statistics
 
 
 
 
 
 
 
 
 
12
Census of Population and Housing - 2021
Conduct a nationwide census to collect comprehensive demographic, social, economic, 
and housing data through field enumeration, data processing, analysis, and 
dissemination for national planning and policymaking.
2019
2029
2,918
3,189
8
 
 
 
13
Economic Census 2025 (Agricultural Activities)
Collect, compile, and analyze comprehensive data on agricultural establishments and 
activities through nationwide surveys, data processing, and statistical reporting to 
support agricultural and economic planning.
2024
2027
1,959
89
505
1,025
 
 
14
Sri Lanka Demographic and Health Survey 2026 (Departmet of 
Census and Statistics)
Conduct a national survey on health, fertility, nutrition, and population indicators.
2026
2028
545
 
543
195
 
 
15
Engineering Design and Construction of High- Rise Offrce 
Complex at "Sethsiripaya" Premises (Stage 111)
The proposed project aims to construct a 25-storey high-rise office complex at the 
Sethsiripaya premises in Battaramulla .
2027
2029
28,020
  
6,800
6,720
1,210
New Projects
63
Previous page Next page Top

MPIP 2027-2029 · file page 68 printed page 64

Major Public Investment Project 2027-2029
Started/ Expected 
Starting Year
Expected 
Completion Year
1
Digitalization of Terrestrial Television Broadcasting Project 
(GOSL / JICA)
To convert Sri Lanka’s analogue television broadcasting network into a 
nationwide digital broadcasting system, improving service quality, coverage, and 
spectrum efficiency.
2021
2028
32,000
390
1,250
2,000
2,800
3,000
2
Developing and Upgrading Printing Process through Obtaining 
Modern Printing Machineries and equipment within the period of 
2026-2030 of the Department of Government Printing
To upgrade the printing processes of the through the procurement of modern 
printing machinery and equipment to improve efficiency, quality, and 
productivity.
2026
2030
5,991
 
55
2,306
1,500
2,000
3
Development of Postal Headquarters
To modernize the by upgrading buildings, operational facilities, ICT systems, 
and support infrastructure to improve administrative efficiency and postal service 
delivery.
2027
2028
411
 
 
200
240
 
New Projects
Mass Media
Sector: Governance -  Mass Media
No
Name of the Project
Objectives and Scope of the Project
Project Period
  Total Estimated Cost 
(TEC)  
Cumulative 
Expenditure (as at 
31.12.2025)
Revised Budget for 
2026
Estimates for 2027
Projection for 2028
Projection for 2029
Ongoing Projects
Ministry of Health and Mass Media
64
Previous page Next page Top

MPIP 2027-2029 · file page 69 printed page 65

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
 
Presidential Secretariat
 
 
 
 
 
 
 
 
 
1
Clean Sri Lanka  Programme
Implement and institutionalize programmes and initiatives under the social, environmental, and 
ethical pillars to enhance public sector efficiency, civic responsibility, environmental 
sustainability, accountability, and good governance, thereby promoting sustainable development 
and national well-being.
2025
2029
33,590
2,653
6,500
6,000
8,625
9,693
2
Development Initiatives Coordination and 
Monitoring in Presidential Secretariat
Strengthen the coordination, monitoring, evaluation, and reporting of national development 
programmes and priority projects implemented under the Presidential Secretariat.
2025
2030
1,100
51
508
507
916
1,279
 
 
 
 
 
 
 
 
 
4
Facilitation of implementing /monitoring  
Anti-corruption Act - CIABOC
Strengthen the implementation and monitoring of the Anti-Corruption Act through institutional 
capacity building, digital systems, investigations, public awareness, and stakeholder coordination.
2025
2027
271
 
21
14
15
19
 
National Audit Office
 
 
 
 
 
 
 
 
 
5
Sri Lanka Public Financial Management 
Strengthening Project – National Audit Office
Enhance public financial accountability and audit effectiveness through capacity development, 
audit modernization, digital systems, and institutional strengthening.
2025
2027
1,289
112
371
547
 
 
 
Presidential Secretariat
 
 
 
 
 
 
 
 
 
6
"Pivithuru Purawara” National Waste 
Management Project 
Improve solid waste management through waste collection, recycling, disposal facilities, public 
awareness, and supporting infrastructure in urban and rural areas.
2027
2029
34,315
 
 
5,000
 
 
7
Central Upper watershed Ecological  
Restoration and Management Programme
To implement ecological restoration and sustainable management measures in the upper watershed 
areas of the Central Highlands, with the aim of ensuring the long-term sustainability of 
ecosystems, minimizing environmental degradation, conserving biodiversity, and protecting water 
resources.
2027
2031
38,697
600
620
650
Commission to Investigate Allegations of Bribery or Corruption (CIABOC)
Ongoing Projects
New Projects
Sector: Governance -  Special Spending Units
No
Name of the Project
Objectives and Scope of the Project
Project Period
  Total 
Estimated Cost 
(TEC)  
Cumulative 
Expenditure (as 
at 31.12.2025)
Revised Budget 
for 2026
Estimates for 
2027
Projection for 
2028
Projection for 
2029
65
Previous page Next page Top

MPIP 2027-2029 · file page 70 printed page 66

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion Year
1
Partnership and Innovative Financing to Mainstream Biodiversity and 
Sustainable Land Management in Wet Climatic Zone of Sri Lanka. 
(Grant -GEF)
Conserve globally significant biodiversity by improving land management practices 
in tea and rubber production areas in the Wet Climate Zone through innovative 
Public-Private-- Community Partnerships.
2025
2029
798
34
42
54
2
2
2
Development of the First and Second Biennial Transparency Reports 
and Fourth National Communication of Sri Lanka to the UNFCCC 
(1st and 2nd BTR, FNC) -(UNDP-Grant) 
Fulfill  Sri Lanka’s UNFCCC reporting obligations through the preparation and 
submission of BTR1, BTR2 and the Fourth National Communication, while 
strengthening technical and institutional capacities to integrate climate change 
considerations into national and sectoral development priorities.
2024
2028
370
15
24
2
3
Regional Project on 'Strengthening Resilience of Vulnerable 
Communities in Sri Lanka and India to Increased Impacts of Climate 
Change (ADAPT4R) -(Grant-  Adoptation fund) 
Strengthen access to timely and reliable climate services and enhance the resilience 
of vulnerable farming households, particularly women, through tailored advisories, 
improved agricultural practices and climate-resilient livelihoods.
2025
2029
2,044  
46
150
343
950
500
4
Integrated Management and Environmentally Sound Disposal of POP 
Pesticides in the Agriculture Sector and Mercury and Waste in the 
Healthcare Sector in Sri Lanka (Grant- UNDP)
Strengthen the policy, regulatory and institutional framework for the environmentally 
sound management and disposal of POPs, mercury and hazardous chemicals and 
wastes, while improving healthcare waste management and promoting knowledge 
sharing and effective project monitoring and evaluation.      
2025
2029
1,512
8
121
100
600
600
5
Promoting a Circular Economy in the food sector -Grant
Enhance the recovery, processing, and supply of edible and safe food surplus/waste 
to benefit vulnerable consumers and food producers.(Project proposal has not been 
submitted to NPD)
2025
2027
1,970
27
27
128
6
Mobilizing International and Domestic Climate Finance and Private 
Investments for Climate Resilience in Sri Lanka (Grant-GCF)
Strengthen Sri Lanka's capacity to access and utilize climate finance, particularly 
from the Green Climate Fund (GCF).addressit es readiness gaps and promotes an 
inclusive, sustainable climate finance ecosystem aligned with national climate goals.
2026
2027
295
227
7
Eu Green policy Dialogue  Facility Project (Grant-EU)
Support Sri Lanka’s transition towards a green, circular, carbon-neutral and socially 
inclusive economy, contributing to sustainable economic recovery and long-term 
economic resilience.  
2025
2029
1,942
1
11
1
Climate Smart Sustainable Cities (Grant -GEF) 
The project aims to demonstrate an integrated approach to climate-resilient urban
development by combining wetland conservation, renewable energy, and electric
mobility solutions. 
2027
2030
1,596
25
392
242
2
Tourism for Heritage, Resilience, Inclusion, and Value-driven 
Employment Project (THRIVE) Nature -Grant Project (World Bank)
This project-preparation grant designed to lay the technical and institutional 
foundations for a future larger tourism initiative. The project will finance critical 
preparatory work, including biodiversity assessments, carrying-capacity analyses, 
nature-based tourism (NBT) plans, and detailed engineering designs for selected 
wildlife, forest, and coastal sites. 
2026
2028
325
260
28
3
Construction of the Head Office Building for the Water Resources 
Board  
The project proposes construction of a five-story Head Office in Battaramulla,
incorporating administrative offices, laboratory facilities, training and data centers,
secure storage, and parking with flood-resilient design. 
2027
2029
985
300
685
New Projects
Ongoing Projects
Ministry of Environemnt 
Sector: Environment and Disaster Management - Environment
No
Name of the Project
Objectives and Scope of the Project
Project Period
  Total Estimated 
Cost (TEC)  
Cumulative 
Expenditure (as at 
31.12.2025)
Revised Budget for 
2026
Estimates for 2027
Projection for 2028
Projection for 2029
66
Previous page Next page Top

MPIP 2027-2029 · file page 71 printed page 67

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion Year
No
Name of the Project
Objectives and Scope of the Project
Project Period
  Total Estimated 
Cost (TEC)  
Cumulative 
Expenditure (as at 
31.12.2025)
Revised Budget for 
2026
Estimates for 2027
Projection for 2028
Projection for 2029
4
Promoting Sustainable Economic Benefits through the Conservation 
of Critical Biodiversity and Ecosystem Services in the Eastern and 
Southern Coastal Regions of Sri Lanka (Grant -GEF)
This project aims to implement integrated terrestrial, coastal, and marine
management across Batticaloa, Ampara, and Hambantota to conserve biodiversity
and support local economies. 
2027
2031
1,352
10
335
335
5
Natural Capital valuse of Coastal and Marine Ecosystems in Sri 
Lanka integarted in to sustainable Development Development 
Planning  (Grant -GEF)
Strengthen biodiversity mainstreaming in planning and decision making and 
improved resource targeting for biodiversity conservation using Natural Capital 
Assessment, Accounting and Management effectiveness tracking. This proposed 
initiative will work in four project sites including coastal areas in the Southern, 
Northern, North Western and Eastern Provinces.  
2026
2029
914
6
150
450
308
67
Previous page Next page Top

MPIP 2027-2029 · file page 72 printed page 68

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
1
Resettlement of Displaced People Due to Landslide 
threats and Landslides
Construction of houses for displaced people due to landslide threats and landslides 
2017
2028
    21,050          6,427 
3,000
2,000
2,000
2
Reduction of Landslide Vulnerability by Mitigation 
Measures (Loan- AIIB + Domestic)
Reduce risk and damage from landslides in Sri Lanka through the implementation of 
physical mitigation measures based on investigation/assessment and improvement of 
planning, regulation and instruments associated with landslide management.
2019
2028
27,452
11,897
7,070
3,648
2,152
3
Doppler Weather Radar Systems (Grant-JICA)
Strenthen capability for real-time rainfall monitoring by establishment of a Doppler 
Weather Radar Network, thereby contributing to mitigation of damages by weather-related 
disasters.       
2019
2027
5,203
106
3,747
348
5
1
Implementation of Soil Conservation and Bioengineering 
Measures for Slope Stabilization in Cyclone Ditwah-
Affected Landslide Sites through a Public-Private 
Partnership Model
Stabilize 800–1,000 hectares of landslide-prone areas  using a combination of nature-based 
and engineering solutions, including vegetation, agroforestry, gabions, check dams, and 
drainage systems. 
2027
2029
257
125
100
32
2
Climate-Informed Landslide Risk Mitigation Toolbox for 
Sri Lanka (LaRiMiT-SL) - Phase 1 of SAFE LAND - Sri 
Lanka
Establish a web-based landslide risk mitigation decision-support toolbox (LaRiMiT-SL) for 
Sri Lanka, adapted from a proven Norwegian platform. It integrates climate-adjusted 
rainfall thresholds, national terrain data, and a catalog of 60–80 mitigation options 
(including Nature-based Solutions). 
2027
2028
450
26
24
3
Strengthening of emergency response and Early warning 
capacity by providing equipment 
Strengthen emergency response and early warning capacity through the provision of 
essential disaster response equipment such as rescue boats, generators, chainsaws, drones, 
water tanks, and water purification units to District Disaster Management Coordination 
Units (DDMCUs).
2027
2029
      2,143 
500
1,000
643
4
Establish Multi Hazard Warning Communication System
Rehabilitate 77 existing coastal early warning towers and install 120 new inland towers, 
covering all 25 districts and high-risk flood, landslide, cyclone, and tsunami-prone areas. 
The system will utilize a resilient communication network with VHF, GSM/LTE, and 
satellite redundancy, supported by automated monitoring and backup power systems to 
ensure reliable operation during emergencies.
2027
2029
      1,610 
500
550
560
5
Establishment of a Nationwide Mission-critical VHF 
Digital Radio Communication system For Disaster 
management 
Replaces Sri Lanka’s outdated analog radio system with a nationwide, secure VHF Digital 
Mobile Radio (DMR) trunking network to modernize emergency communications. It 
installs over 40 high-altitude repeater stations and connects local command centers to 
deliver encrypted voice, data, and real-time GPS tracking across all 25 districts. The 
primary goal is to close the "last-mile" warning gap by integrating with Multi-Hazard Early 
Warning towers to ensure uninterrupted alert dissemination to vulnerable communities 
during disaster-induced commercial network failures. 
2027
2029
         976 
670
200
105
6
Disaster Resilient safety Centers Renovation Programe 
Renovate and upgrade 2,500 to 2,600 existing government-owned safety centres across all 
25 districts. Major activities include structural and roof repairs, upgrading water, 
sanitation, and hygiene (WASH) systems, installing solar PV systems with battery backup, 
enhancing disability accessibility (ramps and handrails), supplying emergency response 
kits, and conducting local shelter management training.
2027
2029
      7,500 
1,000
3,000
3,500
Projection for 
2028
Projection for 
2029
Sector: Environment and Disaster Management -  Disaster Management 
New Projects 
Ongoing Projects
Ministry of Defence (Disaster Management)
No
Name of the Project
Objectives and Scope of the Project
Project Period
  Total 
Estimated Cost 
(TEC)  
Cumulative 
Expenditure (as 
at 31.12.2025)
Revised Budget 
for 2026
Estimates for 
2027
68
Previous page Next page Top

MPIP 2027-2029 · file page 73 printed page 69

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion Year
1
Intergrated Rural Development Programme (Praja 
shakthi)
To alleviate multi-dimensional poverty  in Sri Lanka focusing especially on rural and 
estates areas through an integrated development initiative.
2026
2030
200,805
25,000
25,000
33,330
40,115
2
Social Protection Project (WB-GOSL)
To promote sustainable livelihoods of 10,975 families of poor and severely poor 
categories of "Aswesuma" cash transfer beneficiaries through a pilot program
2023
2027
2,560
32
1,105
1,339
 
 
3
Food Relief Programme (WFP) 
To address immediate food and nutrition needs while fostering long-term, sustainable 
solutions through four key strategic outcomes ; Crisis response, Improved Nutrition, 
Resilience Building and Institutional Strengthening.
2023
2027
31,933
6,958
3,140
2,401
4
Promating Resilience and Opportunity for Inclusive 
Recovery Programme (GOSL/ADB)
To expand the coverage of the National Empowerment program by at least 30,000 
households and improve the quality of employment and livelihood services, to 
improve access to social and elderly care through the establishment of at least 5 
model elderly care centers that integrate community based services and to strengthen 
Sri Lanka’s institutional capacity, governance and management information system 
for inclusive, gender-responsive, and adaptive social protection system.
2026
2030
33,600
200
200
3,846
5,390
5
Development of Day Care Centers
To provide daycare and skill development for persons with disabilities who have 
parents/guardians, to provide mental and physical relief to the parents/ guardians 
during the daytime and to encourage the parents/guardians of persons with 
disabilities to engage in productive economic activities.
2026
2030
1,503
391
530
540
42
6
Social Protection Project (WB-GOSL)
To ensure the effective project implementation, strengthening the social protection 
system and it's key delivery systems
2023
2027
2,558
322
336
200
 
1
Finalize the construction of the seeduwa building 
complex phase I belong to the National Institute of 
Social Development.
To complete the remaining activities of the partially completed building complex, 
landscaping the premises, and to procure equipment. 
2027
366
365
 
 
2
Development of the Pannala Welcome Village 
Elderly Home under the National Elderly Secretariat 
Development of the Pannala Welcome Village Elderly Home into a model elderly care 
center by renovating and expanding the current building complex, which is a 
government-run residential care facility. 
2027
2030
412
100
110
120
3
Transport facilities for persons with disabilities at 
daycare center
To provide safe, reliable, and accessible transportation for children with disabilities 
between their homes and skill development daycare centers by purchasing 25 
disability-friendly vehicles for 25 districts.
2027
2031
549
200
220
129
4
Empowerment programme of low income families
To enhance the socio-economic and psychological well-being of 1.2 million low-
income families by increasing the existing income of selected families by 20% per 
annum and improving their psychological well-being.
2027
2030
97,270
4,500
5,000
5,500
Sector: Social Protection
Cumulative 
Expenditure (as at 
31.12.2025)
Project Period
  Total Estimated 
Cost (TEC)  
Name of the Project
No
Objectives and Scope of the Project
Revised Budget for 
2026
Estimates for 2027
Projection for 2028
Projection for 2029
Ministry of Rural Development, Social Security and Community Empowernment
New Projects
Ongoing Projects
Ministry of Rural Development, Social Security and Community Empowernment
Ministry of Finance, Planning and Economic Development
69
Previous page Next page Top

MPIP 2027-2029 · file page 74 printed page 70

Major Public Investment Project 2027-2029
Started/ 
Expected 
Starting Year
Expected 
Completion 
Year
1
Rural Infrastructure Development Project in Emerging 
Region – RIDEP
Improve living standards and develop local livelihoods by upgrading basic infrastructure, 
including rural roads, potable water supplies, and small-to-medium-scale irrigation systems, 
particularly in under-developed and previously affected provinces of Sri Lanka
2017
2027
20,622
7,654
8,000
7,700
2
Establishment of IT Master Plan on Tax Administration 
and Implementation of E- Tax System for Colombo 
Municipal Council Project (KOICA)
Modernize tax administration through an IT Master Plan and implement an E-Tax System to 
improve efficiency, transparency, and public trust, ultimately enhancing local governance and 
taxpayer satisfaction in Colombo
2025
2027
3,112
230
230
3
Local Authority Small Bridges Sustainable Improvement 
Project
Enhance community access, improve road safety, strengthen local livelihoods, and bolster 
environmental resilience by protecting small bridges from natural disasters, particularly flooding
2026
2029
6,866
1,050
2,540
1,100
1,000
1
Local Authority Drainage Sustainable Improvement Project Upgrade storm-water drainage networks in 23 Local Authorities across 9 provinces and 17 
districts to reduce urban flooding, protect road infrastructure, improve environmental sanitation 
and reduce public-health risks. 
2027
2030
1,591
300
400
400
2
Local Authorities Revenue Enhancement Project (LGREP) Strengthen the financial sustainability of selected Local Authorities through tourism-related 
infrastructure, revenue-generating assets, improved revenue collection systems, asset 
management and institutional capacity building. 
2027
2030
40,226
1,000
15,000
15,000
3
Local Authority Public Convenience Center Sustainable 
Improvement Project 
Improve public sanitation facilities across 130 Local Authorities in all 9 provinces, covering 
289 public sanitation nodes, comprising 159 new Public Convenience Centers and 130 
upgraded existing facilities. Standardized facilities will include gender-segregated toilets, 
urinals, hand-washing facilities, disability-accessible units, changing rooms, caretaker/ticket 
counters, children's areas and parking facilities. 
2027
2029
2,795
300
1,300
1,195
4
Local Authority Water Supply Sustainable Improvement 
Project (LAWSIP)
Rehabilitate and improve approximately 235 Local Authority-managed water supply schemes, 
including water sources, treatment, storage and distribution facilities, NRW reduction, O&M 
equipment and institutional capacity development.
2027
2028
1,863
300
1,563
Sector: Regional Development
Cumulative 
Expenditure (as at 
31.12.2025)
Project Period
  Total Estimated 
Cost (TEC)  
Name of the Project
Ongoing Projects
Ministry of Public Administration, Provincial Councils and Local Government
New Projects
No
Objectives and Scope of the Project
Revised Budget for 
2026
Estimates for 2027
Projection for 2028
Projection for 2029