Major Public Investment Projects 2027-2029
Text converted from the original file. Table layout is approximate.
Find in every document: Digital Economy SLUDI DigiGov Data Protection SLCERT Cyber GovPay RAMIS Single Window e-GP ICTA Artificial Intelligence Head 186 Head 240 Audit Procurement
Pages cited on this site: 7 20 21 56 57 60 66
MPIP 2027-2029 · file page 1
MINISTRY OF FINANCE, PLANNING AND ECONOMIC DEVELOPMENT SRI LANKA 12-11-2026 2029 MAJOR PUBLIC INVESTMENT PROJECTS 2027Next page Top
MPIP 2027-2029 · file page 2
No text on this page (image, chart or blank page).
Previous page Next page TopMPIP 2027-2029 · file page 3
Preface “Major Public Investment Projects 2027–2029” presents the public investment projects recommended by the Public Investment Committee for inclusion in the Annual Budget Estimates for 2027. It provides details of ongoing and new projects with a Total Estimated Cost (TEC) exceeding Rs. 250 million. This publication is prepared in accordance with Section 20(2) of the Public Financial Management Act, No. 44 of 2024. It should be noted that certain public investment projects have been changed in nature at the implementation due to various reasons: the expected year of completion has been changed due temporary suspension, freezing the allocation and scope changes etc. change in total estimated cost as a result of exchange rate fluctuations, additional payments to be made due to suspension of projects, reimbursement of funds and restructuring of projects; budgetary allocation made to meet the financial commitment after the physical completion of the project. All values in the tables are in millions of rupeesPrevious page Next page Top
MPIP 2027-2029 · file page 4
General Education………………………………………………………………………………………. 1 Higher Education………………………………………………………………………………………… 5 Vocational Education……………………………………………………………………………………. 8 Labour……………………………………………………………………………………………………. 9 Youth Affairs and Sports…………………………………………………………………………………. 10 Health……………………………………………………………………………………………………... 11 Religious, Culture and Heritage…………………………………………………………………………… 15 Digital Economy…………………………………………………………………………………………. 16 Science and Technology…………………………………………………………………………………. 18 Agriculture………………………………………………………………………………………………. 19 Livestock…………………………………………………………………………………………………. 21 Plantation…………………………………………………………………………………………………. 22 Fisheries…………………………………………………………………………………………………. 24 Land……………………………………………………………………………………………………… 26 Industry, Trade and Investment Promotion………………………………………………………………. 27 Tourism……………………………………………………………………………………………………. 29 Transport…………………………………………………………………………………………………... 30 Highways…………………………………………………………………………………………………. 33 Ports and Civil Aviation…………………………………………………………………………………... 37 Irrigation…………………………………………………………………………………………………… 38 Power & Energy…………………………………………………………………………………………… 40 Water Supply and Sanitation………………………………………………………………………………. 42 Housing……………………………………………………………………………………………………. 47 Urban Development………………………………………………………………………………………. 48 Governance………………………………………………………………………………………………… 51 Environment and Disaster Management…………………………………………………………………. 66 Social Protection…………………………………………………………………………………………. 69 Regional Development……………………………………………………………………………………. 70 ContentsPrevious page Next page Top
MPIP 2027-2029 · file page 5 printed page 1
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year 1 Primary Education To provide furniture and office equipment including construction, renovation of buildings and structures in primary schools. 264 205 305 310 2 Secondary Education To provide plant, machinery, furniture and office equipment including construction- renovation of buildings and structures in national schools. 2,717 3,930 2,000 1,350 3 Facilitate Education and Training of A/L Vocational Stream Students Construction and renovation of buildings and structures 87 4 E-Thaksalawa To provide plant, machinery and equipment for E-Thaksalawa programme 44 15 25 40 5 Improvement of Sanitation Facilities To construct toilets and provide water facilities for existing toilets in 139 provincial schools and 23 national schools, as well as in rural schools with minimal facilities. 2023 2025 524 34 6 Disaster Mitigation and Safety Improvements in Schools To construct retaining walls to improve the safety and security of both human and physical infrastructure in government schools 2025 2029 400 44 819 400 7 Special Education To provide teacher training, furniture and office equipment including construction- renovation of buildings and structures in schools relating to special education units 82 120 120 135 8 Strengthening of Piriven Education To provide teacher training, curricular development, furniture and office equipment including construction- renovation of buildings and structures in pirivens 310 550 410 410 9 National and Provincial Resource Centers for Children with Special Education Needs To upgrade the resource centers with necessary facilities for children with special education needs 2015 2027 75 16 22 25 25 10 Teacher Development (Capacity Building) To provide teacher training 2016 2029 1,000 101 96 100 100 100 11 Teacher Colleges and Centers - Rehabilitation and Improvement of Capital Assets To improve the infrastructure facilities of the teacher colleges and centers 197 975 1,075 1,375 12 National Colleges of Education - Rehabilitation and Improvement of Capital Assets To provide necessary facilities for National Colleges of Education 596 675 280 290 13 Facility Improvement of National Colleges of Education To construct buildings and structures in National Colleges of Education 2,000 1,400 2,000 2,600 14 Improvement of Teacher Colleges and Centers To construct buildings and structures in Teacher Colleges and Centers 109 300 300 300 15 Establishment of National College of Education for Technology Stream (GOSL/KOICA) To establish the National College of Education for Technology in Narangalla, Kuliyapitiya. 2017 2027 6,582 6,747 780 20 16 Providing Electricity Facilities (through National Grid or Solar) for the schools To provide electricity to all schools currently without access, either through the national grid or through solar power 2016 2026 2,000 1,415 17 Upgrading Plantation Schools to Secondary Level To upgrade 25 schools in the plantation sector to secondary level 2016 2027 250 515 738 360 18 Facilitate Dental Health Facilities in Schools To rehabilitate and upgrade the dental centers in schools with appropriate equipment 2016 2026 250 245 72 75 80 19 Providing Sanitary and Water Facilities for All Schools To ensure the provision of adequate sanitary and safe drinking water facilities for all Primary and Secondary schools across the island. 2016 2025 4,000 7,188 20 Upgrading Facilities of 3,577 Primary Schools To upgrade 3,577 primary schools in the country with the required facilities 2016 2026 10,000 7,740 6 21 Providing Facilities of Teacher Quarters and Rest Rooms etc. for Rural & Regional Schools To facilitate the effective deployment of teachers particularly in the fields of Science, Mathematics, Information Technology and English with special emphasis on regional and rural schools 2016 2026 2,000 1,155 22 Upgrading Facilities of 1,000 Secondary Schools To provide other facilities such as activity rooms, laboratories, multimedia facilities, libraries with e- library facility for secondary schools 2016 2026 15,000 14,865 254 23 Improve Facilities of 1,360 Schools which Were Not Included in Recent Projects To improve the facilities and the quality of neglected schools by recent past years. 2016 2028 30,000 17,946 443 200 Annual Annual Sector: General Education Total Estimated Cost (TEC) Cumulative Expenditure (as at 31.12.2025) Project Period Objectives and Scope of the Project Revised Budget for 2026 Estimates for 2027 Projection for 2028 Projection for 2029 Ongoing Projects Ministry of Education, Higher Education and Vocational Education Name of the Project No Annual Annual Annual Annual Annual Annual Annual Annual 1Previous page Next page Top
MPIP 2027-2029 · file page 6 printed page 2
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year Total Estimated Cost (TEC) Cumulative Expenditure (as at 31.12.2025) Project Period Objectives and Scope of the Project Revised Budget for 2026 Estimates for 2027 Projection for 2028 Projection for 2029 Name of the Project No 24 Construction of Multi-Ethnic Trilingual School in Polonnaruwa (GOSL/India) To construct new school comprising classrooms, laboratories, a library, and necessary furniture and equipment, ensuring inclusive education for all children across different ethnic and religious backgrounds in the region. 2017 2028 1,200 366 290 300 200 25 General Education Modernization Project (GOSL/WB) To improve the quality and strengthen the stewardship of the general education system through curriculum modernization and diversification, teacher development, enhanced educational leadership and management, and the promotion of social equity and inclusion in education (National and Provincial Schools) – Some project activities are implemented by the Provincial Councils 2018 2027 4,759 4,901 2,635 2,200 26 Qualitative Development Reforms in Education To shift from an exam-centric, rote-learning model to one focused more on quality, relevance, practical skills, holistic development, continuous assessment, and preparing students for life & the labour market. 1,774 660 2,000 2,500 27 Technological Education Development Projects (GOSL/OFID) To ensure and promote equitable access to high quality technology education at the secondary level, with a particular focus on senior secondary technology education and vocational training 2018 2027 10,924 5,744 5,260 10 28 Establishment of ICT Hubs Secondary Education (GOSL/ EDCF) To establish a National Content Development Center and strengthen provincial and zonal ICT centers to facilitate for development and enhancement of e-learning content by schools. 2019 2027 5,706 1,100 575 2,500 2,918 29 Upgrading Schools in Plantation Areas (GOSL/India) To upgrade nine plantation schools in the Central, Uva, Sabaragamuwa, and Southern Provinces. 2022 2028 600 235 236 245 30 Schools Development Activities and Grants To achieve DLI decided by Secondary Education Sector Improvement Programme, provision of school based development grant to ensure the equity in education 31 Secondary Education Sector Improvement Programme -SESIP (GOSL/ADB) To transform and align secondary education with the evolving needs of the labor force, focusing on enhancing the quality and relevance of secondary science, technology, mathematics, and commerce programmes, while strengthening school capacity to implement education reforms and improving sector management capabilities. 2021 2026 75,000 41,556 190 32 Enhance Language Competency To improve students’ English proficiency and confidence, enabling them to communicate effectively in personal, academic, and professional settings 2024 2027 500 610 169 180 300 33 Improvement of Infrastructure Facilities in Schools To establish a secure learning environment in schools by providing essential physical infrastructure. 2025 2027 9,600 970 5,000 3,000 2,500 2,500 34 Modernization of School Education To review the school system to prepare a national plan to relocate schools in rural and remote areas 2025 2027 500 156 1,220 2,000 35 Providing Aesthetic Equipment for Improving Aesthetic Education To provide aesthetic equipment to selected schools with the objective of enhancing aesthetic education 2026 2028 1,215 465 455 295 36 Completion construction of urgently needed school infrastructure buildings of identified national schools To construct urgently needed infrastructure in identified national schools. 327 650 200 i Construction of Three Storied Classroom Building with Laboratories for A/L Section for Thurstan College To re-construction of new three-storied classroom building with laboratories for advanced level section for Thurstan College 2026 2028 417 60 240 117 ii Construction of Primary Building for KU/Maliyadeva Boys College, Kurunegala To construct a three-storied building to replace the existing structure which is in a dilapidated condition 2026 2028 392 137 212 43 37 Development of School Hostel Facilities To develop hostel facilities of 126 schools in all Island 2026 2028 1,008 400 400 208 38 School Playground / Sport Infrastructure Development Project To develop school playground with 400m running lane and modern facilities 2026 2029 2,011 583 584 500 344 39 Establishing Activity-Based Learning (ABL) Centers for Commerce Scheme Students and Teachers To enhance practical learning in commerce subjects by promoting collaborative learning, strengthening communication skills and fostering industry academic collaboration 2026 2028 289 100 80 Annual Annual Annual 2Previous page Next page Top
MPIP 2027-2029 · file page 7 printed page 3
Cited in: Cyberlaw and policy scorecard, Digital economy lines, Home, Ministry and programme movers
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year Total Estimated Cost (TEC) Cumulative Expenditure (as at 31.12.2025) Project Period Objectives and Scope of the Project Revised Budget for 2026 Estimates for 2027 Projection for 2028 Projection for 2029 Name of the Project No 40 Construction of Teacher Quarters in Selected Plantation Schools To address structural deficiency by constructing and providing teachers’ quarters in selected 14 plantation schools 2026 2027 465 201 264 41 Developing Physical Infrastructure and Providing Equipment to Provincial Education Departments, Zonal Education Offices, Divisional Educational Offices To construct three-storied buildings and renovate existing buildings of provincial education departments, zonal education offices and divisional educational office 2026 2028 1,265 713 50 502 42 Modernization of Printing Press To purchase two color offset printing machines as the existing machines are outdated 2025 2027 324 100 300 43 Digital Archiving of Certificates To preserve fragile and aging documents to prevent further deterioration and loss of examination records 2025 2027 400 100 150 44 Establishment of SMART class room in Plantation Schools (India) To integrate information and communication technology in plantation schools by providing well- maintained classrooms. 2024 2026 623 600 1 Digital Transformation of General Education (Grade 1-13) in Sri Lanka To establish an integrated, inclusive and secure digital education ecosystem by strengthening digital infrastructure and connectivity, improving education management, and promoting technology-enabled teaching and learning. 2027 2031 96,500 4,000 6,000 14,000 i Enhancement of ICT Infrastructure in 4,250 Government Schools To provide desktop computers for 4,250 government schools to strengthen the provision of technology- enabled education. 2027 2029 9,562 500 4,000 5,062 ii Inclusive Digital Learning Program for Learners with Disabilities in Government Schools and Assisted Special Schools from Grade 1 to Grade 13 To strengthen inclusive digital learning for learners with disabilities in government and Assisted Special Schools from Grade 1 to Grade 13. 2027 2031 2,911 600 750 600 iii Providing Smart Board for Provincial Schools To provide smart boards to provincial schools to enhance technology-enabled teaching and learning. 2027 2029 1,530 350 600 580 iv Development and Implementation of the National Education Management Information System (NEMIS) - Section II (Estimated Cost Rs. 398.69 Mn) To upgrade the NEMIS System. 2027 2031 1,188 150 150 99 v On Boarding New E-mail Infrastructure with E- mail Security and Awareness for Approximately 10,000 Government Schools To establish secure email infrastructure for approximately 10,000 government schools, including email security and user awareness measures. 2027 2029 600 140 300 160 vi Provision of Satellite Internet Connectivity for 1,000 Rural Secondary Schools in Sri Lanka. To provide satellite internet connectivity to 1,000 rural secondary schools to improve access to digital education services and resources. 2027 2029 435 100 200 135 2 Human Resource Development for Education Program (HRDEP) (GOSL/ADB) To address human resource management challenges and capacity gaps within Sri Lanka’s education workforce. 2027 2031 42,768 2,000 5,200 8,000 i Providing Hostel Facilities for Male Students at National College of Education (NCOE) To construct and renovate the hostel facilities including sanitary facilities for male students in National Colleges of Education (NCoEs). 2027 2029 1,870 350 700 820 ii Strengthening Vocational Stream for Senior Secondary Reforms To provide smart classroom facilities for the A/L vocational stream at 612 schools. 2027 2031 1,230 150 300 350 iii Construction and Renovations of All Colleges of Teachers and all Professional Development Centers To rehabilitate and upgrade deteriorated buildings and essential facilities of selected teacher training colleges and teacher professional development centers. 2027 2029 1,569 460 500 609 Department of Examinations Ministry of Plantation and Community Infrastructure New Projects 3Previous page Next page Top
MPIP 2027-2029 · file page 8 printed page 4
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year Total Estimated Cost (TEC) Cumulative Expenditure (as at 31.12.2025) Project Period Objectives and Scope of the Project Revised Budget for 2026 Estimates for 2027 Projection for 2028 Projection for 2029 Name of the Project No iv Development and Implementation of the National Education Management Information System (NEMIS) - Section I (Estimated Cost Rs. 789.40 Mn) To upgrade the NEMIS System. This project component covers only the Human Resource Development costs associated with the NEMIS project. 2027 2031 1,188 124 250 200 v Affiliation of Unawatuna, Balapitiya, Garagama and Batticaloa Teachers Colleges with the National College of Education To expand the capacity for pre-service teacher education by affiiating selected teacher training colleges with NCoEs. 2027 2029 1,094 270 400 424 vi Implementation of an OMR/OCR-Based Automated System and Integrate it with the IBM system for MCQ Paper Evaluation at the Department of Examinations (DoE) To introduce an OMR/OCR-based automated evaluation system integrated with the existing IBM system for the efficient evaluation of MCQ answer scripts 2027 2028 960 420 vii Implementation of a Standardized Record System for Teachers to Promote Instructional Preparedness and Professional Excellence in Government Schools of Sri Lanka To issue a digital record book for teachers. 2027 2029 378 126 150 102 3 School Laboratory Development and Modernization Project To address the shortage of laboratory facilities through infrastructure development, provision of modern equipment, installation of essential utilities and safety systems and teacher capacity building. 2027 2029 4,512 510 2,000 2,002 4 Entire Process Management System with ERP (Enterprise Resource Planning Solution) at DoE To establish a fully integrated, secure and scalable ERP-based system to digitalize and streamline examination-related and administrative process of the Department of Examinations (DoE). 2027 2028 830 30 800 5 Conservation and Renovation of Building in Southland Balika Vidyalaya, Galle To conserve and renovate the historical buildings of Southland College while preserving the architectural heritage of the Galle Fort area. 2027 2030 655 190 200 200 6 Upgrade the Existing Permanent Buildings and Infrastructure Facilities of the Anu/Thambuththegama M.M. Vidyalaya To address the shortage of classroom space caused by increasing student enrolment by upgrading existing facilities and constructing new buildings. 2027 2029 649 150 350 149 7 National Creative Studios Initiative for Aesthetic Education: One Provincial Studio for Each Province To establish and operationalize one Provincial Creative Studio in each province to strengthen the delivery of aesthetic education. 2027 2029 645 50 250 345 8 Construction of a Building Complex for Academic Development and Professional Learning at NIE To address infrastructure and space constraints at NIE by constructing a purpose-built five-storied building complex at the Maharagama premises. 2027 2028 600 50 550 9 Completion and Rehabilitation of Incomplete School Buildings in Vavuniya and Mannar Districts To complete and rehabilitate incomplete school buildings in Vavuniya and Mannar Districts through the required civil, structural, architectural, electrical and finishing works to make the facilities fully functional. 2027 2029 429 175 150 104 10 Construction of New Centralizes Warehouse Facility for Book Storage and Distribution (D- Store) - Education Publication Department To construct a modern and fully equipped warehouse facility to expand the storage and distribution capacity of the Educational Publications Department and improve access to educational publications, textbooks and learning materials. 2027 2029 394 45 149 200 11 Improvement of Learning Environment for Agriculture Education in Schools To strengthen practical agricultural education in 396 national schools by providing essential agricultural equipment and enhancingg students’ practical competencies in Agricultural Science, Food Technology, and Biosystems Technology. 2027 2029 363 50 150 163 12 National Initiative for Quality Science Education in Schools (NIQSEI-S) To strengthen the professional competencies of science teachers through continuous professional development programmes aligned with national education reform priorities. 2027 2031 335 28 75 80 13 Renovation and Improvement of Lumbini Theatre at Lumbini College, Colombo 05 To renovate and upgrade the existing theatre at Lumbini College to provide a safe, modern and fully functional facility for educational, cultural and community activities. 2027 2028 313 123 190 4Previous page Next page Top
MPIP 2027-2029 · file page 9 printed page 5
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year 1 12 storied Building for the Faculty of Medicine , University of Ruhuna To increase the intake of medical undergraduates, and to construct a building that accommodates essential facilities needed for undergraduate education, clinical care, Lab services and health education. 2020 2026 3,195 1,668 1,005 300 2 Establishment of a Professorial Unit at Karapitiya Hospital, University of Ruhuna To Establish a new professorial ward complex comprising 8 wards, each with an approximate capacity of 60-80 beds. 2019 2025 2,808 2,071 935 125 3 Building Complex for the Faculty of Health Care Science, Eastern University (GOSL/Kuwait) To construct building complex for the Faculty of Healthcare Sciences of Eastern University of Sri Lanka. 2016 2026 9,274 6,240 2,016 945 595 4 Wayamba Township Development Project, Wayamba University of Sri Lanka (GOSL/Saudi) To establish a partnership between the University and the surrounding community, strengthening the rural-urban relationship and making a significant impact on the vast catchment area of the University. 2017 2027 9,196 7,095 1,224 965 225 5 Construction of Building in Swami Vipulananda Aesthetic Institute of Batticaloa (GOSL/India) To strengthen the institutional capacity by constructing a New Auditorium 2025 2027 790 300 9 331 120 6 Establishment of Faculty of Medicine, Phase II, Sabaragamuwa University of Sri Lanka (GOSL/Saudi) To construct buildings including professorial unit to expand opportunities for medical education by establishing a new faculty. 2020 2026 16,000 7,460 6,421 1,600 7 Establishment of Medical Faculty, University of Moratuwa (GOSL/Kuwait) To establish a Medical Faculty aimed at producing high-caliber professionals with specialized expertise. 2026 2030 9,500 300 800 2,500 4,000 8 Research and Education Capacity Improvement in Dry Zone Agriculture - University of Jaffna (GOSL/JICA) To develop qualified human resources to enhance agricultural productivity and improve adaptability to climate change in dry-zone agriculture 2025 2029 354 86 88 14 9 Local Bank Loan Obtained to Establish 17 Storied Building, Faculty of Medicine, University of Colombo To Construct and Establish Center of excellence in teaching, learning, research and state of the art health care service through community integration 2017 2026 7,298 5,625 746 750 750 750 10 Scholarship for Undergraduate Degree Programmes at High Ranking Universities To develop a skilled and competitive workforce by providing advanced education and global exposure, thereby contributing to Sri Lanka’s economic growth and sustainable development. 2025 2029 4,000 1,531 400 600 600 600 11 Renovations of Hostels, University of Peradeniya To renovate existing hostels for ensuring the health and safety of students residing at the University 2026 2027 2,452 400 1,200 800 452 12 Establishment of Faculty of Medicine, Phase 1 Uva Wellassa University To construct Pre-clinical Building, Administrative Building and Lecture Halls for the Faculty of Medicine (phase 01)|. 2026 2028 2,149 600 800 1,000 349 13 Completion of Professorial Unit, University of Moratuwa To construct two buildings to accommodate professorial units of the Faculty of Medicine to deliver clinical education and academic functions. 2026 2029 3,594 640 650 2,000 944 14 Providing Hostel Facilities for University Students To provide adequate accommodation facilities for students in higher education, thereby creating a learning environment and enhancing quality of education. 2026 2030 26,625 1,500 3,750 4,000 7,000 15 Establishment of a Professorial Unit at Teaching Hospital Batticaloa, Eastern University of Sri Lanka To strengthen the healthcare system by simultaneously enhancing the quality of clinical training for medical undergraduates 2026 2028 2,279 300 500 1,000 779 16 Construction of Laboratories, Workshops, and Lecture Halls for the Faculty of Technology Studies, Uva Wellassa University To improve the quality of the technology stream by providing required facilities. 2026 2027 700 60 300 400 17 Establishment of Laboratory Complex at Faculty of Agriculture, University of Ruhuna To enhance practical skills of undergraduates of the Faculty of Agriculture while expanding services to the farming communities in the region. 2026 2028 2,342 560 500 1,000 842 18 Establishment of a Laboratory Complex for Medical Laboratory Science at Faculty of Allied Health Sciences, University of Peradeniya To enhance teaching and research capacity in alignment with international standards. 2026 2027 405 120 250 155 Sector: Higher Education Cumulative Expenditure (as at 31.12.2025) Project Period Total Estimated Cost (TEC) Name of the Project Revised Budget for 2026 Estimates for 2027 Projection for 2028 Projection for 2029 Ongoing Projects Ministry of Education, Higher Education , Vocational Education No Objectives and Scope of the Project 5Previous page Next page Top
MPIP 2027-2029 · file page 10 printed page 6
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year Cumulative Expenditure (as at 31.12.2025) Project Period Total Estimated Cost (TEC) Name of the Project Revised Budget for 2026 Estimates for 2027 Projection for 2028 Projection for 2029 No Objectives and Scope of the Project 19 Extension of the Department of Civil and Environmental Engineering Building to house the proposed Heavy Structural Engineering Laboratory and Coastal and Port Engineering Laboratory, University of Ruhuna To enhance the quality of education by providing the necessary infrastructure and facilities. 2026 2027 1,454 252 555 600 299 20 Digital Transformation of the University of Kelaniya To enhance teaching, learning, research, and outreach activities by digitally transforming the University. 2026 2027 476 100 300 176 21 Construction of a Building for Faculty of Allied Health Sciences and Faculty of Dental Sciences, University of Sri Jayewardenepura To construct a seven storied building to house all the Departments of the Faculty of Allied Health Sciences and facilities of the Faculty of Dental Sciences. 2026 2028 3,419 800 800 2,000 619 22 Construction of a Proposed Building for the Faculty of Business, University of Moratuwa To construct a building complex to fulfill the academic needs. 2026 2027 1,309 300 400 600 309 23 Construction of Two Storied Building for Student Service Center for University of Vavuniya To construct a centre that integrates a facilities for students and university community. 2026 2027 474 100 200 274 1 Construction of the State of the Art Building for the Faculty of Allied Health Sciences, University of Jaffna To construct a five-story building encompassing a total area of 12,450 square meters. 2027 2029 2,234 350 1,000 884 2 Construction of Waste Water and Sewerage Treatment Plant, Eastern University of Sri Lanka To establish and operationalize modern treatment plants. 2027 2028 690 250 440 3 Construction of 5 Storied Building Complex at Colombo Premises, Buddhist and Pali University To construct a five-story building with a total floor area of 2,579 square meters. 2027 2029 622 150 300 172 4 Construction of 10 Storied Building for the Faculty of Commerce and Management Studies, University of Kelaniya To construct a ten-story building with a total floor area of 10,000 square meters 2027 2029 2,868 500 1,500 868 5 Construction of Faculty Hub, Faculty of Medicine, University of Peradeniya To establish a “Faculty Hub” by constructing a two storied building to provide an improved dining environment and welfare facilities. 2027 2029 499 150 250 99 6 Construction of a New Central Sewage Treatment Plant, University of Sri Jayewardenepura To establish a wastewater treatment system to effectively manage wastewater generated within the university. 2027 2029 948 350 598 7 Transformation of the Faculty of Science to a Knowledge and innovation Hub to boost the national economy, University of Kelaniya To establish a state-of-the-art multidisciplinary Science and Innovation Complex under the “TRAC-F Pentagon Model” 2027 2033 19,235 100 1,000 4,900 8 Construction and Completion of the Proposed Building for Collaborative Infrastructure Development for the Examination Services & Student Common Learning Area, University of Moratuwa To strengthen academic and student support services through a centralized facility for examinations, learning, and student activities. 2027 2029 1,100 150 700 250 9 Major renovation works in the existing buildings at the Faculty of Humanities and Social Science and Faculty of Science, University of Ruhuna To preserve the safety and functionality of existing academic buildings through major renovation works. 2027 2028 2,152 250 1,902 10 Construction of the Building complex, Faculty of Computing, Sabaragamuwa University To develop modern laboratories, classrooms, and research facilities to strengthen ICT skills development and meet national ICT workforce demand 2027 2029 2,648 250 1,200 898 11 Establishment of the Multipurpose Building for the Faculty of Management, Uva Wellassa University To construct a modern Multipurpose Building 2027 2029 1,143 100 600 443 12 National Creative Arts Education and Industry Development Initiative Project, University of the Visual and Performing Arts To modernize creative arts education in line with international standards and best practices. 2027 2029 570 50 300 220 13 Construction of Administrative Building for the University of Vavuniya To construct a dedicated administrative building to enhance administrative activities. 2027 2028 987 150 837 14 Construction of New Boy’s Hostel Facility, Hardy ATI - Ampara To construct a modern, high-capacity student hostel. 2027 2027 583 117 466 New Projects 6Previous page Next page Top
MPIP 2027-2029 · file page 11 printed page 7
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year Cumulative Expenditure (as at 31.12.2025) Project Period Total Estimated Cost (TEC) Name of the Project Revised Budget for 2026 Estimates for 2027 Projection for 2028 Projection for 2029 No Objectives and Scope of the Project 15 Renovation and Improvement of Internal Road Network, Kilinochchi Premises, University Jaffna To improve the internal road network, drainage system, and pedestrian safety 2027 2028 575 100 300 175 16 Construction of an Extension to the Existing Administration Building, Bhiksu University of Sri Lanka To construct a four-storey extension to address the increasing demand for administrative functions 2027 2028 491 98 393 17 Development of Clinical Training Facilities at Teaching Hospital Kurunegala for Wayamba University of Sri Lanka To strengthen the clinical training capacity of the Faculty of Medicine 2027 2029 1,979 300 1,000 679 18 Construction of Seven Story Laboratory and Teaching Complex, Faculty of Engineering, University of Ruhuna To strengthen the academic, examination, and laboratory infrastructure of the Faculty of Engineering 2027 2028 3,146 300 2,846 19 Construction of Building Complex Faculty of Science, Eastern University of Sri Lanka To provide adequate laboratory and lecture hall spaces to create a conducive and teaching and learning environment. 2027 2029 4,000 300 1,800 1,900 20 Enhancing Teaching Learning Research and Academic Programmes of the Faculty of Agriculture through the Establishment of a Laboratory Complex, Rajarata University of Sri Lanka To improve the practical knowledge, technical skills, and research capacity of the Faculty of Agriculture 2027 2029 1,986 350 1,000 636 21 Construction of New Building Complex for the Falculty of Management and Finance, University of Colombo To construct a new five‑story building to address the significant space constraints faced by the Faculty of Management and Finance. (Generated Fund - LKR 578.82 Mn) 2027 2030 965 100 500 365 22 Preparatory Activities 500 2,500 3,000 Renovation and Refurbishment of Arundhati Theatre of the Sri Palee Campus, University of Colombo To undertake the renovation and conservation of the Arundathi Theatre Hall 2027 2027 288 Building Complex for the Faculty of Arts and Culture (Phase II), Eastern University of Sri Lanka To provide adequate laboratory and lecture hall spaces. 2027 2030 2,250 Design and Construction of Proposed Faculty of Business Studies and Finance Stage II, Kuliyapitiya Premises, Wayamba University of Sri Lanka To address the growing space requirements of the Faculty of Business Studies and Finance 2027 2028 403 Construction and completion of four stories of the proposed 6 story building complex for the Faculty of Indigenous Social Sciences and Management Studies, Gampaha Wickramarachchi University of Indigenous Medicine To establish permanent academic infrastructure (Stage I) by constructing the first four stories of the proposed six-story building complex 2027 2029 1,594 Establish a modern, fully equipped clinical block, Faculty of Medicine, University of Peradeniya To establish a modern, fully equipped clinical building that enhances integrated clinical training facilities 2027 2029 5,000 Construction of Staff Quarters for Executive, Academic, Non- Academic and Academic Supportive Staff University of Vavuniya To provide adequate residential facilities staff members 2027 2030 2,053 23 Establish a Common Teaching Complex at the Faculty of Veterinary Medicine and Animal Science, University of Peradeniya To strengthen veterinary education and human resource development by improving the teaching and learning environment (Dithawa Project) 2027 2029 1,500 500 500 500 24 Construction of Mechanical Engineering Laboratories and Workshop, Faculty of Engineering, South Eastern University of Sri Lanka To establish permanent, safe, and resilient six engineering laboratories and ten mechanical workshops. (Dithawa Project) 2027 2029 1,147 400 450 297 25 Construction of Academic Support Complex, South Eastern University of Sri Lanka To establish a disaster-resilient four-storey Common Academic Support Complex (Dithawa Project) 2027 2029 1,044 370 400 274 26 Construction of New Building at the Puttalam Study Centre, Open University of Sri Lanka To replace the Ditwah cyclone-damaged building with a new disaster-resilient facility. (Dithawa Project) 2027 2027 420 300 120 27 Construction of New Building (60,000 sq.ft), Faculty of Management, University of Peradeniya To Construct a modern, disaster-resilient six-storey building complex (Dithawa Project) 2027 2029 2,175 350 900 925 7Previous page Next page Top
MPIP 2027-2029 · file page 12 printed page 8
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year 1 Establish a Renewable Energy Training with AI, HUB To establish Renewable Energy Training Hub (ACET) through a collaborative initiative between CGTTI-Moratuwa, SLGTI-Kilinochchi, and proposed institute. 2026 2027 398 286 205 130 2 Upgrade VT Centers to Centers of Excellence in each province To upgrade selected VT centers into excellent centers in each province. 2026 2028 4,050 2,000 1,340 1,000 1,100 3 TVET Career Platform Project in Sri Lanka To establish policies and support systems for improving the employment outcomes of Sri Lanka’s vocational and technical education graduates and to strengthen career development guidance and employment support for vocational and technical education trainees. 2022 2026 1,760 1,985 701 4 Vocational Training in Sri Lanka (GOSL/Germany) To improve the quality of Vocational Education and training for all population groups in terms of labor market relevance access and environment sustainability 2019 2026 2,346 1,340 349 106 5 Skills Development System Transformation Programme To strengthen Sri Lanka’s Technical and Vocational Education and Training (TVET) sector by through expanding equitable access to inclusive, employment-oriented training through digital learning, career guidance, industry partnerships, workplace training, and student support. The programme will also strengthen sector governance, regulatory frameworks, accreditation, and public-private partnerships to enhance graduate employability and support sustainable economic growth. 2027 2032 12,000 10 1,740 2,622 5,800 1 Construction New Classrooms and Automobile Technology Workshop (NVQ Level 5 & 6) at University College of Matara, Meddawatta, Matara. To construct a purpose build Automobile Technology workshop equipment for NVQ level 5, 6 practical training at University College Matara 2027 2033 790 50 110 115 2 Development of a Tourism and Hospitality Training Laboratory of University of Vocational Technology (UoVT) To establish a hospitality complex which is fully functional 3 story tourism & hospitality training laboratory at Ratmalana 2027 2029 305 181 124 3 Construction of Student Hostel, Workshop and Canteen for the University of Vocational Technology at Rathmalana To contract a Morden 07 story multipurpose building including student hostel for 600 male student , modern workshop & well equipped canteen for 300 seating capacity 2027 2030 3,380 800 2,105 475 1 Upgrading of 25 Training Centers (Colleges of Technology & Technical Colleges) under budget proposals 2026 To upgrade identified 25 of colleges of Technology and Technical colleges in terms of workshops, strengthening practical learning environment enhancing quality and improve skills of trainer 2027 2030 5,996 1,500 2,000 2,497 No Objectives and Scope of the Project Sector: Vocational Education Cumulative Expenditure (as at 31.12.2025) Project Period Total Estimated Cost (TEC) Name of the Project Revised Budget for 2026 Estimates for 2027 Projection for 2028 Projection for 2029 University of Vocational Technology and University College Department of Technical Education & Training (DTET) Ongoing Projects Ministry of Education, Higher Education , Vocational Education New Projects 8Previous page Next page Top
MPIP 2027-2029 · file page 13 printed page 9
Major Public Investment Project 2027-2029 Sector: Labour Started/ Expected Starting Year Expected Completion Year Ongoing Projects 1 Construction of Mehewara Piyasa (Mehewara Piyasa Interior Works, Common Facilities and other) Mehewara Piyasa Interior Works and Common Facilities to ensure required facilities 2020 2027 1,444 728 143 331 1 Structural renovation of the Labour Secretariat (Old) building in Narahenpita, belonging to the Department of Labour Mitigate safety risks, extend the service life of the asset, and protect the Government’s investment in a strategically important public major government office complex serving approximately 800 officers and 600 daily service recipients. 2027 2029 1,428 263 275 890 New Projects No Name of the Project Objectives and Scope of the Project Project Period Total Estimated Cost (TEC) Ministry of Labour Cumulative Expenditure (as at 31.12.2025) Rivesed Budget for 2026 Estimates for 2027 Projection for 2028 Projection for 2029 9Previous page Next page Top
MPIP 2027-2029 · file page 14 printed page 10
Major Public Investment Project 2027-2029
Started/
Expected
Starting Year
Expected
Completion
Year
1
Development of Provincial and District
Sports Complexes
The establishment of sports complexes equipped with high- quality and complete sports
facilities to cover all the provinces of the country, thereby attracting talented athletes from
all over the island to sports.
To contribute to the economic and social development of the country by improving the
sports skills of the youth.
2011
2026
9,200
8,022
375
340
355
365
2
Completion of Sports stadium Kalmunai
Minimizing disruptions to educational activities due to having to go to training in faraway
areas for school children and other athletes involved in sports, reducing transportation
costs, preventing dropouts from sports by increasing physical fitness and bringing skills to
a maximum level.
2019
2026
282
150
40
3
Establishment of Sports Culture
To provide access to sports infrastructure facilities for the elderly community, youth
community, sports clubs and schools who do not have access to adequate sports facilities.
To minimize government expenditure on developing sports infrastructure facilities by
improving existing facilities and ensuring their optimal utilization.
2025
2027
6,300
428
2,600
2,500
2,570
2,650
4
Programme for Provision of Sports
Infrastructure Facilities for Schools and
Sports Societies in Rural Areas
To identify children with sports talent at the regional level by improving access to sports
for sports-loving school students.
To create a youth who is active and endowed with leadership qualities by improving access
to sports for the sports-loving youth community
To promote the necessary sports infrastructure to build a systematic foundation for
achieving national and international achievements from the sub-national level
2025
2027
1,200
25
450
450
460
470
5
Digital Empowerment for youth: V4R &
National Youth Services Council
Digitalization Smart Youth App
To introduce V4R digital platform to the youth for transforming new ideas and concepts
into marketable products by 2027.
2025
2027
259
3
55
64
6
Renovation, Modification &
Improvement of Multipurpose Hall at
Youth Centre Maharagama for NYSC
To renovate and modify multipurpose hall and increase the lifetime of the national asset in
order to provide infrastructure facility to conduct various programs for youth.
2025
2027
1,564
38
200
386
7
Resurfacing of 400m / 200m and 80m
artificial Synthetic Running Track and
upgrading of related infrastructure
Synthetic Running Track.
Install electronic time machines and 2 Digital screens and EDM.
Renovating flood light towers.
2025
2027
1,063
695
1
Establishment of a National High-
Performance Center (HPC) at Diyagama
Sports Complex
Establish a fully equipped High-Performance Centre with international-standard
infrastructure.
Enhance Sri Lanka’s medal-winning capacity at international competitions.
Develop an integrated system combining coaching, sports science, and athlete monitoring.
2027
2029
3,980
300
1,250
2,340
2
Transformation and upgrading of NYSCO
VIDEO into a National Creative &
Entertainment Technologies Institute
(Young Creative Cluster-YCC)
Establish a national Creative & Entertainment Technologies Institute to develop industry-
ready youth
Integrate digital media, events, and audiovisual production into a unified ecosystem.
Reduce government outsourcing costs through in-house production and event services
2027
2029
380
166
146
68
New Projects
Project Period
Sector: Youth Affirs and Sports
No
Name of the Project
Objectives and Scope of the Project
Ministry of Youth Affairs and Sports
Ongoing Projects
Cumulative
Expenditure (as
at 31.12.2025)
Total Estimated
Cost (TEC)
Rivesed Budget
for 2026
Estimates for
2027
Projection for
2028
Projection for
2029
10Previous page Next page TopMPIP 2027-2029 · file page 15 printed page 11
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year 1 Sri Lanka Primary Healthcare System Enhancing Project (PHSEP) Improve access and quality of primary healthcare services across all districts of Sri Lanka 2024 2028 52,709 269 8,000 14,195 24,823 24,020 2 Construction of ETU Building - NH Kandy 2014 2027 788 300 300 3 Construction of ETU Building - DGH Trincomelee 2014 2027 1,075 200 220 375 4 Construction of ETU Building - TH Kegalle 2014 2025 2,095 500 425 1,100 5 Construction of ETU Building - DGH Ampara 2014 2027 1,589 250 300 195 6 Construction of ETU Building - DGH Chilaw 2014 2025 4,386 500 700 1,500 1,250 7 Improvement of ETU Facilities of Hospitals under the Line Ministry 2014 2025 2,637 650 270 8 Construction of a three-story oncology unit at TH Ratnapura (Stage II). Enhance the treatment capacity of TH Rathnapura 2025 2027 709 205 300 200 190 9 Medical Ward Complex at DGH Chilaw Enhance the treatment capacity of DGH Chilaw 2014 2026 718 257 150 300 150 10 Construction of Ministry Building (16-stroried building) Office building for Ministry of Health, Nutrition and Indigenous Medicine 2016 2027 14,549 6,764 3,000 3,000 2,048 11 Construction of National Stroke Centre at Base Hospital Mulleriyawa Construction of National Stroke Centre 2014 2025 1,111 502 300 150 100 12 Provision of High Quality Radiotherapy for Cancer Patients in Sri Lanka With High Energy Radiation Completion of bunker construction at 10 hospitals and installation of equipment (LINAC). 2014 2026 6,872 5,086 3,120 2,000 13 Construction of Cancer Hospitals at Karapitiya, Kandy and Thellipallai Complete construction of Cancer Hospitals at Thellipallai 2016 2021 3,000 1,612 100 270 14 Upgrading Health facilities of selected hospitals (13 nos.) New Hospital Buildings for selected 13 hospitals in Sri Lanka (Medirigiriya, Padaviya, Rikillagaskada, Kalawana, Samanthurai, Pothuvil, Mahiyanganaya, Eravur, Walasmulla, Aluthgama, Darga Town, Kalpitiya & Meerigama 2019 2025 15,292 13,815 1,250 1,500 15 Establishment of special Pediatric Care Complexes in Karapitiya, Ampara and Jaffna Establishment of special Pediatric Care Complexes in Karapitiya, Ampara and Jaffna 2017 2025 4,676 93 150 500 1,900 16 Establish Bone Marrow Transplant Unit at TH-Kandy Construction of seven-storied building 2017 2027 3,373 1,394 400 400 690 17 Construction of Heart Centre at Lady Ridgeway Hospital Construction of twelve-storied building 2018 2026 6,219 1,939 200 50 18 Establishment of highly specialized Obstetric centers in Colombo, De Zoyza Maternity Hospital Construction of building at De Soyza Maternity Hospital (DMH) Colombo 2018 2024 1,844 259 73 19 A Neonatal and Obstetrics Reference Center for the De Zoyza Maternity Hospital (UK _ Sampath Bank) Construction of building at De Soyza Maternity Hospital (DMH) Colombo 2019 2021 5,800 2,045 212 20 Health System Enhancement Project Strengthening primary healthcare in the North Central, Central, Sabaragamuwa, and Uva Provinces, enhancing health and disease surveillance capacity, and supporting policy development and project management—through the physical infrastructure development of PMCUs and DHs. 2018 2026 10,500 2,400 21 Health System Enhancement Project - Additional Financing –ADB Provision of medical equipment, reagents, consumables, and risk communication activities to prevent the spread of COVID-19. 2021 2026 25,000 8,035 9,445 28,359 Sector: Health Cumulative Expenditure (as at 31.12.2025) Project Period Total Estimated Cost (TEC) Name of the Project Estimates for 2027 Revised Budget for 2026 Projection for 2028 Projection for 2029 To establish Accident and Emergency Treatment Units (ETU) in selected hospitals according to the A & E Policy Ongoing Projects Ministry of Health and Mass Media No Objectives and Scope of the Project 4,687 11Previous page Next page Top
MPIP 2027-2029 · file page 16 printed page 12
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year Cumulative Expenditure (as at 31.12.2025) Project Period Total Estimated Cost (TEC) Name of the Project Estimates for 2027 Revised Budget for 2026 Projection for 2028 Projection for 2029 No Objectives and Scope of the Project 22 Health and Medical Services Improvement Project (JICA) Service improments at the hospitals of TH Kandy, TH Anuradhapura, TH Kurunegala, PGH Badulla, DGH Trincomalee, MLT Training School Colombo, MLT Training School Peradeniya, MLT Training School Kalutara and BME Division Colombo 2018 2025 16,594 603 4,285 4,500 7,300 8,290 23 Construction of Surgical Wards and Operation theatre Complex - DGH Monaragala Improvement of Surgical and Theatre facilities 2019 2027 2,962 342 500 500 500 24 Construction of a Ten-stories Building at the PGH Badulla Improvement of patient care and teaching practices at TH Badulla. 2018 2027 6,998 2,221 1,000 1,000 600 660 25 Establishment of Cardiology unit with Cath Lab at DGH Ampara Enhance access to high-quality cardiac care services in the Ampara District. 2021 2027 720 53 230 186 55 26 Capacity Building of Biomedical Enmgineering Services in Sri Lanka (KOFIH) Renovation and remodeling of BES centers, Provision of BME tools and testing equipment, Provision of service vehicle and machinery, Establishment of inventory management system and Capacity building of biomedical engineers. 2019 2025 1,440 765 1,000 163 27 Programme to improve Non-Communicable Disease Treatment Facilities at the Sri Jayawardhanapura General Hospital (GOSL/GOJ) Supply of and installation of Liver and other Surgical Equipment, Supply of and installation of Ophthalmic Instruments, Supply of and installation of Angio CT machine and Establishment of Dental Unit 2024 2025 1,265 268 28 Project for the Improvement of Infectious Waste Management (GOSL/JICA) Improvement of Infectious Waste Management at the hospitals of Rathnapura, Embilipitiya, Rikillagaskada, Meerigama, Nakulugamuwa, Mahiyanganaya, Puttalam, Mannar, Kurunegala, Avissawella, Medirigiriya, Welikanda, Trincomalee, Hambanthota and Kilinochchi 2024 2026 1,520 809 70 160 180 29 Construction of Surgical Medical Unit TH Karapitiya Construction of surgical and medical wards complex 2016 2024 1,326 773 500 400 675 30 Construction of Cardiac Care Complex, Rathnapura Enhance access to high-quality cardiac care services at TH Ratnapura. 2021 2026 1,575 301 500 500 640 31 Construction of Cancer Hospital - TH Kandy Development of cancer units at TH Kandy 2016 2021 3,862 1,546 420 500 737 32 Construction of five- Story Building at BH Kalawana Construction of five- Story Building at BH Kalawana 2025 2027 315 285 625 300 33 Completion of the construction of a three-story building at DGH Embilipitiya Completion of the three floors of the partly completed building at DGH Embilipitiya. 2025 2026 289 100 75 600 130 34 Health Information and Quality Improvement (Global Fund) Development of integrated health systems, including Health Information Management System (HIMS) and M&E, Laboratory Management Information System (LMIS), healthcare quality and safety, training of paramedical staff, and tuberculosis control. 2021 2025 4,948 3,947 2,985 330 35 Mental Health Development Implement medium-term programme to expand the awareness and counselling services for mental health issues giving special attention for students and adolescents 2025 2029 170 100 20 36 Provision of healthcare treatment for Children with Neurodevelopmental Disabilities, including Autism Implement a 5-year national program to improve health, education and service facilities for children with neurodevelopmental disabilities, including autism across all 25 districts of Sri Lanka 2025 2028 489 100 250 170 37 Manufacturing of Assistive Devices Locally Implement a comprehensive programme to expand locally manufacturing facilities of assistive devices in all provinces 2025 2028 700 200 225 38 Project for the Stabilization of Power Supply Using Renewal Energy at Hospitals (GoSL_JICA) Stabilization of Power Supply Using Renewal Energy at Sri Jayawardhanapura, TH Kurunegala and TH Rathnapura Hospitals 2024 2026 898 454 1,000 400 660 39 Strengthening Integrated Health Care for Universal Health Coverage Program Improve access and quality of Secondary healthcare services across all districts of Sri Lanka 2026 2030 31,000 1,250 6,875 2,500 3,500 12Previous page Next page Top
MPIP 2027-2029 · file page 17 printed page 13
Major Public Investment Project 2027-2029
Started/
Expected
Starting Year
Expected
Completion
Year
Cumulative
Expenditure (as
at 31.12.2025)
Project Period
Total Estimated
Cost (TEC)
Name of the Project
Estimates for 2027
Revised Budget
for 2026
Projection for
2028
Projection for
2029
No
Objectives and Scope of the Project
40 Fleming Fund Phase II Project
Strengthening of the surveillance system in Sri Lanka across Human Health,
Animal Health, Environmental and Food sectors
2025
2026
343
150
150
41 Maternal and Early childhood Nutrition Services Project
Increasing access to selected community-based nutrition interventions for pregnant
and lactating mothers and children under five in four nutritionally vulnerable
districts namely; Nuwaraeliya, Rathnapura, Polonnaruwa and Trincomalee and
improving the capacity of Thriposha Limited to produce rice-based Triposha
2026
2028
870
450
525
175
42 Integrated On Health Pandemic Preparedness & Response
Strengthening Project
Strengthen pandemic preparedness and response capacities of One Health member
institutions
2026
2028
5,430
1,630
1,355
940
43 Construct a four-storied building for establishment of proposed
Operating Theatre, Endoscopy Unit and Thoracic pre-op wards in
Teaching Hospital (TH), Kurunegala
Improve treatment capacity of TH-Kurunegala
2026
2028
1,892
100
500
1,200
44 Primary Healthcare Strengthening through building up
comprehensive NCD Management Capacities
Building up comprehensive NCD Management Capacities and improve selected
primary care facilities in Western and Sabaragamuwa provinces
2026
2031
2,433
500
605
572
45 Surgical and Maternity care with radiology department -DGH-
Matale
Improve infrasture and radiologycal service facilities at DGH-Mathale
2026
2029
2,980
100
500
750
1,130
46 OPD and specialized unit at the Institute of Oral Health (IOH) ,
Maharagama
Construct of five-storied State-of –Art Oral Health complex with the facilities of
Out Patient Door (OPD), ETU, Radiology department, Orthodontic unit, dental
laboratory and facilities for training.
2026
2028
2,240
100
350
1,650
47 Five stories building for institute of forensic medicine and
toxicology (JMO’s Office- Colombo)
Construction of a five-storied building for the Institute of Forensic Medicine and
Toxicology
2026
2028
1,519
100
320
1,000
48 Construction of Accident and Emergency Treatment and Related
service building complex – Phase 01&02 - TH Anuradhapura
Construct a five-storied building Including equipment requirement to establish a
dedicated A&E unit, with 02 ward complexes for Orthopedic unit and 8-bed
operation theater and 6-bed ICU
2026
2028
6,519
200
300
1,300
1,400
49 Construction Consultant's & Medical Officer's Quarters - TH
Anuradhapura
Construction of new, well-equipped residential units for 50 Consultants and 100
Medical Officers
2026
2028
2,200
50
300
1,100
500
50 Extension of Radiology Department -TH Batticaloa
Expand the radiology service facilities at the TH Batticaloa
2026
2027
251
100
171
51 Construction of National Heart Centre (NHC) at NHSL
Establish a 16-storied national cardiology and cardiothoracic care center
2026
2029
12,080
200
1,305
4,500
6,000
52 Construction and Supply of Medical Equipment for Accident and
Emergency Unit - DGH Mannar (GosL_GoI)
Construction of full equiped Accident and Emergency Unit - DGH Mannar
2026
2028
600
230
440
200
53 Human Resource Development
Enhancement of the skills and capacities of healthcare professionals across the
country
2,235
2,950
4,845
5,725
54 Medical Research
Promote medical reaserch culture
500
425
1,080
1,090
55 Medical Supplies
Provide Pharmaceuticals for health institutions
1,515
550
590
800
56 Blood Bank Equipment
Provision of Blood Bank Equipment to Hospitals
1,100
2,000
2,500
2,525
57 Bio Medical Equipment
Provision of Bio-medical Equipment to Hospitals
13,468
15,500
18,000
20,000
58 Lab apparatus
Procurement of Lap apparatus to Hospitals
1,300
1,800
2,000
2,500
59 Maintenance of Medical Equipment
Maintenance of medical equipment in public healthcare institutions
8,400
8,750
9,500
10,000
60 Improvement in Mechanical, Electrical and Sewerage Systems
Improvement of mechanical, electrical, and sewage systems in Hospitals
3,000
3,000
1,000
Annual
Annual
Annual
Annual
Annual
Annual
Annual
Annual
13Previous page Next page TopMPIP 2027-2029 · file page 18 printed page 14
Major Public Investment Project 2027-2029
Started/
Expected
Starting Year
Expected
Completion
Year
Cumulative
Expenditure (as
at 31.12.2025)
Project Period
Total Estimated
Cost (TEC)
Name of the Project
Estimates for 2027
Revised Budget
for 2026
Projection for
2028
Projection for
2029
No
Objectives and Scope of the Project
1
National Survey on Prevalence and underlying causes of anemia
and micronutrient deficiencies among school children aged 10
years to 14 years in Sri Lanka
Conduct National Survey on Prevalence and underlying causes of anemia and
micronutrient deficiencies among school children aged 10 years to 14 years in Sri
Lanka
2027
2028
264
50
315
2
Wolbachia based dengue vector control intervention in Sri Lanka
Establishing a mosquito production facility in Sri Lanka to expand Wolbachia-
based vector control to a large scale, providing a sustainable solution for dengue
outbreaks
2027
2029
1,128
400
400 328
3
Strengthening the 1990 Suwa Seriya National Emergency
Ambulance Service (1990 Suwa Seriya Foundation) through the
Deployment of 100 Fully Equipped Ambulances
Obtain 100 fully equiped Ambulance to "1990 Suwasariya Foundation" and
establish parking station facilities
2027
2028
1,982
1,985
4
Modern Sewage Treatment Plant for Teaching Hospital Badulla
Establish a new Sewage treatment plant with modern technologies
2027
2027
295
295
5
Establishment of 1000 number of Arogya Health and wellness
Centers island-wide for enhancing community access
Establishing 1,000 Arogya Health and Wellness Centers by constructing 200 new
facilities and renovating 800 existing Field Health Clinics
2027
2029
17,440
2,000
2,500 4,500
6
Construction of a National Cancer Screening, Training, and
Research Institute in Sri Lanka
Construction of a National Cancer Screening, Training, and Research Institute Sri
Lanka at Narahenpita
2027
2028
345
50
295
7
Construction of four-storied medical Ward Complex at DGH-
Mullaitivu
Construction of four-storied medical Ward Complex at DGH-Mullaitivu
2027
2028
600
100
500
8
Completion of the construction of four-storied building for
isolation unit (infection disease unit) and paying wards at National
Hospital – Kandy (NHK)
Complete the construction of Isolation Unit
2027
2028
1,094
50
1,045
9
Establishment of a National Liver Transplant Centre (NLTC) at
the National Hospital of Sri Lanka
Construct a six-stored building, equipped with the necessary facilities at NHSL as
National Centre for Liver Transplantation
2027
2029
3,155
50
1,555 1,550
10 Construction of proposed six-storied building for the Accident and
Emergency Unit, Clinics, Diagnostic and Laboratory Complex at
Base Hospital, Puttalam
Construction of proposed six-storied building for the Accident and Emergency
Unit, Clinics, Diagnostic and Laboratory Complex at Base Hospital, Puttalam
2027
2030
4,120
150
850 1,450
11 Extension of the Third Floor of the JICA building for
Hsitopathology and Microbiology laboratory at Teaching Hospital
Jaffna
Establish Hsitopathology and Microbiology laboratory at Teaching Hospital Jaffna
2027
2028
682
50
630
12 Development of Cancer Treatment and Research Unit (Phase II) -
TH Anuradhapura
Complete the Phase II of fully equipped Oncology complex
2027
2029
5,082
100
1,500 2,000
13 Construction of Medical Intensive Care Unit and Medical Ward
Complex - TH Anuradhapura
Construct a Six-storied building for Medical Intensive Care Unit and Medical
Ward Complex
2027
2029
1,081
50
550 580
14 Construction of Maternity Wards, Labour Room and Operation
Theatre and Associated Facilities by extending A & E Building
3rd and 4th floors, Teaching Hospital Batticaloa
Construction of Maternity Wards, Labour Room and Operation Theatre and
Associated Facilities
2027
2029
707
50
480 180
15 Construction and completion of balance work of 4 storied ward
complex at District General Hospital (DGH) - Nawalapitiya
Completion of balance work of 4 storied ward complex
2027
2027
334
235
100
16 Project Preparation activities
Carryout Project Preparation related activities including Feasibility Studies
2027
2027
500
500
New Projects
14Previous page Next page TopMPIP 2027-2029 · file page 19 printed page 15
Major Public Investment Project 2027-2029
Started/
Expected
Starting Year
Expected
Completion
Year
1
Solar facilitation for religious places
Providing Solar facilities for selected religious places
2024
2027
4,200
1
240
1,803
2
Renovation of John De Silva Theater -Stage 1&2
Renovation of John de Silwa Theater
2019
2028
1,567
551
67
180
500
500
3
Modernization of Art Gallery
Provide facilities to artistes and general public
2019
2027
551
251
166
20
5
5
4
Renovation of Archives Main Building
Infrastructure development of Department of National Archives
2019
2027
2,229
741
1,000
885
5
6
5
Installation of a Mobile Racking System for the main building of the
National Archives (Phase-01)
Maximum utilization of available space for expansion of facilities for safe deposit of
documents
2021
2027
700
145
74
250
8
7
6
Establishment of a Digital Repository in Department of National
Archives (Phase I)
Streamlining digital document management
2021
2030
296
76
51
52
52
7
Rebuilding Sri Lanka - Dittwah Projects
Restoration and Rehabilitation of Religious Places, Cultural Centres, and Department of
National Archives Activities Affected by Cyclone Ditwah
2026
2030
1,234
568
8
Developing a Sustainable Digital Cultural Resource Management
System and Capacity building for Data Collection, Management, and
Utilization for Sri Lanka
The Project aims to establish a sustainable digital resource management system, digitize
cultural heritage assets, and build institutional capacity for data collection and utilization
in Sri Lanka.
2027
2030
720
Revised Budget
for 2026
Projection for
2028
Projection for
2029
New Projects
Sector: Religious, Culture and Heritage
Cumulative
Expenditure (as
at 31.12.2025)
Project Period
Total Estimated
Cost (TEC)
Name of the Project
Ongoing Projects
Ministry of Buddhasana, Religious and Cultural Affairs
No
Objectives and Scope of the Project
Estimates for 2027
15Previous page Next page TopMPIP 2027-2029 · file page 20 printed page 16
Cited in: Cyberlaw and policy scorecard, Cybersecurity, Dashboard, Digital economy lines, Education and skills, Governance, risk and assurance, Home, ICT spend by agency, Ministry and programme movers, Privacy and data protection, Topics
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year 1 Sri Lanka Unique Digital Identity (SLUDI) To establish a secure, sovereign, and biometrically anchored digital identity credential for all eligible citizens, linked directly to the National Population Registry. The objectives focus on deploying a national authentication and electronic Know-Your-Customer (eKYC) infrastructure to facilitate seamless single service platform for both government and private sectors, such as banking and telecommunications. 2021 2030 17,464 0.42 910 1,500 2,000 2,200 2 Institution Strengthening, Policy & Regulation To establish a unified national digital governance framework to drive interoperability and secure data sharing across the country. Its core objectives are to legally operationalize the Digital Economy Authority (DEA) for centralized policy enforcement, stand up the Cyber Security Regulatory Authority (CSRA) for critical infrastructure protection, deploy a standardized GovTech operating model to manage shared Digital Public Infrastructure (DPI), and implement a comprehensive digital economy legal stack. In short, this project serves as the foundational mechanism to transition Sri Lanka into a highly standardized, legally enforceable, and secure digital economy. 2026 2030 11,019 949 1,400 1,880 1,970 3 Digital Government Transformation Program (DigiGov-SL) To establish an integrated national ecosystem that shifts government operations toward entirely paperless, cashless, and presenceless digital pathways. The objectives are to scale national Digital Public Infrastructure (DPI) platforms such as the national digital ID (SLUDI), eSignIn, eLocker, and GovPay while deploying a unified citizen access "Super App," launching a collaborative secure government email system, establishing a structured marketplace to stop redundant software procurements, and embedding dedicated Digital Transformation Units (DTUs) inside individual ministries to systematically re engineer back- end public processes. 2026 2030 43,859 702 9,486 11,200 12,000 4 Digital Industry Development and Growth To expand Sri Lanka’s tech sector into a global competitive destination by upskilling the digital workforce, establishing a national incubator and international accelerator program, boosting global lead generation for digital enterprises, and providing secure sandboxes for private-sector DPI experimentation. In a nutshell, this project builds a sustainable, export-led innovation ecosystem designed to drive technology upskilling, attract foreign venture capital, facilitate Global Capability Centers (GCCs), and increase the digital industry's overall contribution to the national economy. 2026 2030 9,235 750 380 520 370 5 Digital Revenue Economy Enablement Initiative To establish a cohesive, digitally governed financial ecosystem designed to formalize economic activity and minimize revenue under reporting.The objectives are to modernize public transaction handling by deeply integrating services with GovPay and digital acceptance rails, implement a standardized national electronic invoicing (eInvoicing) framework that links business accounting directly with tax systems, deploy an integrated National Single Window (NSW) to streamline cross border trade operations, and safely expand digital services to underserved areas using the national digital identity framework. 2026 2030 3,773 655 400 520 570 6 Strategic Industries Digital Enablement Initiative To establish a standardized, platform driven framework that bridges the gap between public infrastructure and private operations.The objectives are to draft and execute sector specific digital transformation blueprints, develop and deploy shared digital platform ecosystems integrated with national Digital Public Infrastructure (DPI) rails such as unified identity, data exchange, and transaction systems and implement extensive ecosystem adoption and training programs to equip small and medium sized enterprises (SMEs) with data driven operational capabilities. 2026 2030 7,225 350 1,619 848 256 Ongoing Projects Ministry of Digital Economy No Objectives and Scope of the Project Sector: Digital Economy Cumulative Expenditure (as at 31.12.2025) Project Period Total Estimated Cost (TEC) Name of the Project Revised Budget for 2026 Estimates for 2027 Projection for 2028 Projection for 2029 16Previous page Next page Top
MPIP 2027-2029 · file page 21 printed page 17
Cited in: Cyberlaw and policy scorecard, Cybersecurity, Dashboard, Digital economy lines, Home, ICT spend by agency, Ministry and programme movers, Privacy and data protection, Topics
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year No Objectives and Scope of the Project Cumulative Expenditure (as at 31.12.2025) Project Period Total Estimated Cost (TEC) Name of the Project Revised Budget for 2026 Estimates for 2027 Projection for 2028 Projection for 2029 7 Inclusive Access, Adoption and Capacity Building To introduce a legally binding, whole of government operating framework designed to sustainably scale the country's digital ecosystem. The objectives are to legally activate the Digital Economy Authority (DEA) with statutory enforcement powers, formalize the GovTech national operating model to manage shared Digital Public Infrastructure (DPI), strengthen the Cyber Security Regulatory Authority (CSRA) to safeguard critical infrastructure, deploy a comprehensive digital economy legal stack, and introduce an Architecture Review Board (ARB) mechanism to mandate design approvals before procurement cycles begin. 2026 2030 5,015 550 2,700 3,500 3,700 8 Informatin and Communication Technology Development Projects Implemented by SLCERT National Cyber Security Operations Centre (NCSOC-Phase I), National Certification Authority (NSA), Threat Hunting and Malware Analysis (MATH) Lab, Digital Forensic Laboratory Enhancement, Cyber Security Capacity Building program, Development of Legislation, Policies, and Standards for Cyber Security. 2016 2029 3,460 1,319 600 590 800 1,000 9 Digitalization of Terrestrial Television Broadcasting To completely transition Sri Lanka's television broadcasting sector from obsolete analog transmission to modern digital technology. The project will fix the extreme technical inefficiencies and signal limitations of the existing analog transmission model. 2011 2028 32,000 420 2,000 2,800 3,000 17Previous page Next page Top
MPIP 2027-2029 · file page 22 printed page 18
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year 1 National Quality Infrastructure (NQI) (Budget Proposal 2025) To fulfilling the desired outcome of the NQI system in the country, testing and calibration labs, referral centers, the referral Center for health research on cancerous inputs, Universities and other conformity assessment bodies inclusive of Industrial Technology Institute will also be developed with an effective coordination mechanism to have efficient service delivery for clients. 2025 2027 1,620 743 377 140 National Institute of Fundamental Studies (NIFS) 2 Stabilization of unstable slope - NIFS To restore the embankments damaged by the earth slips occurred during Ditwah to ensure the safety and stability of the laboratory buildings of NIFS 2026 2027 250* 125 125 3 Scaling Up EcoFriendly Biofilm Bio fertilizer (BFBF) of NIFS (PPP) To expand the application of an eco-friendly Biofilm Bio-fertilizer (BFBF) in paddy cultivation, with the objective of reducing the cost of chemical fertilizer and also minimize adverse consequences of chemical fertilizers to human as well as to the environment. 2026 2028 292 (Domesti c Fund - Rs. 40 Mn) 13 10 13 Vidatha Programme 4 Strategic Industries Digital Enablement Initiative To empower communities by promoting the adoption of innovative technologies and improved production practices among entrepreneurs through a structured, needs-based technology transfer framework, enhancing market access. 2026 2030 399 42 78 80 90 5 Establishing a National Incubation Network to Support Entreprenurenial Growth and Innovation Quality To establish an integrated national incubation network to promote the commercialization of research, local innovations, and grassroots enterprises while providing SMEs and entrepreneurs with equitable access to product development, testing, and certification services. 2026 2030 501 141 200 17.6 6 National Initiative for Research and Development Commercialization To create an Innovation Invention Fund for commercialization of Research Findings 2026 2028 2,500 228 1,286 1,000 *As per Cabinet Decision No. 26/1611/824/022, an allocation of Rs. 125 million each has been approved for the years 2026 and 2027. Sector: Science and Technology Cumulative Expenditure (as at 31.12.2025) Project Period Total Estimated Cost (TEC) Name of the Project Revised Budget for 2026 Estimates for 2027 Projection for 2028 Projection for 2029 Ongoing Projects Ministry of Science and Technology No Objectives and Scope of the Project Presidential Secretariat 18Previous page Next page Top
MPIP 2027-2029 · file page 23 printed page 19
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year 1 Smallholder Agribusiness Partnership Programme (SAPP) * To contribute to smallholder poverty reduction and sustainably increase the income and quality of diet of smallholders households involved in commercial - oriented production and marketing system 2017 2026 28,477 16,611 1,670 18 2 Smallholder Agribusiness Resilience Project (SARP) To contribute to Sri Lanka’s smallholder poverty reduction and food security in the dry zone region. The development objective is to build resilience and market participation of 40,000 rural smallholder households in the project area with women and youth. 2021 2029 17,573 1,803 9,021 4,560 3,150 888 3 Integrated Rurban Development and Climate Resilience Project To develop entire agriculture sector through improving productivty, competitiveness and climate resilience. 2025 2030 30,000 21 6,920 8,725 7,100 8,100 4 Special Program for Food Security and Technology To support activties which are aimed on assuring food security such as; increase productivity and production of specific crops, promotion of agro based industries and entrepreneurship development, management of water & soil nutrients and crop protection. 300 150 5 Development of Minor Irrigation, Village Tank cascade Systems and Abandoned Paddy Lands To enhance the cultivation of other field crops in abandoned and under utilized paddy lands and improve productivity of agriculture lands. 3,000 2,000 2,200 2,500 6 National Seed Production and Purchasing Programme To increase the food production in the country by improving seed production 1,250 1,250 1,300 1,350 7 Development of Youth entreprenures in Agriculture & Industry sector To promote youth engagement in agriculture by facilitating youth entrepreneurship development 1,550 500 505 510 8 Agriculture Value chain Finance and Commercialization Programme To develop agri food value chains into inclusive, sustainable and resilient value chains by increasing competitiveness, promoting agri exports and encouraging food imports. 2026 2030 30,000 7,141 10,585 200 1 National Programme for Paddy Productivity Enhancement through Advanced Yaya, Coupled with Advanced Technological Innovations -2027-2030 To increase national paddy productivity through adoption of best-performing technological packages across selected Yaya fields. 2027 2029 7,560* 400 600 500 2 Implementation of Integrated Soil–Plant Nutrient Management System in Sri Lanka To address the existing gaps in technical knowledge, institutional arrangement and farming practices relating to the plant nutrient management. 2027 2030 239 47 55 60 3 National Programme on Ensuring Seed Security through Enhanced Quality Seed Production -2027 2030 To enhance and ensure the national quality seed availability of paddy, Other Field Crops (OFC), potato and beans through an integrated approach of public-private- farmer modality. 2027 2030 2,365* 250 250 250 4 National Feld Crop Production Programme To achieve national self-sufficiency in essential Other Field Crops (OFCs) by introducing high-yielding cultivation packages to farming communities operating within Yaya based systems, by paddy lands diversifying during the Yala season. 2027 2029 7,968* 800 1,000 1,200 5 Establishment of Modernized 25 Agrarian Service Centers in Every District to Provide All Essential Agricultural Services to Farmers Under One Roof To modernize the selected Agrarian Service Centers (ASCs) in 25 districts to facilitate and strengthen the service delivery for farmers. 2027 2029 7,650* 250 650 630 6 GCF financial support for the Integrated Rurban Development and Climate Resilience Project To finance cooling investments, energy efficient cooling facilities for public sector institutions, institutional support and capacity building. 2027 2030 12,096 20 20 Sector: Agriculture Cumulative Expenditure (as at 31.12.2025) Project Period Total Estimated Cost (TEC) Name of the Project Revised Budget for 2026 Estimates for 2027 Projection for 2028 Projection for 2029 Ongoing Projects Ministry of Agriculture, Livestock, Land and Irrigation Ministry of Agriculture, Livestock, Land and Irrigation No Objectives and Scope of the Project Annual Ministry of Finance, Planning and Economic Development New Projects Annual Annual Annual 19Previous page Next page Top
MPIP 2027-2029 · file page 24 printed page 20
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year Cumulative Expenditure (as at 31.12.2025) Project Period Total Estimated Cost (TEC) Name of the Project Revised Budget for 2026 Estimates for 2027 Projection for 2028 Projection for 2029 No Objectives and Scope of the Project 7 Beyond the Harvest: Transforming Resilient Agrifood Value Chains (Global Agriculture and Food Security Programme GAFSP) To improve the post harvest management practices along the agri-food value chains and strengthen the resilience and productivity of agrifood systems. 2027 2029 6,520 8 8 * To be revised as per the NPD recommendation 20Previous page Next page Top
MPIP 2027-2029 · file page 25 printed page 21
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year 1 Project on Improvement of Productivty in Dairy Sector (JICA) To improve milk productivty of small scale dairy farmers through strengthening the service delivery of Depaertment of Animal Production and Health and respective provincial departments in the areas of vaccine production, disease testing, animal breeding and feed production. 2026 2027 1,050 385 1,050 2 Development of Small and Medium Scale Livestock Development To develop dairy, poultry, goat and swine farmers by providing subidized farm inputs, quality improvement of milk and milk products, encourage Good Animal Husbandry Practices (GAHP) and eco-friendly livestock farming. 1,250 200 200 200 3 Establishment of Animal Breeder farms To increase the animal production through improvement of genetic potential of farm animals 1,100 700 100 100 1 Importation of 2,000 No. of Sheep for meat purpose To establish a nucleus herd of sheep for the improvement of breeding potential and for the expansion of breeding flock and distribution of breeding animals for multiplication particularly targeting commercial meat production. 2,027 2027 1,000 1,000 2 Cattle/Buffalow Breeder Farm Development project at NLDB farms To imporve the genetic potential of domestic cattle and buffaloa herds by importing pure elite breeds of cattle and buffaloa to establish a nucleus herd and multiplication 2027 2029 1,750* * To be revised as per the NPD recommendation * Rs 700 mn has been included in the establsihment of animal breeder farms Sector: Livestock Cumulative Expenditure (as at 31.12.2025) Project Period Total Estimated Cost (TEC) Name of the Project Revised Budget for 2026 Estimates for 2027 Projection for 2028 Projection for 2029 Annual New Projects Ongoing Projects Ministry of Agriculture, Livestock, Land and Irrigation No Objectives and Scope of the Project Annual 21Previous page Next page Top
MPIP 2027-2029 · file page 26 printed page 22
Major Public Investment Project 2027-2029
Started/
Expected
Starting Year
Expected
Completion
Year
1
Cadastral Surveys in the Plantation Sector
Cadastral surveying and mapping, Monitoring the cadastral survey activities and
coordinating with RPCs and other stakeholders on cadastral survey issues.*
2018
2027
700
363
110
193
2
Control and Suppression of diseases in coconut
cultivation
Management of Weligama Coconut Leaf Wilt Disease (WCLWD) in the
protective Zone by Coconut Research Institute and diseased Zone by Coconut
Cultivation Board and Seedling Distribution for selected GN Divisions.
2023
2026
312
271
174
3
Enhancement of coconut production through
establishment of Northern coconut triangle (Rs.
1,650.00 Mn from domestic financing and
Rs. 3,478.00 Mn from beneficiary contribution).
To incraese the annual coconut yield by 100 Mn nuts and to incraese export
income by USD 70 Mn through export of coconut and related products and
thereby, to encourage local and foreign investors for the development of the
coconut plantation industry.
2025
2027
5,128
399
600
650
4
Providing underutilized lands for investments
To incraese efficient and effective land utilization and productivity enhancement
of underutilized lands in the plantation and agriculture sectors.
2025
2026
425
50
175
5
5
Infrastructure Development in the Estate Sector
Restore living conditions for estate families affected by disasters through
improve line housing and amenities, Establish hygienic water and sanitation
facilities,Ensuring a healthier enviornment, Empower estate youth, Enhance
economic and social status of plantation community through livelihood projects
and community development.**
1,985
3,000
3,000
3,500
6
Increasing the productivity of abandoned mature rubber
cultivations through rehabilitation
To rehabilitate abandoned matured rubber cultivations to increase production
and thereby, increase exports.
2026
2028
1,212
296
500
7
Assisting the Farmers for Revitalizing Ceylon Cinnamon
Industry
Transforming Sri Lanka's cinnamon industry through achieving sustainable
growth and global competitiveness.
2025
2027
453
93
250
8
Assisting the Farmers for Export Crop Development
To increase the Export Agriculture Crop (EAC) production by 30 % by 2030,
and to incraese Export income of the EAC of Sri Lanka by 80% by 2030
compared to 2024.
1,164
1,179
1,218
1,264
1
Management of Weligama Coconut Leaf Wilt Disease
(WCLWD) and reestablishment of the coconut
cultivation in the affected areas of the Southern Province
(Included under Control and Suppression of diseases in
coconut cultivation in the Budget Estimate)
Prevent the spread of Weligama Coconut Leaf Wilt Disease from affected areas
to other disease free coconut growing areas of the country and to re-establish the
coconut cultivation disease controlled areas in the Southern Province.
2027
2029
577
100
160
267
2
500 Ceylon Tea Villages
Adopt a multi-demensional and integrated approach to address the identified
issues in the tea smallholding sector***
2027
2029
2,800
730
1,120
650
3
Sustainable Transformation of the Palmyrah Industry to
Support Sri Lanka's Export-Led Growth and Rural
Economic Development through Value Chain
Enhancement, SME Promotion and Innovation
Increase the economic value and export competitiveness of the Palmyrah sector
in Sri Lanka by improving production, quality standards, value addition and
market access.***
2027
2028
236
100
136
New Projects
Ongoing Projects
Ministry of Plantation and Community Infrastructure
Annual
Annual
Ministry of Agriculture, Livestock, Land and Irrigation
Ministry of Plantation and Community Infrastructure
Sector: Plantation
Cumulative
Expenditure (as
at 31.12.2025)
Project Period
Total
Estimated Cost
(TEC)
Name of the Project
No
Objectives and Scope of the Project
Projection for
2029
Projection for
2028
Estimates for
2027
Revised Budget
for 2026
22Previous page Next page TopMPIP 2027-2029 · file page 27 printed page 23
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year Cumulative Expenditure (as at 31.12.2025) Project Period Total Estimated Cost (TEC) Name of the Project No Objectives and Scope of the Project Projection for 2029 Projection for 2028 Estimates for 2027 Revised Budget for 2026 4 Project Preparation Grant for the Regional Empowerment through Vibrant, Inclusive and Viable Economies Project — Phase 2 (REVIVE 2) (Feasibility study) Undertake value chain diagnostics, market analysis, and feasibility study to identify priority agri-food investments in the Northern and Eastern Provinces covering the key value chains in the agriculture, fisheries, livestock, and plantation sectors, as well as related rural enterprises. 2027 2028 330 261 69 5 National Ceylon Cinnamon Productivity, Quality and Global Market Development Programme (2027-2029) (Included under Assisting the Farmers for Revitalizing Ceylon Cinnamon Industry in the Budget Estimate) Enhance productivity, quality, competitiveness and global market positioning of Sri Lanka's Ceylon Cinnamon Industry by increasing national production to 30,000 MT and export earnings to USD 350 Mn by 2029. 2027 2029 1,350 400 450 500 *TEC to be revised. **Included the project titled "Implementation of a Mitigation Plan by National Building Research Organization (NBRO) for Housing Programme in Plantation Sector. ***Included under each respective implementing agency. Ministry of Agriculture, Livestock, Land and Irrigation 23Previous page Next page Top
MPIP 2027-2029 · file page 28 printed page 24
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year 1 Development and Conservation of Lagoons Development and Conservation of the aquatic environment around lagoons and inland reservoirs. 2018 2026 4,200 2,860 150 150 250 2 Development of Myliddy Fishery Harbour Re - Activation of Myliddy Fishery Harbour (Stage I,II & III ) - safe berthing facilities, increase fish production.* 2021 2027 791 525 419 240 3 Construction of Gandara Fishery Harbour Developing a fishery harbour of adequate capacity in Gandara, which would provide safe navigational access and shelter for a variety of fishing craft throughout the year.*/** 2020 2026 11,354 9,537 1,324 1,500 1,995 4 Construction of Rekawa Anchorage Construction of Rekawa Anchorage - Safe Berthing Facilities.* 2020 2026 379 371 22 2 5 Improvement works at Inginiyagala, Murutawela, Dambulla, Iranamadu, Sevanapitiya, Kalawewa, Nuwara Eliya and Udawlawe (Tilapia,Carp & New), Pambala, Kahandamodara, Kallarawa Aquaculture Development Centers of NAQDA in order to enhance the fish/prawn seed production (NAQDA) To increase fish seed supply and improve availability of quality freshwater fish. 2026 2027 250 100 150 6 Rehabilitation of Karainagar Boat Yard of Cey - Nor Foundation Limited (Indian Grant) To Commence operation and create job opportunities by completion of the Karainagar Boat Yard.** 2026 2026 290 290 25 7 Renovation, Rehabilitation and Improvements of Existing Fishery Infrastructure of 15 Harbours To improve the infrastructure available for fishing vessels to support increased fishing activities, enhance safety measures to reduce accidents and improve compliance and increase harbour capacity to handle large volume of boats and fish processing.* 2026 2028 1,804 1,300 300 205 8 Provide Infrastructure facilities for small scale landing sites to increase livelihood through post-harvest loss mitigation To upgrade fishery landing sites to enable higher quality and higher quantity fish production by minimizing the post - harvest losses. 2026 2026 500 500 9 Extension of the Existing Quay Wall, Access Road and Boundary Wall at Valachchenai Fishery Harbour To uplift coastal fisheries sector by providing improved services to fisherman and boats and ensure safe navigation and reduce congestion of the harbour during peak hours. 2026 2028 1,139 350 450 200 100 10 Providing Supportive Equipment for Fisheries Industry from Government of Japan To Strengthen the surveillance system to ensure safety of fisherman and establish cold chain facilities to improve quality and quantity of fish production in Northern and Eastern areas of Sri Lanka.** 2026 2026 1,075 1,001 150 11 Providing Electric Motor Bikes for Field Officers in Fisheries Sector (Indian Grant) To enhance the operational mobility and effectiveness of the fisheries field officers in field visits, awareness, technical support, training programmes and monitoring activities to fishermen and aquaculture farmers and thereby, improve service delivery and accessibility to remote fishing and aquaculture communities and sites.** 2026 2026 345 232 1 Construction of three Finger jetties at wellamankara Fishery Harbour To optimize the usage of harbour basin to anchor more boats which will result in increased availability of fish and reduced post-harvest losses. 2027 2028 649 300 346 2 Enhancing Value Addition in Culture-based Fisheries through Blast Freezer Technology To address the issue of spoilage of fish due to inadequate preservation techniques through the provision of blast freezers which enables the storage of fish at optimal conditions for longer periods preserving the structural intergrity, flavour and nutritional value. 2027 2029 300 100 100 100 Sector: Fisheries Cumulative Expenditure (as at 31.12.2025) Project Period Total Estimated Cost (TEC) Name of the Project Revised Budget for 2026 Estimates for 2027 Projection for 2028 Projection for 2029 Ongoing Projects Ministry of Fisheries, Aquatic and Ocean Resources No Objectives and Scope of the Project New Projects 24Previous page Next page Top
MPIP 2027-2029 · file page 29 printed page 25
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year Cumulative Expenditure (as at 31.12.2025) Project Period Total Estimated Cost (TEC) Name of the Project Revised Budget for 2026 Estimates for 2027 Projection for 2028 Projection for 2029 No Objectives and Scope of the Project 3 Fisheries Technology Development and Ensure Safety at Water To address several critical technological, environmental, industrial and socio- economic gaps affecting to the Sri Lankan fisheries sector at present, by establishing the country’s first integrated HDPE-based fisheries equipment manufacturing and recycling facility. 2027 2030 1,182 400 250 300 4 Integrated Marine Resources Management and Ecosystem Restoration Project To address the increasing need for science-based fisheries and coastal resource management in Sri Lanka's marine and lagoon ecosystems through systematic marine surveys, acoustic surveys, stock assessments, habitat mapping and establishment of a structured surveillance data programme covering biological, physical, chemical and marine-aquatic non-living resource parameters. 2027 2030 1,900 300 600 500 5 Fisheries Research , Innovation Technology and Commercialization To increase the export earnings significantly through the production and commercialization of high-value sea cucumber products and value-added derivatives and to promote transition from unsustainable wild harvesting of the sea cucumber to controlled aquaculture systems, which will help conserve marine biodiversity and restore ecosystem balance. 2027 2030 1,960 600 450 500 6 Strengthening Laboratory Facilities to Compliance the International regulations for the Sustainable Development of Fisheries and Aquaculture and Ocean Resources Sector in Sri Lanka To establish a state-of-the-art Central Laboratory complex to bring all the existing analytical facilities available at different technical divisions of NARA and centralize the activities relevant to the research and services provided by NARA.*** 2027 2029 6,937 100 3,000 3,800 7 National Fisheries Quality Assurance, Safety and Laboratory Network Project To strengthen Sri Lanka’s fisheries quality assurance and food safety system through a coordinated national laboratory network. 2027 2030 6,595 771 1,935 1,935 8 Need Assessment /Feasibility /Studies/ Preparatory Work To conduct need assessments /feasibility studies/ preparatory work for selected 08 projects. 2027 2027 300 300 *TEC to be revised. **Project Duration to be revised. ***PIC instructed to revalidate the TEC. 25Previous page Next page Top
MPIP 2027-2029 · file page 30 printed page 26
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year 1 Land Information Services System in Sri Lanka (LISS) Strengthen the Sri Lanka’s land management capacity through the establishment of Land Data Infrastructure and Consolidated Land Administration System. 2022 2031 18,120 1 313 8 9 9 2 Bimsaviya Programme-Establishing land rights of people Establish a digital system for land information and to provide a globally recognized land title certification 739 800 850 900 3 Land Acquisition for State Purposes Pay compensation for lands acquired for the State Purposes 2,165 1,400 1,500 1,600 1 Construction of Fourth Floor of Land Section of Ministry of Agriculture, Livestock, Lands and Irrigation* To improve the working environment and operational efficiency of the Land Section by constructing the fourth floor of the existing building and providing adequate office accommodation and essential facilities. 2027 2028 495 345 150 Annual New Projects * Include under the operational capital in the budget for 2027 Annual Ongoing Projects Ministry of Agriculture, Livestock, Lands and Irrigation Sector: Land Cumulative Expenditure (as at 31.12.2025) Project Period Total Estimated Cost (TEC) Name of the Project No Objectives and Scope of the Project Revised Budget for 2026 Estimates for 2027 Projection for 2028 Projection for 2029 26Previous page Next page Top
MPIP 2027-2029 · file page 31 printed page 27
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year 1 SME Line of Credit 2 (GOSL/ADB) Enhance SMEs’ access to finance, to support their recovery from the economic crisis and help to improve their adaptive capacity to deal with vulnerabilities stemming from changes in their business operating environment including from climate change. 2025 2030 14,840 Revolving fund 511 5,936 5,938 2 Stimulating Loan Scheme for Re-energizing the MSME Sector Assist the existing MSMEs to survive, recover and expand and to provide seed capital for new MSMEs to commence business. 2024 Annual Revolving fund 29,982 30,000 30,000 30,000 30,000 3 SME Sector Development Programme (GOSL/ADB) Design a sector development programme that strengthens Sri Lanka's MSME financing eco-system and financial literacy. 2026 2028 34,500 7,750 17,250 8,625 4 Colombo Port City Development Project Infrastructure Development Provide necessary basic infrastructure such as water, electricity, drainage etc. 2016 2027 10,508 9,527 876 4,000 1,000 5 Creating an Investment Friendly Environment Introduce necessary reforms to improve transparency and reduce time cost, procedures enabling to create a healthy business environment. 2023 2027 400 115 1,600 1,000 1,500 1,500 6 External Infrastructure Development work for establishment of new Investment Promotion Zone in Bingiriya Economic Processing Zone Develop External Infrastructure work for establishment of new Investment Promotion Zone in Bingiriya Economic Processing Zone. 2019 2027 3,239 1,424 1,487 800 250 7 National Trade Single Window -NSWP Establish a single-entry point for submission of application, documents and information by the import, export and transit traders to fulfill border regulatory requirements in Sri Lanka. 2024 2027 5,921 65 500 1,990 8 Industrial Estate Development Programme (Establishment of an Industrial Estate in the Kalutara (Ingiriya), Kalutara (Raigama - Millaniya Stage II), Gampaha (Katunayaka), Matale District (Dambulla), Anuradhapura (Nochchiyagama), etc) Establish New Industrial Estates and renovation of existing Industrial Estates with key infrastructure facilities and services (electricity, water, road network) to upgrade the industry sector in the country and thereby increase its contribution to country's Gross Domestic Production (GDP). 2023 2029 Annual 824 5,000 3,200 4,800 7,400 9 Establishment of Business Incubators in 9 Provinces - Sri Lanka Promote Entrepreneurship and Innovation of the country, mainly via supporting start-ups, accessing to mentorships and innovation eco system. 2026 2027 285 94 191 10 Sri Lanka Expo Showcase Sri Lanka’s diverse export industries including agricultural, industrial, services, tourism and hospitality sectors, Increase export revenue up to US$ 36 Bn by 2030. 2026 2027 732 450 282 11 Development of Handicraft sector in Sri Lanka 2026 - 2030 Find sustainable solutions for identified issues and problems in the handicrafts sector in Sri Lanka. 2026 2030 420 72 50 116 79 12 Establishing Productivity Evaluation Mechanism for Public, Manufacturing and Service and School sectors, through National Productivity Awards (NPA) Encourage institutions encompassing three key sectors, namely (1) Schools, (2) Manufacturing & Services and (3) Public sector evaluating on the implementation of productivity concepts, resource optimization and sustainable development practices that enhance quality, efficiency, and service delivery. 2025 2027 385 78 174 133 Presidential Secretariat (under Clean Sri Lanka Programme) Ministry of Industry and Entreprenuership Development Ongoing Projects Ministry of Finance, Planning and Economic Development Sector: Industry, Trade and Investment Promotion Cumulative Expenditure (as at 31.12.2025) Project Period Total Estimated Cost (TEC) Name of the Project No Objectives and Scope of the Project Revised Budget for 2026 Estimates for 2027 Projection for 2028 Projection for 2029 27Previous page Next page Top
MPIP 2027-2029 · file page 32 printed page 28
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year Cumulative Expenditure (as at 31.12.2025) Project Period Total Estimated Cost (TEC) Name of the Project No Objectives and Scope of the Project Revised Budget for 2026 Estimates for 2027 Projection for 2028 Projection for 2029 13 Producer Cooperative Society for youth entrepreneurs Provide agricultural equipment to rural agricultural production cooperatives, with the broader goal of creating an innovative transformation in the rural agricultural sector. 2025 2028 800 55 100 100 200 300 1 Establishment of an Industrial Estate in the Batticaloa District -Valachchenai Drive regional industrial growth, enhance infrastructure, and generate local employment by establishing an industrial estate in Valachchenai within the Batticaloa District. 2027 2031 3,000 500 700 900 2 Renovation of Internal road & Drain System - Rathmalana IE Upgrading industrial infrastructure by rehabilitating internal roads and drainage systems to provide an efficient, functional environment for businesses operating in the Ratmalana Industrial Estate. 2027 2027 300 300 3 Establish the Ministry of Industry and Entrepreneurship Development in the new office premises in Narahenpita owned by the Urban Development Authority (UDA) Improving operational efficiency by relocating and centralizing the Ministry of Industry and Entrepreneurship Development into a modern, UDA-owned office facility in Narahenpita. 2027 2029 3,429 1,860 1,500 69 4 Establish a general testing hub for analyze Textile, Apparel, Leather, Footwear, Food, Material, Chemical, Dyes Water, for necessary enhancement of quality of products oriented for local and export market and extend support for research and development in relevant sectors by Sri Lanka Institute of Textile and Apparel (SLITA) Enhance product quality assurance and drives research and development across multiple manufacturing sectors, through a central testing facility and SLITA support, to meet domestic and export market standards. 2027 2029 564 300 164 100 5 Establishment of Traditional Crafts Promotional Villages Foster rural entrepreneurship and preserve cultural heritage by establishing craft promotion villages that empower local artisans with sustainable livelihood opportunities. 2027 2031 500 100 100 100 Ministry of Trade, Commerce, Food Security and Co-operative Development Ministry of Industry and Entreprenuership Development New Projects 28Previous page Next page Top
MPIP 2027-2029 · file page 33 printed page 29
Major Public Investment Project 2027-2029
Started/
Expected
Starting Year
Expected
Completion
Year
1
Market Development Facility Project (MDF) - GOSL
/Australia
Foster inclusive economic growth and poverty reduction
2022
2027
2,500
30
2
IDA Grant Facility for THRIVE Colombo Project Preparation
(GFPP )
The objective of the proposed grant facility is to enable the successful
implementation of the World Bank-funded Tourism for Heritage, Resilience,
Inclusion and Value-driven, Employment Project (THRIVE project) by financing
essential preparatory activities. These include strengthening key tourism
institutions and completing detailed planning, design, and safeguard studies for
proposed tourism investments.
2026
2027
660
108
123
3
Development Assistance- Development of Tourists
Attractions
To ensure the sustainable growth in the Tourism Industry focusing development
of tourism in rural area.
To create direct and indirect employment opportunities and increasing streams of
income for small entrepreneurs and commercial operators.
To develop and popularize lesser-known tourist attractions in the country under
the varieties of thematic initiatives.
To increase the rural community participation in tourism.
2025
2027
3,102
276
800
360
4
Tourism for Heritage, Resillience, Inclusion and Value-
Driven Employment project (GOSL/WB) - THRIVE Colombo
To develop and promote sustainable, high-value, nature-based and heritage
tourism destinations, with a special focus on restoring and showcasing
Colombo’s colonial-era heritage sites and cultural assets, in order to enhance
visitor experiences, generate local employment, stimulate inclusive economic
growth, and strengthen cultural and environmental preservation, while
establishing responsible tourism governance and empowering local communities
through integrated tourism value chains.
2026
2030
29,126
50
136
3,019
5,742
5
Sustainable Tourism Development Project (GOSL/ADB)
Transform the tourism sector into a resilient, inclusive, and sustainable engine of
economic growth, through improved Sector Governance & Strategic Reforms and
Targeted Infrastructure & Destination Development.
2025
2028
30,000
1,475
3,000
3,150
1,387
Rivesed Budget for
2026
Estimates for 2027
Projection for 2028
Projection for 2029
Total Estimated
Cost (TEC)
Cumulative
Expenditure (as at
31.12.2025)
Ongoing Projects
Ministry of Foreign Affairs, Foreign Employment and Tourism
Sector: Tourism
No
Name of the Project
Objectives and Scope of the Project
Project Period
29Previous page Next page TopMPIP 2027-2029 · file page 34 printed page 30
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year 1 Transport Project Preparatory Facility (TPPF) - Resettlement of Unauthorized residents in the Keleni Velly Railway Reservation Resettlement of families living in railway Right-of-Way (ROW) to cater proposed railway line development. 2017 2025 11,255 5,717 840 900 200 2 Colombo Suburban Railway Efficiency Improvement Project (GOSL-ADB) Improving railway efficiency, safety, and sustainability to support safe and efficient movement of people and goods. 2019 2027 40,186 24,488 4,935 12,680 800 3 Rehabilitation of permanent way with new rails and sleepers The project involves replacing aged and damaged rails and sleepers along the railway track to improve safety, operational reliability, and passenger comfort. 4,450 6,100 7,500 8,000 8,500 4 Railway development projects under USD 318 Mn. Credit Line - Procurement of 160 nos. passenger coaches and improvement of Rathmalana workshop, double tracking from Polgahawela - Kurunegala rehabilitation and installation of signalling from Maho - Omantha (GOSL/ India) Rehabilitating and upgrading railway infrastructure and rolling stock to provide safe, reliable, and efficient passenger services 2019 2026 48,494 Track - 20,952 Signaling - 763 9,000 3,000 5 Rehabilitation of old rail passenger coaches The project involves refurbishing old passenger coaches to improve safety, comfort, and service reliability while extending their operational life. 2025 2027 1,800 65 800 600 650 700 6 Manufacturing new passenger coaches Manufacturing passenger carriages locally for Sri Lanka Railways (SLR) to enhance passenger comfort, promote local industry, and reduce the burden on the national budget. 2025 2027 950 500 500 550 600 7 Kelani Railway Bridge Project Rehabilitation of Kelani Railway Bridge. 1,200 1,500 1,500 1,000 8 Acquiring 600 New 49-54 seater standard buses for Sri Lanka Transport Board for long distance operations Providing efficient, comfortable, and reliable long-distance Deluxe bus services while increasing SLTB revenue and reducing emissions through Euro IV compliant buses 2025 2026 17,766 3,600 6,000 4,800 9 Development of Kandy Railway Station to Align and Integrate with Kandy Multimodal Transport Terminal (KMTT) Upgrading and integrating Kandy Railway Station with the KMTT to improve service quality, capacity, passenger experience. 2026 2030 1,500 768 500 10 Procurement of 5 nos. of DMUs Providing safe, efficient, and comfortable passenger train services through value-added fully air-conditioned train sets for suburban commuters 2026 2028 16,500 3,300 5,000 8,300 11 Replacement of 10 old railway bridges Replacing deteriorated railway bridges to enhance railway safety, improve passenger and freight services, and increase railway revenue 2026 2029 8,025 370 1,850 1,000 500 12 Double tracking of railway line from Polgahawela to Kurunegala Improving railway infrastructure to provide efficient passenger and freight services, enhance value-added services, and increase railway revenue. 2026 2029 22,555 100 4,000 13 Development of Kelani vally Railway track from Maradana to Rathnapura Providing an efficient passenger rail service in the Kelani Valley, reducing travel time and road congestion, while supporting future network expansion 2026 2030 28,000 500 330 6,000 7,000 14 Maintanance of Signaling and Communication System Maintaining signaling and communication systems to improve railway safety, reliability, and operational efficiency. 850 1,500 2,500 3,000 Ongoing Projects Ministry of Transport, Highways and Urban Development Projection for 2029 Projection for 2028 Estimates for 2027 Revised Budget for 2026 Annual Annual Annual Sector: Transport Cumulative Expenditure (as at 31.12.2025) Project Period Total Estimated Cost (TEC) Name of the Project No Objectives and Scope of the Project 30Previous page Next page Top
MPIP 2027-2029 · file page 35 printed page 31
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year Projection for 2029 Projection for 2028 Estimates for 2027 Revised Budget for 2026 Cumulative Expenditure (as at 31.12.2025) Project Period Total Estimated Cost (TEC) Name of the Project No Objectives and Scope of the Project 15 Major Reparis to Rolling Stock Restoring and upgrading rolling stock to ensure safe, efficient, and reliable railway operations. 4,000 5,000 6,000 7,000 16 Minor Repairs to Rolling Stock Maintaining rolling stock in optimal condition to support safe, efficient, and uninterrupted railway services. 3,000 3,500 4,000 4,500 17 Plant Machinery and Equipment - Replacement Modernizing plant machinery and equipment to strengthen operational capacity and ensure efficient, reliable operations. 850 2,000 2,000 2,200 18 Installation Level Crossing Protection Reducing rail-road crossing accidents and enhancing transport safety through modern level crossing protection measures. 700 700 700 19 Rehabilitation of Steel Bridges (SLR) Restoring and strengthening steel bridges to ensure safe, resilient, and reliable transport infrastructure 200 300 300 20 Production of Concrete Sleepers Supporting the modernization and sustainability of railway infrastructure through the production of durable concrete sleepers. 300 330 360 21 Surveys, Investigations and Feasibility Studies Supporting data-driven decision-making and optimizing planning through detailed surveys and feasibility studies 500 1 Establishment of the Cluster-based Bus Operation Model in selected Provinces & Districts in Sri Lanka as pilot Operation/Project The project aims to introduce a cluster-based bus operation model in selected provinces and districts as a pilot initiative to improve the efficiency, coordination, and quality of public transport services while enhancing passenger convenience. 2027 2029 526 200 300 2 Metro EV Bus Development project - 2027 Developing the essential infrastructure required for electric buses 2027 2027 5,990 4,500 3 Construction of a New Office Complex for the Head Office of the Deparment of Motor Traffic at the Werahera Office Premises Constructing a modern green office complex for the Department of Motor Traffic to enhance public service delivery, digitalization, operational efficiency, and customer convenience. 2027 2029 8,000 500 3,750 3,750 4 Implementation of a Vehicle Registration and Transfer System at Department of Motor traffic Implementing a digital vehicle registration and transfer system to improve service efficiency, transparency, and public convenience while reducing congestion and manual intervention. 2027 2029 1,473 700 300 426 5 Digital Driver Demerit Points and Road Safety Enforcement Platform for Sri Lanka Establishing a secure, transparent, and digital Driver Demerit Points System to improve traffic enforcement, road discipline, and public trust. 2027 2029 2,245 1,500 700 6 Construction of Kelani Valley (KV) Line from Maradana to Avissawella (Electrification) Developing the Kelani Valley (KV) Railway Line to provide efficient, sustainable, and passenger-oriented rail services, promote transit-oriented development, and support urban growth. 2027 2032 424,293 45,000 75,850 75,850 7 Construction of Main Line from Maradana to Rambukkana of Sri Lanka Railways (Electrification) Developing and electrifying the Main Line in the Colombo suburban area to provide efficient, safe, and integrated passenger and freight transport services, support transit-oriented development, and meet future travel demand 2027 2031 459,651 16,400 110,800 110,800 8 Construction of Coastal Railway Line from Maradana to Kalutara South (Electrification) Developing and electrifying the Coastal Railway Line to meet future passenger demand, improve sustainable rail transport, and support transit- oriented urban development 2027 2031 313,715 17,700 74,000 74,000 9 Railway station Modernization and standardization Programme Upgrading and standardizing railway stations to improve accessibility, passenger facilities, safety, and passenger flow management, 2027 2030 13,520 2,000 3,500 3,500 Annual Ministry of Transport, Highways and Urban Development Annual Annual New Projects Annual Annual Annual Annual 31Previous page Next page Top
MPIP 2027-2029 · file page 36 printed page 32
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year Projection for 2029 Projection for 2028 Estimates for 2027 Revised Budget for 2026 Cumulative Expenditure (as at 31.12.2025) Project Period Total Estimated Cost (TEC) Name of the Project No Objectives and Scope of the Project 10 Construction of New rail track from Mavaththipuram to CPSTL Bulk Depot to support petroleum product transpotation Optimizing the fuel supply chain to ensure reliable fuel distribution, improve transport efficiency, and support regional economic development. 2027 2029 688 250 300 138 11 Renovation of Workshop 27 & 28 at Ratmalana (SLR) Upgrading and modernizing railway workshops to improve locomotive and rolling stock maintenance, operational efficiency, and staff working conditions. 2027 2028 405 150 150 105 12 Acquiring 50 Nos.New 22 Seater Mini Buses for Sri lanka Transport Board for operation in disaster affected Hilly & Rural Roads To provide more reliable, efficient and dependable bus service to people affected by the "Ditwah" cyclone in hilly and rural routes 2027 2027 1,000 1,000 13 Procuring 200 Nos.30-33 seater small new normal buses for Sri Lanka Transport Board for rural operations To provide an efficient and dependable bus service to rural commuters 2027 2027 4,000 4,000 14 SLTB Total Digital Transformation and Integrated Management System Development Project Digitalizing SLTB operations through integrated management systems to improve efficiency, transparency, revenue management, and service delivery 2027 2029 900 200 350 350 15 Acquiring 100 New Battery Electric Buses for Sri Lanka Transport Board through a grant from China (Grant) To provide comfortable, efficient and dependable luxury bus service to commuters travelling on expressways & long distance routes,To reduce emission of harmful gases by replacing similar number of existing diesel buses 2027 2027 14700 (Grant) 32Previous page Next page Top
MPIP 2027-2029 · file page 37 printed page 33
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year 1 Colombo - Rathnapura - Pelmadulla Expressway The project involves the construction of the first phase of the Colombo- Ratnapura-Pelmadulla Expressway from Kahatuduwa to Ingiriya, aiming to improve connectivity, reduce travel time, and support economic development 2017 2025 60,695 6,786 1,500 27,000 40,000 45,000 2 Port Access Elevated Highway Project (GOSL - ADB) The elevated Port Access Expressway will strengthen regional connectivity, reduce traffic congestion, and provide an efficient connection between the Colombo Port and the expressway network. 2019 2027 77,969 60,486 12,500 10,750 550 3 Central Expressway Section 01 - Kadawatha to Meerigama (GOSL - China Exim Bank) To construct a modern expressway connecting Kadawatha to Meerigama (Section 01 of Central Expressway) 2020 2028 176,785 135,728 64,150 51,000 40,000 6,500 4 Central Expressway Section 02 - Meerigama to Kurunegala Construction of modern expressway from Mirigama to Kurunegala (Part 2 of Central Expressway) 2016 2021 144,600 350 200 5 Central Expressway Section 03 - Pothuhera to Galagedara Construction of modern expressway from Potuhera to Galagedara (Part 3 of Central Expressway). 2016 2029 214,866 64,583 30,500 28,000 30,000 30,000 6 Central Expressway Section 04 – Kurunegala to Dambulla Construction of modern expressway from Kurunegala to Dambulla (Part 4 of Central Expressway). 2016 2029 179,831 1,558 1,006 30,000 36,000 35,000 7 Baseline Road - Phase III Upgradation of Baseline Road and related land acquisition process 2007 2023 7,200 3,192 1,000 2,000 1,200 200 8 Rehabilitation of Peradeniya-Badulla - Chenkalady Road from Badulla to Chenkalady (GOSL - SFD) Rehabilitation of Ampara-Uhana road and improvements of Chenkalady junction. 2024 2026 8,361 2,846 610 1,000 9 Road Network Development Project (GOSL- SFD) Construction of Kurinchankerny bridge, construction of 1/4 Ambatale bridge and road section in Homagama 2013 2027 9,755 9,210 1,637 1,300 10 Road Network Development Project (GOSL- OPEC) Construction of Maharagama-Piliyandala road section. 2013 2025 7,035 5,989 440 650 11 Colombo District Road Development Project (GOSL-OFID) Reconstruction of Maharagama Piliyandala Road (stage 1 - 1.8 Km) 2013 2026 23,110 22,494 1,810 155 150 12 Western Province National Highways (GOSL-OFID) Reconstruction of bridge 1/9 on Orugudawatta - Ambatale Road 2017 2026 6,447 6,111 288 65 Rehabilitation of Bibila-Lunugala road and Climate Recilient Project at Beragala-wellawaya road 2022 2025 Climate Resilient / Slope Protection Project from Badulla to Bibile & Improvements of Kandehandiya - Randenigala Road 2025 2027 14 Marine Drive Extension up to Panadura Construct an alternative road for reduce traffic congestion in Colombo-Galle road 2014 2024 5,346 245 25 15 Gap Financing of the Road Development Authority's commitments To ensure the timely completion and sustainability of ongoing and planned road infrastructure projects by addressing financial shortfalls in the Road Development Authority's commitments 162,568 45,049 39,400 40,000 40,000 16 Land Acquisition for Completed and Ongoing Projects Timely land acquisition for completed and ongoing projects to minimize project delays and social disruptions 7,500 8,000 3,500 3,500 3,000 17 Surveys, Investigations and Feasibility Studies Supporting data-driven decision-making and optimizing infrastructure development planning through detailed surveys and feasibility studies 158 1,290 668 707 753 18 Rehabilitation of the A 17 Road Corridor from Rakwana to Suriyakanda (GOSL / OFID IV) Development of 18 km at A17 road corridor from Rakwana to Suriyakanda 2021 2025 7,600 6,619 2,872 300 19 Inclusive Connectivity & Development Project (GOSL/WB) To enhance inclusive, safe, and sustainable transport solutions by improving infrastructure, accessibility, and connectivity for all users, including vulnerable communities 2021 2027 57,318 30,918 13,390 13,720 1,500 No Objectives and Scope of the Project Sector: Highways Cumulative Expenditure (as at 31.12.2025) Project Period Total Estimated Cost (TEC) Name of the Project Revised Budget for 2026 Estimates for 2027 Projection for 2028 Projection for 2029 Ongoing Projects Ministry of Transport, Highways and Urban Development 1,700 13 Rehabilitation of Peradeniya-Badulla - Chenkalady Road from Badulla to Chenkalady (GOSL-OFID) Annual Annual Annual 500 7,590 3,963 1,130 33Previous page Next page Top
MPIP 2027-2029 · file page 38 printed page 34
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year No Objectives and Scope of the Project Cumulative Expenditure (as at 31.12.2025) Project Period Total Estimated Cost (TEC) Name of the Project Revised Budget for 2026 Estimates for 2027 Projection for 2028 Projection for 2029 20 Kandy Multimodal Transport Terminal Development Project (GOSL - WB) Developing the Kandy Sustainable Multimodal Transport Terminal to improve urban mobility, reduce congestion, and enhance the passenger experience 2021 2027 32,833 10,498 10,754 14,000 2,000 21 Integrated Road Investment Programme (I - Road) - Phase I (GOSL-ADB) Under the iRoad Programme, approximately 3,000 km of rural roads in the Southern, Sabaragamuwa, Central, North Western, North Central Provinces, and the Kalutara District of the Western Province are being improved/rehabilitated and maintained 2014 2024 135,900 98,766 500 500 22 Integrated Road Investment Programme (I - Road) - Phase II (GOSL-ADB) - Under the iRoad Programme, approximately 3,000 km of rural roads in the Southern, Sabaragamuwa, Central, North Central, and North Western Provinces, as well as the Kalutara District of the Western Province, are being improved, rehabilitated, and maintained 2018 2027 152,168 124,527 16,020 20,000 1,000 23 Development of Access Roads to Kandy Multimodal Transport Center To improve accessibility to the Kandy Multimodal Transport Hub by developing well-integrated, efficient access roads 2024 2025 1,500 379 700 325 24 Reconstruction of Damaged / Weak Bridges on National Highways Identifying the existing bridges in the national road network that need to be urgently renovated and carrying out renovation work. 1,465 4,000 4,000 4,500 25 Construction of Rural Bridges using old Bridge Component Identifying the existing bridges in the rural road network that need to be urgently renovated and carrying out the restoration work of those bridges using old bridge parts 373 2,500 2,000 2,200 26 Design and Construction of Flyovers in Kohuwala and Gatambe To ease traffic congestion and improve connectivity by designing and constructing flyovers in Kohuwala and Gatambe 2021 2028 20,561 8,101 7,600 3,000 1,150 27 Construction of Flyovers over the Railway Line at Uttharananda Mawatha and near the Slave Island Railway Station To reduce traffic congestion, improve connectivity, and enhance road safety by constructing flyovers over the railway line at Uttharananda Mawatha and near the Slave Island Railway Station. 2021 2025 9,133 12,790 330 200 28 Rehabilitation of Garagoda Bridge on Yatiyanthota – Magammana Road Giving quick access to the towns to the people of the area by renovating the Garagoda bridge on the Yatianthota-Magammana road 2024 2025 415 126 50 50 29 Construction of system interchange at Kadawatha and 500m road towards Meerigama in Central Expressway The project involves the construction of a system interchange at Kadawatha and a 500m connecting road towards Meerigama to improve connectivity between expressway corridors, enhance traffic flow, and reduce travel time on the national expressway network. 2025 2027 10,257 3,264 6,820 2,450 500 30 Construction of Petta and Aluthmawatha interchanges with ramps The improve traffic flow and connectivity by constructing the Pettah and Aluthmawatha interchanges with ramps while enhancing access to key transport routes. 2025 2026 15,000 3,000 2,700 1,200 31 Enhancement of National Traffic Database and Capacity Building (GOSL-KOICA) Improvement of National Traffic database and capacity building 2020 2021 1,200 370 50 20 10 32 Infrastructure and Road Safety Improving road infrastructure and safety features to minimize road accidents. 150 4,250 2,100 2,000 2,200 33 Traffic Management Making essential improvements to reduce traffic congestion on roads. 94 500 400 500 600 34 Improvement of Junctions (11) in Baseline Road Improving 11 major intersections along Baseline Road to enhance traffic efficiency, road safety, and connectivity while reducing traffic congestion 2026 2027 1,490 990 400 100 35 Conducting a Feasibility Study for the Construction of Connectivity from the Port Access Elevated Highway (PAEH) to the Marine Drive Extension (Phase 2) & Minimizing the Traffic Congestion in the Lotus Roundabout Area Assessing the feasibility of establishing a direct connection between the PAEH and the Marine Drive Extension while reducing congestion in the Lotus Roundabout area 2026 2027 330 105 175 50 Annual Annual Annual Annual 34Previous page Next page Top
MPIP 2027-2029 · file page 39 printed page 35
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year No Objectives and Scope of the Project Cumulative Expenditure (as at 31.12.2025) Project Period Total Estimated Cost (TEC) Name of the Project Revised Budget for 2026 Estimates for 2027 Projection for 2028 Projection for 2029 36 Improve People Accessibility and Traffic Circulation in Kandy Central Business District after Implementing the KMTT Improving accessibility and traffic circulation within the Kandy CBD following the implementation of the Kandy Multimodal Transport Terminal (KMTT) 2026 2029 4,402 412 1,950 1,000 37 Improving Bus Management and Operations in Kandy District to Optimize Benefits from the KMTT To strengthen bus management and operations in the Kandy District in order to maximize the efficiency and benefits of the Kandy Multimodal Transport Terminal (KMTT). 2026 2029 460 210 185 400 38 Rehabilitation and improvement of William Gopallawa Mawatha To construct William Gopallawa Mawatha (AB042) to enhance road connectivity, improve traffic flow, and provide safer and more efficient mobility for commuters. 2026 2028 950 241 400 39 Construction of Structures at Meda Ela – William Gopallawa Mawatha (AB042) To construct necessary structures along Meda Ela on William Gopallawa Mawatha (AB042) to improve road safety, ensure proper drainage, and enhance overall functionality of the roadway. 2026 2028 650 236 275 50 40 Improvement of Ambilipitiya – Panamure – Buluthota Road (B115) from Kolonna to Suriyakanda (29+000Km to 38+620Km) Improving road safety and connectivity through the upgrading of the Kolonna–Suriyakanda section of the Embilipitiya–Panamure–Buluthota Road (B115) 2026 2029 3,202 1,005 760 1,000 41 Widening and Improvement of Katugastota – Kurunegala- Puttalam-A010 Road from Katugastota to Galagedara (0+000 Km to 13+400 Km) Improving road safety and connectivity through the upgrading of the Katugastota–Galagedara (A010) Road 2026 2029 30,180 1,000 4,250 15,000 10,000 42 Road Maintenance and Improvement Implementing road maintenance and development activities to improve road safety, traffic efficiency, and connectivity. 26,091 32,000 31,200 34,000 38,000 43 Construction of Mahaiyawa Tunnel with Related Road Improvement Constructing the Mahaiyawa Tunnel to reduce traffic congestion and improve road safety, traffic efficiency, and connectivity 2026 2028 825 520 180 50 44 Widening and Improvements of Roads (Island wide) Carrying Out Essential and Emergency Repairs to the Road System Covering the Entire Island 5,934 22,000 22,000 25,000 27,000 45 Construction of Vadduvakal Bridge in Mullaitivu Constructing the Vadduvakal Bridge to improve connectivity, accessibility, and regional development 2025 2028 1,379 1,200 500 46 Rural Road Reawakening Programme - Maga Neguma Promoting livelihoods, economic growth, and employment opportunities through the improvement of rural connectivity and infrastructure. 17,500 15,500 15,500 47 Rural Road and Bridges Programme Improvement of rural roads and rural bridges islandwide. Annual 4,500 4,500 4,500 1 Construction of Flyover over the Railway line at the entrance to the Kandy Multimodal transport Terminal near Kandy Post Office Reducing traffic congestion around the Kandy Multimodal Transport Terminal (KMTT) while improving road safety and traffic efficiency 2027 2029 6,947 1,200 3,250 2,500 2 Construction of a Flyover Bridge; At the Railway Crossing at Alawwa on the Alawwa-Maharagama Road Improving traffic efficiency by reducing delays, congestion, and safety risks caused by railway gate closures 2027 2029 1,042 400 500 400 3 Construction of a Flyover Bridge; At the Railway Crossing on the Ambepussa- Kurunegala- Trincomalee Road (A06) near Muttettugala Railway Station Improving traffic efficiency by reducing delays, congestion, and safety risks caused by railway gate closures 2027 2029 1,043 300 500 200 4 Construction of a Bridge and a Causeway across Kokkilai Lagoon Establishing a direct road connection across the Kokkilai Lagoon to enhance connectivity between the Northern and Eastern Provinces while promoting trade and economic development 2027 2029 6,000 600 3,400 2,000 New Projects Annual Annual Annual 35Previous page Next page Top
MPIP 2027-2029 · file page 40 printed page 36
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year No Objectives and Scope of the Project Cumulative Expenditure (as at 31.12.2025) Project Period Total Estimated Cost (TEC) Name of the Project Revised Budget for 2026 Estimates for 2027 Projection for 2028 Projection for 2029 5 Development of Access Roads to the Angampitiya- Nawala Bridge to Establish Connectivity Between B120 (Etul Kotte- Mirihana-Kohuwala) and B470 (Welikada-Nawala) National Road Corridors Improving road connectivity, traffic efficiency, and travel convenience through the development of access roads to the Angampitiya–Nawala Bridge 2027 2029 2,000 500 1,695 6 Realignment and Improvement of Panadura-Nambapana- Rathnapura A008) from Ingiriya to Rathnapura (33+750km to 67+770km) Upgrading the Ingiriya–Ratnapura (A008) Road to reduce traffic congestion and improve travel time and road safety 2027 2030 22,200 2,800 13,000 6,500 7 Construction of Kiran Bridge Establishing a direct and reliable road connection across the Kiran Causeway to reduce travel distance and time, while improving access to the A5 highway 2027 2029 1,750 400 900 450 8 Construction of Pondukalchenai Bridge Establishing a stable and reliable road connection to improve community connectivity, accessibility, road safety, and regional economic development 2027 2028 650 200 450 9 Construction of Bridge on Punnaiyadi Ferry Road Acrosss Verugal River in Trincomalee District (Non -RDA) Constructing a bridge on the Punnaiyadi Ferry Road across the Verugal River in the Trincomalee District to improve connectivity, accessibility, and regional economic development 2027 2028 850 340 520 10 Project proposal for Integrated Connectivity Development Project for Central Expressway Section 01 (Kadawatha to Meerigama) (12 road sections) Reducing traffic congestion while enhancing regional connectivity, economic development, and freight transport efficiency 2027 2030 59,528 3,000 18,840 18,840 11 Integrated Connectivity Development Project for Central Expressway Section 03 (Pothuhera to Galagedara)10 Nos. Roads Enhancing connectivity between major commercial cities and expressways, reducing traffic congestion, and improving economic and transport efficiency 2027 2030 18,317 5,000 4,440 4,440 12 Integrated Connectivity Development Project for Central Expressway Section 04 (Kurunegala-Dambulla) 9 road sections Enhancing connectivity between major commercial cities and expressways, reducing traffic congestion, and improving economic and transport efficiency 2027 2030 31,260 500 10,250 10,250 36Previous page Next page Top
MPIP 2027-2029 · file page 41 printed page 37
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year Ports & Shipping 1 Port Access Elevated Highway Project (PAEH) (proposed workshop building complex for SLPA) Relocating the workshop with a new workshop building complex while demolishing the existing workshop in order to continue the PAEH Project. 2021 2024 2,039 1,731 275 2 Rehabilitation of Kankasanthurai Habour (GOSL-India) consultancy work, Rehabilitation of Existing Breakwater, Rehabilitation of existing peir No. 01 ,Construction of new peir No. 02 as a continuation to the peir No. 01,Construction of New commercial Berth, Provide infrastructure facilities 2020 2027 18,327 198 45 500 935 2,000 3 Detail Design for the Extension of Western Breakwater for West Container Terminal II – Colombo Port Extension Project Phase II (GOSL- ADB) To make SLPA fully ready for implementation of Colombo Port Expansion Project Phase II [CPEP Phase II)] including Extension of the Western breakwater including partial demolition of the existing breakwater, Logistics facility development next to the western breakwater and Development of Western Container Terminal -II. 2024 2026 1,830 91 900 700 4 Revision and Update of the National Port Master Plan along with the Strategic Land Use Master Plan To revise and update the National Port Master Plan, including the Strategic Land Use Master Plan, to ensure sustainable port development, optimize land use, and align with national economic, environmental, and strategic priorities. 2026 2027 300 125 175 5 Carrying out additional studies required for Colombo North Port Development Project To conduct additional studies for the Colombo North Port Development Project to support informed decision-making, optimize project design, and ensure efficient and sustainable port development. 2026 2027 300 96 180 25 6 Preparation Grant for the Sri Lanka Ports and Logistic Development Programme To support preparatory assessments, including comprehensive land use surveys, feasibility studies, technical designs, and land optimization planning for the Port of Colombo. Ultimately, this initial phase aims to establish the operational, environmental, and financial frameworks required to transform Colombo Port from a basic container transshipment hub into a world-class, integrated maritime logistics facility. 2026 2027 1,007 634 635 7 Procurement of Design, Development, Customization, Finance, Operation, Upgrading and Maintenance of Port Community System for Sri Lanka Ports Authority To procure the design, development, customization, financing, operation, upgrading, and maintenance of a Port Community System for the Sri Lanka Ports Authority to enhance efficiency, streamline port operations, and improve stakeholder coordination. 2026 2027 3,000 500 Aviation 8 Hingurakgoda International Airport Development Project (1st phase) To upgrade the airfield's physical infrastructure to support commercial aviation by extending the existing runway as a fully functional runway baseline 2024 2027 3,500 2,206 1,482 120 Ministry of Ports & Civil Aviation 9 Replacing Obsolete Vessel Traffic Management System (VTMS) and Modernization of Marine Aids to Navigation System at the Port of Colombo To enhance maritime safety, navigational reliability, and operational efficiency at the Port of Colombo by completely replacing its aging Vessel Traffic Management System (VTMS) and modernizing its marine aids to navigation infrastructure 2027 2028 3,579 575 3,005 Projection for 2028 Projection for 2029 New Projects Sector: Ports and Civil Aviation Cumulative Expenditure (as at 31.12.2025) Project Period Total Estimated Cost (TEC) Name of the Project Ongoing Projects Ministry of Ports and Civil Aviation No Objectives and Scope of the Project Revised Budget for 2026 Estimates for 2027 37Previous page Next page Top
MPIP 2027-2029 · file page 42 printed page 38
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year 1 Lower Malwathu Oya Multisector Development Project Irrigation of 1,052 acres of new lands (Paddy and other field crops) and 12,420 acres cultivated in the vicinity of Yoda Wewa and Agathamurippu tanks, providing 27 MCM of water for domestic and drinking water facilities in Vavuniya, Anuradhapura and Mannar districts, transfer 4.68 GWh of electricity annually to the National Grid. 2019 2030 47,180 2,209 4,610 7,500 9,000 10,000 2 Integrated Watershed and Water Resources Management Project (World Bank) Improve watershed and water resources planning and enhance the functionality of water resources infrastructure. 2021 2027 20,308 8,603 3,600 5,550 3 Strengthening Climate Resilience of Subsistence Farmers and Agriculture Plantation Communities in Vulnerable River Basins, Watershed Area and Downstream of the Knukles Mountain Range Catchment of Sri Lanka (Green Climate Fund) Strengthening climate resilience of subsistence farmers and Agriculture Plantation Communities in vulnerable river basins, watersheds area and downstream of the Knuckles Mountain Range Catchment of Sri Lanka. 2023 2029 15,672 931 3250 2,700 900 850 4 Elle Wewa Reservoir Enhanced living standard of people living in the area by providing water for both agriculture and domestic purpose, ensure water security for irrigated agriculture during dry season. 2021 2026 2,950 801 690 500 5 Mundeni aru River Basin Development (Rugam-Kithul Reservoir) Feasibility and initial Project Work- The project is for providing irrigation facilities for 6,500 ha new and existing lands among 10,000 farmer families, supply of drinking water for 31,000 families in Batticaloa and Ampara district, flood control in the downstream area, Increase the inland fisheries by 800 MT per year in both reservoirs. 2022 2028 24,141 383.5 50 10 6 Uma Oya Down Stream Development Project Delivery of 150 MCM water received annually from the upper watershed of Uma Oya, throughout the cultivation area of 10,000 acres and newly identified cultivation area of 11,000 acres in Kirindi Oya basin through main tanks and rural tanks. 2013 2026 22,107 18,632 2,175 750 7 Mahweli Water Security Investment Programme (GOSL/ADB) Completion of the remaining packages connected with the North Central Province Canal project, up to Yakalla and Mahakanadarawa including a component with commercial agriculture Development. 2026 2032 149,000 22,300 19,500 38,000 31,000 8 Maduru Oya Right Bank Development Project Development of 12,462 ha of lands under the Maduru Oya Right Bank in Ampara and Batticaloa Districts, with the construction of 83 km long main and branch canal system. 2026 2032 42,979 300 1,500 4,000 10,000 9 Kivul Oya Reservoir Project Construction of a reservoir - Kivul Oya (a tributary of Ma Oya) in Vavunia District to provide irrigation for 1,700 ha of new lands and enhance 700 ha of existing lands, while supplying drinking water for uplifting the livelihoods. 2026 2031 23,546 200 2,000 7,400 4,600 10 Essential Rehabilitation in Selected Major Irrigation Scheme Stabilize and increase agricultural production in selected major/medium irrigation schemes by rehabilitating the essential components of the downstream canal system. 6,500 6,000 7,000 8,000 11 Gravity Irrigation Works Operation and maintenance works of all irrigation schemes under the purview of Department of Irrigation. 2,200 2,665 2,800 3,000 12 Rehabilitation of Major and Medium Irrigation Schemes Including Emergency Infrastructure Increase agricultural productivity and water efficiency by rehabilitation of major and medium irrigation schemes. 1,500 500 500 500 Sector: Irrigation Cumulative Expenditure (as at 31.12.2025) Project Period Total Estimated Cost (TEC) Name of the Project Revised Budget for 2026 Estimates for 2027 Projection for 2028 Projection for 2029 No Objectives and Scope of the Project Annual Annual Annual Ongoing Projects Ministry of Ministry of Agriculture, Livestock, Lands and Irrigation 38Previous page Next page Top
MPIP 2027-2029 · file page 43 printed page 39
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year Cumulative Expenditure (as at 31.12.2025) Project Period Total Estimated Cost (TEC) Name of the Project Revised Budget for 2026 Estimates for 2027 Projection for 2028 Projection for 2029 No Objectives and Scope of the Project 13 River Basin Development and Management Establish the river profile to secure livelihoods, maintain river bank by preventing erosion and maintain water quality by minimizing contamination to rivers. 700 760 1,000 1,000 14 Agriculture and Livestock Programme Implemented by Sri Lanka Mahaweli Authority Uplift living standards of farmer community through enhancing agricultural productivity 1,400 1,400 1,500 1,600 15 Mahaweli Authority of Sri Lanka Operation and maintenance works of all irrigation schemes under the purview of Mahaweli Authority of Sri Lanka. 4,406 3,800 4,000 4,500 1 Completion of Spillover Activities of the Climate Resilience Multi- Phase Programmatic Approach -CREsMPA The project aims to strengthen Sri Lanka’s climate resilience through modernization of hydro-meteorological forecasting, flood forecasting, landslide forecasting, multi-hazard early warning systems, decision support systems, LiDAR surveys, flood forecasting models and emergency operation centers 2,027 2027 3,054 3,054 2 Transforming Irrigation system for improved food security (ADB Grant) Project seeks to establish four modern Pipe Distribution Networks for irrigation in slected 4 locations in Meegas Ara, Ridi Bendi Ela, Magalla and the Inginimitioya on a pilot basis 2,027 2031 1,496 600 266 266 3 Wari Mahima Ape Urumaya Programme Nationwide initiative to rehabilitate, restore and climate-proof village irrigation schemes, village tank cascade systems, anicuts and associated agricultural infrastructure across 25 districts. 2,027 2029 9,250 2,500 3,000 3,700 4 Assessment of Mahaweli River Morphology Changes, Flood Risk and Mitigation Measures Identifying the changes occurred in the Mahaweli River, main reasons for the changes and identifying the affected areas by flooding and river bank erosion to provide practical and sustainable solutions to reduce flooding and to control river bank erosion 2027 2030 350 100 108 142 5 Gampaha City Flood Protection Project The project consists of the construction of a Northern Flood Bund across Minuwangoda Road with associated pump houses, a North-East Flood Wall across Wijayarama Road with associated pump houses, increasing the conveyance capacity of Kundivila Canal, and improving the conveyance capacity of culverts along the Gampaha–Minuwangoda Road. 2027 2031 5,393 50 2,000 3,000 6 Modernization of the Rajanganaya Lift Irrigation Scheme and Development of New Lift Irrigation Schemes It is expected to rehabilitate the aging lift irrigation infrastructure established in 1973 and address the existing deficiencies that have constrained agricultural production and the effective utilization of agricultural lands. 2027 2029 2,927 300 1,000 1,500 7 Mahakithula Inlet Tunnel Project Project involves the construction of the Mahakithula Inlet tunnel, which compriss a 580m long New Austrian Tunnelling method, a 465 m long twin rectangular cut and cover canal and a 120 m long open canal with a total length of approxiamately 1,165m. 2027 2029 3,525 600 1,000 1,800 8 Remaining works related to the project for construction of feeder canal from Siyabalangamuwa Oya to Mahagalagamuwa Tank Completion of the remaining packages connected with the North Central Province Canal project, up to Yakalla and Mahakanadarawa including a component with commercial agriculture Development. 2027 2028 469 156 300 9 Plot Consolidation of Paddy Lands by Farmers with Government Co- financing (50-50) Through a 50% government contribution for plot consolidation and land leveling, the project will enable farmers to adopt modern cultivation practices, increase land productivity and crop yields by approximately 20%, reduce cultivation costs, improve water-use efficiency, and strengthen national food security 2027 2029 500 100 200 200 Annual Annual Annual New Projects 39Previous page Next page Top
MPIP 2027-2029 · file page 44 printed page 40
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year 1 Accounting for the foreign loan disbursement & Grant of CEB - National Transmission Distribution Network Development & Efficiency Improvement Project (NTDND & EIP) All Packages This Project is to develop and enhance National Transmission and Distribution Network by improving and upgrading transmission lines, substations, and distribution lines for improving reliable and sustainable power supply and energy efficiency, thereby contributing to economic development in the country. 2019 2030 41,590 40,487 5,712 4,900 6,900 4,000 2 Kerawalapitiya - Port 2nd transmission line project Supply, delivery, installation, testing and commissioning of 15.6km of 220kV underground cable from Kerawalapitiya SS to Colombo 2026 2028 14,985 5,400 4,200 3,000 6,000 3 New Habarana kappalthurai transmission Development Project - CEATP 1 (AIIB) Facilitate power evacuation from renewable energy zones identified in the Eastern part of the country and enhance transmission capacity and reliability in the Eastern Province - Construction of 77km long. 220kV double circuit transmission line from New Habarana Switching Station to Kappalthurai Grid substation, augmentation of New Habarana 220/132 kV Switching Station and Modification of Kappalthurai 220/33 kV Grid Sub Station. 2026 2029 16,378 256 1,984 3,300 3,500 6,500 4 Sampur Kappalthurai Transmission Development Project (SKTDP) Enhance power evacuation capacity to enable integration of solar power from northeastern Sri Lanka into the national grid and enhance transmission capacity and reliability in the Eastern Province - Construction of Sampur-Kappalthurai 38 km long 220kV double circuit transmission line, construction of Sampur Solar Collector GSS III and augmentation of Kappalthurai 220/33 kV Grid Sub Station 2026 2028 11,077 25 1,500 3,100 3,500 5,000 5 Installation of 75 MVA Synchronous Condenser Unit at New Habarana Maintain system stability from voltage collapse and frequency support during contingency conditions by installing a 75 MVA Synchronous Condenser Unit at the existing New Habarana Grid substation 2026 2029 ** 8,252 (USD 25 Mn.) 53 1,000 4,400 4,000 6 Rooftop Solar Aggregation and Virtual Net Metering Project Empower vulnerable small enterprises through renewable energy–based virtual net metering by installing solar power systems on available rooftop areas of government buildings 2026 2029 ** 5,611 (USD 17 Mn.) 1,000 1,000 3,200 3,400 7 Installation of STATCOM at Padukka 220kV GSS Maintain system stability from voltage collapse during contingency conditions by installaing a STATCOM at Padukka 220kV Grid Substation 2027 2029 ** 4,291 (USD 13 Mn.) 2 390 1,500 2,000 8 Development of Northern 400kV Transmission Network To conduct the preliminery works of the Development of the transmission network backbone to facilitate the integration of variable renewable energy sources to be commissioned in the Northern part of Sri Lanka into the national grid and increase the transmission capacity of the existing network 2026 2027 500 2 500 1,500 3,800 Sector: Power & Energy Cumulative Expenditure (as at 31.12.2025) Project Period Total Estimated Cost (TEC) Name of the Project Ongoing Projects Ministry of Energy No Objectives and Scope of the Project Revised Budget for 2026 Estimates for 2027 Projection for 2028 Projection for 2029 40Previous page Next page Top
MPIP 2027-2029 · file page 45 printed page 41
Major Public Investment Project 2027-2029
Started/
Expected
Starting Year
Expected
Completion Year
Cumulative
Expenditure (as at
31.12.2025)
Project Period
Total Estimated
Cost (TEC)
Name of the Project
No
Objectives and Scope of the Project
Revised Budget for
2026
Estimates for 2027
Projection for 2028
Projection for 2029
9
Obtaining Grant Support for Renewable Energy Admission and
Energy Efficiency Enhancement Project
Introduce High Temperature Low Sag (HTLS) conductors to the electricity
distribution networks and to introduce Battery Energy Storage Systems (BESS)
at Lanka Electricity Company (Pvt) Ltd (LECO) distribution transformers to
enable virtual power plant functionality and enhance solar PV
integration
2026
2029
** 1,650
(USD 5
Mn.)
600
50
1,000
1,500
10 Partnership for Energy Efficiency Buildings (PEEB) Project
Support development, capacity building, knowledge management and
strengthening of public policies for energy effciency in Sri Lankan building sector
2026
2028
316
100
200
220
1
Project Preparatory Activities for selected Transmission
Development Projects through Grant Facility for Project
Preparation from the World Bank
Grant Facility for Project Preparation on Hambantota-Monaragala 220 kV
transmission line, Norochcholai-Wariyapola 220kV transmission line with
Wariyapola GSS, New Habarana-Kirindiwela 400kV transmission line,
Kalmunai 132kV/33kV GSS
2027
2028
504
300
650
400
2
Establishment of Four Distribution conrol cenrtres (DCCS)
with Advanced Distribution Management System (ADMS)
supported by SCADA and Advanced Metering Insfrastructure
(AMI) for the Four Distribution Divisions
Upgrade, modernize and digitalize Sri Lanka’s power distribution system to
enable higher renewable energy integration, supporting the national target of
70% renewables by 2030 and beyond.
Introduce
advanced technology for distribution system efficiency and reliability
improvement in Sri Lanka.
2027
2029
8,811
5,130
6,100
3,000
** USD Rate as at 28.10.2026 - 333.07 Sri Lankan Rupee
New Projects
41Previous page Next page TopMPIP 2027-2029 · file page 46 printed page 42
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year 1 Water Supply and Sanitation Improvement Project (WASSIP) (GOSL-WB)* Increase access to potable pipe-borne water and sanitation facilities in 11 Districts by constructing water supply schemes, rehabilitation of small scale WSSs, Sewerage Treatment Plants and provision of sanitation units in urban, rural and plantation areas. 2015 2026 48,200 50,814 1,660 2 Jaffna Kilinochchi Water Supply and Sanitation Project (GOSL/ADB)* Provide safe drinking water facilities to people in Jaffna District and some parts in Kilinochchi District through a desalination plant to improve health and living standards of the people in the area. 2011 2027 35,881 39,979 5,090 4,053 3 Ambathale Water Supply System Improvement & Energy Saving Project (GOSL/France)*, ** Enhance the efficiency and reliability of the water supply to Colombo and its suburbs by upgrading and replacing the deteriorated pipe network and equipment in Ambatale water supply system (Project is domestically funded on re-imbursement basis). 2016 2026 13,000 14,157 3,590 200 4 Greater Ruwanwella Water Supply Project (GOSL/Korea)* Provide safe drinking water to people living in Bulathkohupitiya, Ruwanwella, Yatiyanthota DS Divisions by constructing a water treatment plant and water supply connections. (After 2026 project finance on domestically). 2019 2029 6,291 5,766 1,230 875 635 220 5 Kandy North & Pathadumbara Integrated Water Supply Project (GOSL/China)** Improve the water treatment plant to provide safe and adequate drinking water facilities to people living in Kandy Municipal Council, Kandy Four Gravates, Pathadumbara, Harispattuwa, Pujapitiya and Akurana Divisional Secretariats in Kandy District. 2019 2027 51,324 34,051 7,500 3,000 1,500 6 Anuradhapura North Water Supply Project Phase II (GOSL/JICA) Provide safe drinking water and increase water supply coverage by constructing a water supply system in Padaviya, Horowpothana, Kahatagasdigiliya and Kebithigollewa DSDs in Anuradhapura District where the people depend on unsafe ground water which has high tendency to cause CKD. 2018 2031 31,598 510 5,390 6,662 7,502 7,635 7 Kalu Ganga Water Supply Expansion Project (1) (GOSL/JICA) Expand Kalu ganga water supply facilities by re-structuring water distribution network to increase water supply to cover 14 DS divisions in Colombo and Kalutara Districts. 2020 2029 55,338 1,005 460 5,595 8,900 7,600 8 Eppawala, Giribawa, Rajanganaya & Nochchiyagama Integrated Water Supply Project - Stage I Provide safe pipe-borne water to around 154,058 beneficiaries in Eppawala, Giribawa, Rajanaganaya & Nochchiyagama areas covering together with commercial demand for industries in Thalawa, Ipalogama, Galnewa, Rajanganaya, Nochchiyagama, Giribawa, Galgamuwa DSDs (110 GNDs) in Anuradhapura & Kurunegala Districts. 2025 2029 32,211 1,000 4,500 5,110 2,211 9 Deduru Oya Water Supply Project - Phase II** Provide safe drinking water to people living in 112 GNDs in Polpithigama & Mahawa DS Divisions in Kurunegala District who are vulnerable to CKDu. 2026 2027 5,614 10 60 2,797 2,747 10 Climate Resilient Sustainable Water Supply and Sanitation Improvement Project (GOSL/ADB) Provide more reliable and improved water supply and sanitation services in urban areas with high priority in service improvement. 2026 2030 56,999 500 5,000 6,770 12,856 11 Anamaduwa Integrated Water Supply Project Provide safe drinking water to Anamaduwa, Nawagaththegama, Part of Mahakumbukkadawala, Puttlam & Mundal, Kotawehera and Part of Galgamuwa DS Division with a 11,000 m3/day WTP, 12,500 m3/day Intake and 04 water towers. 2012 2028 8,625 6,031 780 800 841 12 Kandy City Waste Water Management Project (GOSL/JICA)*, ** Improve sanitary conditions of the people in high density areas in Kandy city by providing a centralized waste water management system including treatment plant, sewer network and sludge treatment facilities. 2010 2027 22,588 21,628 2,110 1,200 857 Sector: Water Supply and Sanitation Cumulative Expenditure (as at 31.12.2025) Project Period Total Estimated Cost (TEC) Name of the Project Estimates for 2027 Projection for 2028 Projection for 2029 Revised Budget for 2026 Ongoing Projects Ministry of Housing, Construction and Water Supply No Objectives and Scope of the Project 42Previous page Next page Top
MPIP 2027-2029 · file page 47 printed page 43
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year Cumulative Expenditure (as at 31.12.2025) Project Period Total Estimated Cost (TEC) Name of the Project Estimates for 2027 Projection for 2028 Projection for 2029 Revised Budget for 2026 No Objectives and Scope of the Project 13 Phase II Stage I of Ratmalana/Moratuwa Waste Water Disposal Project (Expansion of Pipe Sewer Coverage to Moratuwa & Ekala Areas) (GOSL/AFD)*, ** Extend the pipe sewer coverage in Moratuwa & Ratmalana Areas. Project is domestically funded on re-imbursement basis. 2016 2026 16,073 3,182 2,135 1,000 350 14 Waste Water Management System for Ella Township Develop a centralized waste water management system to address sanitation needs in Ella township in Badulla District covering 03 GNDs in Ella DSD. 2026 2029 4,819 300 741 1,860 1,000 15 Gampaha, Attanagalla & Minuwangoda Integrated Water Supply Scheme (GOSL/CHINA)*, ** Provide pipe-borne water connection to uncovered areas and improve service level of existing customers in Gampaha, Attanagalla, Minuwangoda DS Divisions and part of Meerigama, Mahara DS Divisions. 2017 2026 33,060 41,148 45 30 16 Capacity Enhancement and Distribution Expansion Project (CEDE) (Completion of ongoing projects with more than 25% physical progress, in accordance with the Cabinet directive)* Enhance the capacities of existing water supply schemes and expansion of the distribution network island wide. 2020 2029 43,700 30,887 8,500 10,000 10,318 11,048 17 Water Reclamation-connection enhancement project stage I (A7-CEP) Dehiwala Mt.Lavania Sewerage Scheme Improve sewer connectivity in the Dehiwala/Mt. Lavinia area by providing 1,500 new sewer connections, extending sewer networks, and upgrading pumping facilities and transmission infrastructure. 2024 2029 2,477 80 500 800 18 Upgrading Pelmadulla Water Treatment Plant Capacity 5000m3 day and 21.5 km Transmition & Distribution Pipelines(DH/HDPE) Upgrade the Pelmadulla Water Treatment Plant to 5,000 m³/day capacity and improve 21.5 km of transmission and distribution pipelines to provide safe and reliable drinking water to underserved areas. 2024 2029 2,904 150 300 700 19 Bandarawela Water Supply Project Phase I & II Improve access to safe and reliable drinking water in Bandarawela, Haputhale, Welimada, Ella, and Hali-Ela through a 10,000 m³/day water treatment plant, transmission and distribution pipelines, and 9,000 new water connections. 2022 2029 9,350 1,614 175 250 500 20 Distribution Expansion of Mathugama/Agalawatta Area in Kalutara District Expand and improve water distribution networks in Mathugama, Agalawatta, and surrounding areas to enhance service reliability and provide safe drinking water to underserved communities. 2023 2029 1,783 285 75 500 750 21 Augmentation of Oddusudan & Nedunkerny WSS (Stage 1&2) Augment the Oddusuddan and Nedunkerny Water Supply Scheme by developing a 2,000 m³/day water treatment plant and distribution infrastructure to provide safe drinking water to around 16,000 beneficiaries through 4,000 connections. 2023 2029 1,948 59 65 200 500 22 Proposed Pipeline Extension in Walapane WSS (Keerthibandarapura) and Dambulla WSS** Extend the Walapane water supply network to Keerthibandarapura and improve transmission capacity under the Dambulla Water Supply Scheme to enhance reliable drinking water supply in the beneficiary areas. 2021 2027 788 550 100 138 23 Pipeline Extension to Serankada in Padiyathalawa Extend the water supply network to Serankada, Aranthalawa, and surrounding areas through 13 km of pipelines and associated storage and pumping facilities to provide safe drinking water to approximately 2,500 families. 2021 2029 820 10 20 500 200 24 Implementation of Thriukovil Water Supply Scheme Improve the Thirukovil and Pottuvil Water Supply Schemes through intake upgrades, a primary treatment plant, and enhanced storage facilities to provide reliable drinking water to new and existing consumers. 2022 2029 563 22 12 300 200 25 Improvement to Minneriya WTP & WSS Upgrade the Minneriya Water Treatment Plant to increase capacity from 9,000 to 13,500 m³/day and improve transmission infrastructure to enhance water supply reliability and provide 5,625 new connections. 2021 2029 911 48 30 200 633 26 Improvement and Distribution Expansion Project of Kataragama WSS (Short Term) Augment the Kataragama Water Supply Scheme by upgrading treatment and intake facilities and expanding the distribution network to improve water supply reliability and provide approximately 9,800 new connections. 2023 2031 5,466 140 200 400 43Previous page Next page Top
MPIP 2027-2029 · file page 48 printed page 44
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year Cumulative Expenditure (as at 31.12.2025) Project Period Total Estimated Cost (TEC) Name of the Project Estimates for 2027 Projection for 2028 Projection for 2029 Revised Budget for 2026 No Objectives and Scope of the Project 27 Improvement of Awissawella Water Treatment Plant Upgrade the Awissawella Water Treatment Plant from 3,000 to 6,000 m³/day and construct a new intake facility to ensure safe, reliable, and uninterrupted drinking water supply. 2024 2029 1,295 45 700 550 28 Capacity Improvement and Distribution Expansion Project of Baddegama Water Supply Scheme Improve the Baddegama Water Supply Scheme through a 10,000 m³/day package treatment plant, reservoir construction, pipeline upgrades, and distribution expansion to provide 4,500 new connections and improve services for existing consumers. 2021 2031 3,230 647 65 400 600 29 Improvement of Omanthai WSS** Improve the Omanthai Water Supply Scheme through transmission and distribution network upgrades, a 450 m³ elevated water tower, and pumping facilities to enhance access to safe and reliable drinking water. 2023 2027 876 23 35 800 30 Distribution Expansion in Polgahawela,Pothuhera,Alawwa Integrated Water Supply Project Expand approximately 417 km of distribution pipelines in the Polgahawela–Pothuhera–Alawwa areas to increase water supply coverage and fully utilize the existing 22,000 m³/day water treatment plant capacity. 2021 2028 2,248 174 95 1,500 31 Naththandiya, Wennappuwa, Kakkapalliya, Mawathagama WSS, Lakeside Pump house in Kurunegala WSS Improve multiple water supply schemes in Kurunegala and Puttalam districts through treatment plant construction and upgrades, pipeline expansion, and improved pumping and sludge management facilities to ensure safe and reliable drinking water supply. 2021 2031 4,471 536 95 1,300 1,000 32 Wellawaya Water Supply Project Stage II Phase II Augment the Wellawaya Water Supply Scheme through a 5,000 m³/day water treatment plant, storage facilities, and pipeline improvements to provide 1,470 new connections and improve services for existing consumers. 2022 2029 2,325 123 70 300 500 33 Improvement of Dehiattakandiya & Lihiniyagama WSS Improve the Dehiattakandiya and Lihiniyagama Water Supply Schemes through intake upgrades, improved pumping facilities, and infrastructure enhancements to ensure reliable drinking water supply and provide approximately 2,300 new connections. 2021 2029 900 6 20 400 474 34 Distribution Improvements in Demodara WSS (Extension to Damanwara,Sirimalgama Area of Badulla WSS and Ella Ballaketuwa,Dowa Zone After Improving the Demodara Distribution System) Improve the Demodara Water Supply Scheme through treatment capacity augmentation, replacement of 68 km of aging pipelines, and enhanced storage and distribution facilities to ensure safe and reliable drinking water supply. 2021 2030 4,500 890 175 500 1,300 35 Augmentation of Delft Water Supply Scheme Augment the Delft Water Supply Scheme by installing a 300 m³/day seawater reverse osmosis plant and developing intake, storage, and transmission facilities to provide safe and reliable drinking water to approximately 3,800 beneficiaries. 2023 2028 868 30 700 36 Upgrading Muthur Water Treatment Plant (WTP) Capacity From 8,500 cum/day to 17,000 cum/day Including Intake Improvement at Neelapola Upgrade the Muthur Water Treatment Plant capacity from 8,500 to 17,000 m³/day and improve the Neelapola intake facilities to enhance water supply reliability and provide approximately 20,400 new connections. 2024 2029 2,868 50 500 800 37 Zoning Arrangement at Water Supply Schemes in Ampara & Akkaraipattu Region Improve water supply efficiency in the Ampara and Akkaraipattu regions through hydraulic zoning, upgraded pumping and monitoring systems, and rehabilitation of transmission mains to reduce water losses and enhance service reliability. 2021 2029 1,539 261 25 700 500 38 Increase Service Coverage in Unnichchai and Surrounding Areas Expand safe drinking water coverage in Unnichchai and surrounding areas through a 1,000 m³/day package water treatment plant, pumping facilities, and distribution network expansion. 2022 2028 1,214 39 18 600 500 39 Improvement of Bangalawadiya WTP at Sammanthurai Rehabilitate and modernize the Bangalawadiya Water Treatment Plant through equipment replacement, automation, and pumping system upgrades to ensure reliable drinking water supply to approximately 32,000 consumers. 2022 2029 342 88 5 160 89 44Previous page Next page Top
MPIP 2027-2029 · file page 49 printed page 45
Major Public Investment Project 2027-2029
Started/
Expected
Starting Year
Expected
Completion
Year
Cumulative
Expenditure (as at
31.12.2025)
Project Period
Total Estimated
Cost (TEC)
Name of the Project
Estimates for 2027
Projection for
2028
Projection for
2029
Revised Budget
for 2026
No
Objectives and Scope of the Project
40 Augmentation of Thissawewa WTP
Augment the Thissawewa Water Treatment Plant by 4,500 m³/day and improve treatment,
storage, and distribution infrastructure to enhance water supply reliability and provide
approximately 3,820 new connections in the Anuradhapura Sacred City area.
2021
2029
3,180
387
70
500
1,300
41 Ground Water Source Development in Mannar &
Kilinochchi**
Develop sustainable groundwater sources in Mannar and Kilinochchi through production
wells, pumping and chlorination facilities, and transmission pipelines to improve safe
drinking water supply reliability.
2021
2028
1,435
197
45
500
693
42 Capacity Improvement and Distribution Expansion
Project of Lunugamwehera Water Supply Scheme
Upgrade the Lunugamwehera Water Supply Scheme by increasing treatment capacity from
12,000 to 18,000 m³/day and expanding transmission and distribution networks to improve
service reliability and provide approximately 3,900 new connections.
2020
2029
1,754
171
75
500
1,000
43 Greater Galle Integrated Water Supply Project -
Urgent Improvement
Augment the Hapugala Water Treatment Plant capacity from 7,500 to 10,000 m³/day
through additional treatment facilities and network improvements to enhance water quality
and supply reliability in the Greater Galle area.
2021
2028
697
400
165
132
44 "Praja Jala Abhiman" Water Supply Scheme
(Completion of ongoing projects)*, **
Develop existing community water Supply Schemes in island wide to increase pipe-borne
water coverage in community water supply.
2021
2027
12,025
2,730
2,000
2,000
2,800
5,200
45 Ditwah Recovery Projects
Restore and strengthen cyclone-damaged water supply infrastructure to ensure safe, reliable,
and climate-resilient drinking water services in affected areas of Sri Lanka.
2026
2028
16,199
3,895
1
Greater Colombo Waste Water Management
Project - (GOSL/ADB)*, **
Rehabilitation of existing 08 pumping stations in Maligawatta, Thimbirigasyaya, Borella,
Modara, Fort, Wanathamulla, Bambalapitiya and SlaveIsland.
2010
2026
7,000
8,717
1,000
832
50
2
Greater Colombo Water and Waste Water
Management Improvement Programme - Tranche 3
(GOSL/EIB)*, **
Rehabilitate and expand the wastewater system in the south catchment area of Colombo
city, construction of a secondary wastewater treatment plant in south catchment area of the
colombo city and strengthening the institutional structure and capacity of service provider.
2024
2027
15,000
2,580
5,700
6,000
50
3
Greater Colombo Water and Waste Water
Improvement Investment Programme -Tranche 3
(GOSL/ ADB)*, **
Upgrade sewerage infrastructure, strengthen the institutional and operational capacity.
2018
2027
7,000
5,449
2,425
2,750
50
1
Upgrading the Water Supply Facilities in Kotte
Upgrade and zone the water distribution network and introduce DMAs to improve pressure,
service reliability and NRW management.
2027
2030
2,428
200
500
1,000
2
Construction of an Updtream Impounding
reservoirs across Maha Oya Yatimahana, Kegalle
District for Securing Drinking Water Supply
Construct an upstream impounding reservoir to secure year-round water availability for
downstream drinking water supply schemes.
2027
2031
22,158
300
200
200
3
Valachchenai Water Supply Project Phase 1
Develop a water supply system covering residential, commercial and tourism areas in
Valachchenai and Pasikuda.
2027
2029
9,836
300
500
800
4
Eheliyagoda Water Supply Project-Capacity
14,000m3/day
Construct a 14,000 m³/day water treatment plant with storage and associated water supply
infrastructure.
2027
2029
4,475
1,600
2,000
900
5
Greater Kilinochchi Water Supply Project
Develop water supply infrastructure including a new intake, treatment plant, towers, ground
reservoirs transmission systems and distribution networks.
2027
2034
41,140
1,800
3,000
3,000
6
Greater Galle Water Supply Project Stage III -
Phase I
Construct a 30,000 m³/day water treatment plant with associated intake, transmission,
storage and distribution infrastructure.
2027
2030
37,502
3,000
2,476
8,835
Ministry of Public Administration, Provincial Councils and Local Government
New Projects
Ministry of Housing, Construction and Water Supply
45Previous page Next page TopMPIP 2027-2029 · file page 50 printed page 46
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year Cumulative Expenditure (as at 31.12.2025) Project Period Total Estimated Cost (TEC) Name of the Project Estimates for 2027 Projection for 2028 Projection for 2029 Revised Budget for 2026 No Objectives and Scope of the Project 7 Nainativu Water Supply Project Develop a 200 m³/day seawater reverse osmosis water supply system with associated abstraction, transmission and pumping facilities. 2027 2028 397 50 347 8 Kundasale Haragama Water Supply Project Develop a 50,000 m³/day water treatment plant, intake, service reservoirs, distribution system with transmission mains, pumping facilities and SCADA. 2027 2031 34,368 1,800 3,000 3,000 9 Haldumulla Beragala Water Supply Project Construct a 3,000 m³/day water treatment plant with transmission, distribution and storage facilities. 2027 2029 3,262 700 1,000 1,050 10 Infilling of Kilinochchi, Mullaitivu,Vavuniya, Mannar, Jaffna Districts Extend and infill existing water supply networks and provide new household connections in unserved and underserved areas. 2027 2028 9,843 1,015 5,000 11 Bingiriya, Udubaddawa & Makadura Pannala, Kuliyapitiya IWSP (Phase 1) (Feasibility Study) Undertake a feasibility study for a water supply system including a 40,000 m³/day treatment plant, transmission, storage structures and distribution networks. 2027 2027 284 250 12 Non-revenue water reduction and Management Project for the Galle Water Supply Scheme (TA Grant) Rehabilitate the Galle water distribution network and reduce NRW through network improvements and PPP-based NRW management. 2027 2031 2,828 150 ** The Project Duration to be revised * The Total Estimated Cost (TEC) to be revised Projects Nos. 17 to 43 in the list were suspended in accordance with the Cabinet decision dated 22.09.2025, and their implementation is scheduled to resume in 2027. 46Previous page Next page Top
MPIP 2027-2029 · file page 51 printed page 47
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year 1 "Thamangema Thanak - Lassana Jeewithayak" Housing Grant Programme for Poor and Low Income Homeless Families. Construct 70,110 houses over a period of 05 years covering the entire island 2026 2030 114,281 10,200 13,000 14,020 15,000 2 Renovation of Housing Schemes Rehabilitate building and common amenities of low income and public servants housing schemes constructed by National Housing Development Authority 500 280 3 Housing Project (600 houses) in Southern Province - 2017 Construct 600 Houses in Southern Province 2017 2026 300 237 343 119 4 Housing Project Phase II (600 houses) in Southern Province - 2019 Construct 600 Houses in Southern Province 2019 2026 380 156 431 190 5 Sanitary Facilities for the Persons with Differently Abled Provide sanitory facilities for 500 differently abled people in Western province 2026 2026 500 500 6 Renovation of Buildings, Common Amenities and the Sewerage Systems of Old Housing Schemes Constructed by NHDA for Low Income Families Redevelope buildings, commonamenities, and sewerage systems of 31 old housing schemes constructed by National Housing Development Authority 2026 2026 681 681 7 Construction of 300 Low - cost Housing Units in Mannar Construct transit housing units 2018 2026 425 237 285 100 8 New Multi - Sector Emergency Project - AIIB (Housing Reconstruction) Provide housing assistance for "Cyclone Ditwah" affected families. 2026 2028 35,650 9 Restructuring of Ongoing Support to Colombo Urban Regeneration Project - AIIB Provide housing assistance for "Cyclone Ditwah" affected families. 2026 2028 3,596 10 Post - "Cyclone Ditwah" Reconstruction & Livelihoods Support - ADB (Owner - Driven Housing Reconstruction) Provide housing assistance for "Cyclone Ditwah" affected families. 2026 2030 10,695 11 Construction of New Housing Units for Fully Damaged Houses (Indian Grant) Provide housing assistance for "Cyclone Ditwah" affected families. 2026 2027 20,000 12 Repairing Partially Damaged Houses (Indian Grant) Provide housing assistance for "Cyclone Ditwah" affected families. 2026 2027 7,500 13 Construction of Temporary Housing Units (Indian Grant) Provide temporary houses for"Cyclone Ditwah" affected families 2026 2027 459 14 Providing New Housing to the Plantation Community who have Lost their Homes due to Natural Disasters Relocate the plantation community who have been affected by natural disasters and are currently living in temporary housing for an extended period to a safe location. 2025 2027 4,200 507 1,200 15 Indian Funded 10,000 Housing Programme Construct 10,000 housing units in three stages. 2023 2027 32,640 2,660 4,290 2,800 1 Housing Project for Conflict - Affected Areas in Northern and Eastern Provinces of Sri Lanka Construct 13,000 permanant houses for conflict - affected families in Northern and Eastern Provinces 2027 2030 27,300 6,000 7,062 8,064 2 Proposed Resettlement Housing Project at Aramaya Place Construct apartment housing units at Aramaya Place, Dematagoda to relocating the existing underserved settlements into safe, modern, and adequate housing 2027 2028 3,633 2,145 2,000 3 Renovation of Buildings, Common Amenities and the Sewerage Systems of Old Housing Schemes Constructed by NHDA for low Income Families - 2027 Renovate buildings, common amenities and the sewerage systems of old housing schemes constructed by NHDA for low-income families 2027 2027 2,051 2,000 Projection for 2029 Total Estimated Cost (TEC) Cumulative Expenditure (as at 31.12.2025) Revised Budget for 2026 Estimates for 2027 Projection for 2028 Sector: Housing No Name of the Project Objectives and Scope of the Project Project Period New Projects Ongoing Projects Ministry of Housing, Construction and Water Supply Annual Ministry of Plantation and Community Infrastructure Ministry of Defense (Projects 8 - 13 are included under "Cyclone Ditwa" Assistance Programme) 47Previous page Next page Top
MPIP 2027-2029 · file page 52 printed page 48
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year 1 Development of Strategic Cities - Anuradhapura Promote balanced mode of co- development between the sacred and modern parts of Anuradapura city. Construction of Anuradhapura multimodal transport center is ongoing 2016 2027 20,467 3,188 1000 450 2 Construction of 2,000 Housing Units under the Chinese Aid Programme for the Low Income People Construct 1996 housing units to the residents of the underserved settlements in Colombo and its suburbs and Veteran Artist. 2023 2026 28,847 6,539 6500 6,500 6,880 3,220 3 Metro Colombo Solid Waste Management Project Establish a long-term sustainable solid waste management system 2017 2027 33,238 26,057 2500 2,200 500 500 4 Support to Colombo Urban Regeneration Project Construct 4074 housing units for resettling dwellers in underserved settlements in Colombo and suburbs 2019 2027 54,091 28,545 Urban Regeneration Programme Urban Regeneration Projects - Ongoing Torrington Avenue Housing Project (Recommencement) 2025 2028 1,619 499 Colambage Mawatha Housing Project (Recommencement) 2025 2028 7,288 1,860 Urban Regeneration Projects - New Construction of 600 no.Housing Units at Meethotamulla Bus Depot Land Construct 600 housing units at Meethotamulla to provide safe, adequate, and climate-resilient housing for low-income families 2027 2031 8,400 Construction of 560 no Housing Units at Meethotamulla Land Construct 560 housing units at Meethotamulla to provide safe, adequate, and climate-resilient housing for low-income families 2027 2031 8,751 Construction of 472 Housing Units in Kimbula Ela Land Construct 472 housing units at Kimbula Ela area to provide safe, adequate, and climate-resilient housing for low-income families 2027 2031 6,659 Other urban housing projects - New Provide Urban Housing for Underserved Settlements for Main Cities of Sri Lanka (Construction of 300 no of Housing Units at Kurunegala Wilgoda Land) Construct 300 apartment housing units at the Wilgoda land in Kurunegala to relocate households currently living in underserved settlements within the Kurunegala Municipal Council area 2027 2031 4,170 Daraniyagala, Maliboda Estate Infrastructure Housing Project (Balance Works - Stage II) - 32 Housing Units Construct 32 houses (balance work) and relevant infrastructure for the estate workers in the Maliboda Estate 2027 2028 472 6 Reconstruction of Jaffna Town Hall Reconstruct Town Hall in Jaffna 2019 2026 2,350 2,189 220 700 200 7 Implementing Solid Waste Disposal Mechanism in Anuradhapura Municipal Council Area Establish sustainable solid waste management system in Anuradhapura Municipal Council Area 2025 2027 1,442 26 530 702 8 Tourism Promotion and City Branding Promote selected ancient cities and tourism destinations (Kataragama, Kandy, Anuradhapura, & Colombo) through city branding 2025 2029 4,072 52 1800 2,700 100 9 Siyak Nagara /Urban Infrastructure and Township Development Programme (Recommencement) Reducing imbalance between the main and regional cities 2025 2026 2,474 697 930 500 200 Improvement of Road Infrastructure in the Homagama Region (Tec City) Western Bypass Road Development - Acquisition (compensation) - Ongoing component 2024 2026 917 702 Pitipana Thalagala Road Development -Ongoing component 2026 2027 581 Ongoing Projects Sector: Urban Development No. Name of the Project Objectives and Scope of the Project Project Period Total Estimated Cost (TEC) Cumulative Expenditure (as at 31.12.2025) Revised Budget for 2026 Estimates for 2027 Projection for 2028 Projection for 2029 Ministry of Transport, Highways and Urban Development 20,320 5 Resettle dwellers in underserved settlements in Colombo and suburbs (Construction of 730 Housing units in Colambage Mawatha and Torrington Lane are ongoing) 10 Improving Road Infrastructure in the Homagama Tech City Region to enhance accessibility 998 21,000 23,000 500 200 14,700 48Previous page Next page Top
MPIP 2027-2029 · file page 53 printed page 49
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year No. Name of the Project Objectives and Scope of the Project Project Period Total Estimated Cost (TEC) Cumulative Expenditure (as at 31.12.2025) Revised Budget for 2026 Estimates for 2027 Projection for 2028 Projection for 2029 Balance Connection - Connect to High Level Road - Homagama - New Component 2027 2027 198 Development of Proposed Road Section of NSBM Green University to Sri Lanka Biotechnology Center- New Component 2027 2027 220 11 Oliyamulla Storm Water Drainage & Environment Improvement Project Improving storm water drainage and envirionment by reducing the flood risk 2018 2027 3,970 2,892 320 793 800 840 12 Kolonnawa Storm Water Drainage & Environment Improvement Project Improving storm water drainage and envirionment by reducing the flood risk in Kolonnawa Area 2018 2031 15,044 1,526 1310 1,700 1,730 1,830 Conducting preparatory activities of the project - (Grant) 2026 2026 300 To catalyze regional economic growth and enhance the competitiveness of the North and Eastern Provinces by strengthening clusters with economic potential and improving support to SMEs and local businesses - (Loan) 2026 2030 32,000 14 Implementing of Waste Management in the Western Province- Kerawalapitiya Waste Management Park Construct composting facilities at the Kerawalapitiya waste management park 2026 2028 2,591 215 160 1,000 460 15 Maintenance and rehabilitation of existing canals, lakes, wetlands and walkways Ensure maintenance of drainage system and wetlands 972 1,140 1,200 1,300 16 Drainage Design & Implementation and Environment Protection Activities Conduct studies, design works and relevant implementations for environment and drainage improvement 735 640 640 660 1 Construction of Quarters for Government Officials, Rathnapura Construct 200 quarters units for government officials in Rathnapura District and utilize the land currently occupied by government quarters for urban development activities 2027 2030 5,887 1,000 2,000 3500 2 Implementation of Beira Lake Intervention Area Development Plan (Beira Lake Rehabilitation and Redevelopment Project) Enhance the environmental, social and economic value of the Beira lake 2027 2027 1,110 900 1,000 3 Implementation of Oliyamulla Pumping Station Stage - I) Construct a pumping station at Oliyamulla to reduce flood risk in Peliyagoda, Kelaniya and Kiribathgoda areas 2027 2029 5,962 12 10 1,000 4 Urban Development Programme for Identified 26 Cities (To be changed as "Life Cities Development Programme") Transform identified strategically important urban centers to sustainable, resilient, and economically vibrant ucities 2027 2031 65,618 5,084 10,000 15,000 5 Mudun Ela Storm Water Drainage and Environmental Improvement Project Improve canal network and drainage infrastructure, increase stormwater pumping and retention capacity, and land development to reduce flood risk and improve storm water drainage and envirionmental conditions in the Mudun Ela sub-basin 2027 2034 46,191 500 3,000 3,500 6 "Dehiwala Metro-Link" (Proposed Bus Terminal and Facility Center Dehiwala) Establish a bus terminal within Dehiwala-Mount Lavinia Municipal Council Area, providing organized facilities for bus operations, passenger services, and multimodal transport integration. 2027 2029 1,295 500 800 7 Proposed Storm Water Drainage and Public Facility Improvement Project at Beruwala, Dikwella Mitigate recurrent flood condition by improving storm water conveyance and retention capacity through the development of a comprehensive drainage network, enhancement of hydraulic conveyance, restoration of natural water retention areas, and development of public retention facilities in Beruwala, Dickwella 2027 2030 2,946 380 1,200 850 New Projects Annual Annual 13 Regional Empowerment through Vibrant, Inclusive and Viable Economies (REVIVE) - (Previously known as "Integrated Regional Development in Northern and Eastern Provinces") 1,300 6,394 7,500 300 49Previous page Next page Top
MPIP 2027-2029 · file page 54 printed page 50
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year No. Name of the Project Objectives and Scope of the Project Project Period Total Estimated Cost (TEC) Cumulative Expenditure (as at 31.12.2025) Revised Budget for 2026 Estimates for 2027 Projection for 2028 Projection for 2029 8 Implementation of Storm Water Drainage and Environment Improvement Project along Piliyandala Bypass Road Enhance the storm water conveyance and retention capacity throughout the development of a comprehensive drainage network in Piliyandala area 2027 2029 1,821 270 700 850 9 Bindunu Ela Storm Water Drainage & Environmental Improvement Project Rehabilitate Bindunu Ela to mitigate flood, restore paddy cultivation 2027 2031 2,214 145 500 1,000 10 Bus Stand Development, Children Park and Primary School Development Project at Deiyandara Construct a bus stand, a primary school and a children park with recreational area at Deiyandara 2027 2029 2,387 750 1,000 1,637 11 Land Development and Drainage Improvement for the Proposed Rathgama Township Development Project Develop a comprehensive, professionally engineered drainage management system for Rathgama town and develop land for future urban development. 2027 2029 3,380 150 1,000 1,130 12 Bus Stand Development at Madhu Sacred Area Construct a bus stand at Madhu sacred area for improving passenger convenience, traffic management and public transport operations 2027 2028 256 90 166 13 Improvements of the St. Sebestian North Canal Widen and rehabilitate a 345 m section of the canal to enhance storm water conveyance and reduce flooding. 2027 2027 670 14 Refurbishment work of Asphalt Layer in Bicycle Track at Bellanwila Park and Installation of Protective Fence (Crocodile Fence) around the Kelimadala Lake and Lake 02 at Bellanwila Improve the safety, accessibility, environmental, and recreational value of the area 2027 2027 117 15 Construction of Open Concrete Drain at Japan Friendship Walkway and Kimbulawela Walkway Construct open concrete drains to improve storm water conveyance 2027 2027 89 16 Rectification of the Damaged Canal Maintenance Road and Rehabilitation Canal Bank with Gabion Wall at Kirulapone Canal Construct a gabion wall at Kirulapone canal and refurbishment of the asphalt surface 2027 2027 49 17 Construction of Gabion Wall and Refurbishment Work of Asphalt Layer along the Maintenance Road of St. Sebastian East Canal Construct a gabion wall and refurbishment of the asphalt surface 2027 2027 141 18 Installation of Proposed Gate Mounted Pumps at Kalu Palama for Flood Mitigation Installate gate-mounted pumps at Kalu Palama to facilitate the discharge of storm water from the Kittampahuwa Canal into the Kelani River to mitigate flooding in the Kolonnawa area 2027 2029 3,154 600 1,500 1,054 19 Survey, Studies and preparatory works Conduct feasibility studies, surveys and preperatory works 2027 2027 480 480 707 753 20 Enhancing the Socio-Economic Well-Being of the Dwellers in Urban Underserved Settlements through Social Empowerment and Development Initiatives Enhance human capital development, economic growth and social well-being of the dwellers in urban underserved settlements 2027 2031 1,125 82 80 75 21 Development of Mass Scale Waste Management (Waste to Energy) Project at Karadiyana (PPP) Implement a Thermal Recovery Facility/ Waste-to-Energy plant with the Capacity of 10 MW and process approximately 500-700 MT of Waste per day at Karadiyana. 2027 2028 16,279 588 50Previous page Next page Top
MPIP 2027-2029 · file page 55 printed page 51
Major Public Investment Project 2027-2029
Started/ Expected
Starting Year
Expected
Completion Year
1
Defence Headquarters Complex Project - Phase I
Create a centralized organizational structure that would enhance corporation and
operational flexibility and other tasks amongst the tri forces effectively, whilst
enhancing efficiency through the sharing of resources within the defence hierarchy
2011
2027
65,451
59,036
4,100
2,850
2
Strategic Defence Communication Network
Development of a Strategic Defence Communication Network to ensure secure,
reliable, and integrated communications for effective coordination, information
sharing, and operational command across defence establishments.
2015
2027
2,159
684
3
Rebuilding Sri Lanka - (Ditwah)
Reconstruction, renovationa and repair work of damages caused by Cyclone Ditwah
2026
2027
1,490
1,002
1
Modernization of Sri Lanka Army Telecommunication
Network
Upgrade the Sri Lanka Army’s microwave backbone and PABX systems to ensure
high-speed, uninterrupted communication and establish redundancy for enhanced
reliability
2026
2030
509
40
244
250
2
Replacement of Out-dated Radio Communication
Systems
Strengthen the communication capabilities of the Sri Lanka Army by replacing the
existing Cougar radio systems with Hytera digital radio equipment, with special
emphasis on expansion and sustainability strategies
2026
2030
1,812
350
733
345
3
Army Hospital Project
Providing medical services to armed forces personnel, their families, retired members,
and civilian staff serving in the forces by constructing a 15-story building to
accommodate medical facilities
2017
2027
4,004
1,823
200
200
4
Army Hospital Information System
Upgrade and Integration of Army Hospital Information System with Smart Picture
Archive Communication System and Laboratory Information Management System
2024
2027
284
85
174
1
Upgrading VHF Clear communication system
Acquiring VHF Clear Handsets, Base Stations and VHF Clear Repeaters to achieve
uninterrupted communication for administration and operational requirement
2021
2028
550
160
50
50
50
50
2
Construction of Quay and Infrastructure Facilities at
Naval Dockyard Trincomalee
Enhancing the berthing facilities at Trincomalee Harbor to address current
inadequacies and accommodate larger naval vessels, supporting the operational
requirements of the Sri Lanka Naval Dockyard
2021
2028
7,582
4,904
1,000
1,680
3
Expansion of MTTU Unit by Acquisition of new
equipment
To facilitate the transition from Planned Preventive Maintenance to Condition-Based
Maintenance by utilizing accurate and reliable statistics, thereby ensuring a more cost-
effective approach
2026
2030
250
103
50
50
50
50
4
Upgrading SLN PABX & Switch Network
Upgrading the Sri Lanka Navy’s (SLN) PABX and switch network to improve
communication efficiency, network reliability, and connectivity across naval
establishments.
2021
2030
275
57
50
5
Enhancement of Infrastructure Facilities at SLN
Dockyard incorporated with floating dock
Enhancement of infrastructure facilities at the Sri Lanka Navy (SLN) Dockyard,
including the floating dock, to strengthen ship repair, maintenance, and operational
support capabilities.
2024
2028
528
34
6
Obtaining a 4,000 Ton Floating Dock Under Indian
Donation
The proposed project aims to improve the ancillary facilities to ensure the maximum
functioning of the dock after the establishment of the floating dock received from
India as a grant
2025
2028
528
75
562
100
118
Sector: Governance - Defence
Cumulative
Expenditure (as at
31.12.2025)
Project Period
Total Estimated
Cost (TEC)
Name of the Project
No
Objectives and Scope of the Project
Revised Budget for
2026
Estimates for 2027
Projection for 2028
Projection for 2029
Sri Lanka Army
Sri Lanka Navy
Ongoing Projects
Ministry of Defence
51Previous page Next page TopMPIP 2027-2029 · file page 56 printed page 52
Cited in: ICT spend by agency, Ministry and programme movers
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year Cumulative Expenditure (as at 31.12.2025) Project Period Total Estimated Cost (TEC) Name of the Project No Objectives and Scope of the Project Revised Budget for 2026 Estimates for 2027 Projection for 2028 Projection for 2029 7 Development of Naval acadamy Development of the Naval Academy to enhance training infrastructure and facilities for naval personnel, strengthening professional education, skills development, and operational readiness. 2013 2029 1,472 1,335 200 260 364 1 Capital overhaul of SMH-4416 Helicopter 2026 2027 1,530 1,530 2 Capital overhaul of SMH-588 Helicopter 2026 2027 1,168 1,168 3 Capital overhaul of SMH-599 Helicopter 2026 2027 1,485 1,485 4 Capital overhaul of SMH-596 Helicopter 2026 2027 1,524 1,523 5 Recovery of Mi-17 Helicopters Repair and overhaul the engines, main gearboxes, and auxiliary power units necessary to facilitate the comprehensive overhaul of the Mi-17 helicopter 2026 2027 1,047 144 6 Sustainablity of Mi-17 Helicopters Obtain overhauled and repaired components from an overseas facility to ensure the continuation of operational flying hours. 2026 2027 476 476 7 Upgrade of Qty 05 Kafir Aircraft 6 Advanced upgradation of Kafir aitcratfs 2026 2028 10,370 10,897 8 Construction of Auditorim at SLAF Academy at China Bay Construction of a auditorium building 2025 2027 226 226 296 1 Enhancing Operational Readiness and Humanitarian Assistance & Disaster Relief (HADR) capabilities of the Sri Lanka Army by acquisition of Military Drone and Counter-Drone Aquiring high-endurance surveillance military drones and anti-drone defence systems. 2027 2027 344 344 2 Capacity Building and Operationalization of the cyber security regiment for enhance security and cuber resilience Capacity building and operationalization of the Cyber Security Regiment to strengthen cyber defence capabilities, protect critical information systems, and enhance cybersecurity preparedness and resilience against evolving cyber threats. 2027 2029 310 107 100 104 3 Enhancement of Army Digital Correspondence and application Platform Enhancement of the Army’s digital correspondence and application platform to streamline administrative processes, improve information sharing, and strengthen the efficiency, security, and accessibility of internal communications and digital services. 2027 2031 1,379 300 272 272 4 Upgradation of Army Headquarters Local Area Network Replace all End-of-Support (EoS) and End-of-Life (EoL) switches. 2027 2029 638 223 196 219 5 Upgrading of Sri Lanka Army Transmission Network's Core Nodal Transport Network (Digital Backbone) from E1 to Gigabit Ethernet Architecture and related expansions Deployment of secure, centralized, and high-speed network connectivity to remote Army establishments. 2027 2029 497 198 105 195 1 Establishment of a Disaster Management Recovery Center for State Intelligent Service Establishment of a Disaster Management Recovery Center 2027 2031 400 400 1 Enhance the national security while uplifting the attack helicopter capabilities of the Sri Lanka Air Force Comprehensive overhaul and refurbishment of three Mi-35 helicopters 2027 2029 9,240 8,778 462 Sri lanka Air Force Overhaul the aircraft’s structural, avionics, power plant, armament, and other systems to ensure full operational capability for fulfilling flying requirements in the UN Multidimensional Integrated Stabilization Mission in the Central African Republic (MINUSCA) New Projects Sri Lanka Army State Intelligence Service Sri Lanka Air Force 52Previous page Next page Top
MPIP 2027-2029 · file page 57 printed page 53
Cited in: ICT spend by agency, Ministry and programme movers
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year Cumulative Expenditure (as at 31.12.2025) Project Period Total Estimated Cost (TEC) Name of the Project No Objectives and Scope of the Project Revised Budget for 2026 Estimates for 2027 Projection for 2028 Projection for 2029 2 Enhance the National Security through uplifting the F-7 GS (Fighter Jet) Aircraft Capabilities of Sri Lanka Air Force Overhaul, refurbishment, and service-life extension of existing grounded F-7GS aircraft 2027 2029 3,900 780 2,210 910 3 The Acquision of 01 Unmanned Aerial Vehicle(UAV) Platform with payload Acquisition of 01 Unmanned Aerial Vehicles (UAV) 2027 2027 3,092 *3092 4 Enhance Search and Rescue (SAR) flights, Firefighting operations, Maritime and offshore flights, Humanitarian Assistance and Disaster Relies (HADR), Casualty Evacuation (CASEVAC), Medical Evacuation (MEDIVAC) and pilot training by purchasing of power sections and related spares for Bell 412EP helicopters Acquisition of Qty-1 Pratt and Whitney Power Sections required for the replace Time between Overhaul (TBO) 2027 2028 520 520 5 Enhancing National Security through improving aircraft serviceability of the Sri Lanka Air Force aircraft fleet Purchase of Tools and test equipment for flying and engineering formations of SLAF 2027 2028 350 100 250 6 Sustainability and Capability Enhancement of SLAF AN- 32B Fleet for Improved Medium Aircraft and National Security requirements Purchase of main components for recovery and sustainability of AN-32B aircraft fleet 2027 2028 1,650 1,650 7 Avionics Upgradation of SCH-880 (SCH-280) C-130 Aircraft Procurement and commissioning of suitable aircraft and associated support systems to enhance SLAF capabilities for HADR 2027 2029 6,900 3,219 50 3,631 8 Aquiring of 07 Mobile Anti Drone Defence system and 03 static Anti Drone System to enhance counter Drone Capabilities of National Air Defence System Acquiring of 07 Mobile Anti Drone Defence System and 03 Static Anti Drone System to SLAF 2027 2028 7,726 *3,863 *3,863 9 Strengthening National Security by Uplifting the serviceability, reliability, and operational readiness of the Beechcraft King Air 300 fleet of the Sri Lanka Air Force Procurement of spares/ components 2027 2028 570 370 200 10 Enhance Humanitarian Assistance and Disaster relief (HADR) Operational capabilities of Bell 412 & 412EP Helicopters by Purchasing of Floatation pack Purchase of Floatation Pack for Bell 412 & 412EP helicopters 2027 2027 750 750 11 Enhance the National Security while uplifting the Mi-17 Helicopter Capabilities of the SLAF by purchasing of Major Components for Mi-17 Helicopter fleet SLAF and Un Mission at MINUSCA (CAR) Procurement of major components for Mi 17 aircrafts 2027 2028 340 100 240 12 Aquiring a Kfir Simulator for No. 10 Squadron Acquiring a Kfir Simulator 2027 2028 2,900 27 2,873 13 Enhance the National Security while uplifting the advanced jet trainer aircraft capabilities of the Sri Lanka Air Force Procurement of overhaul and service-life extension services from the OEM for K-8 aircraft 2027 2028 2,320 1,020 1,300 14 Enhance the national security while uplifting the medium lift helicopter capabilities of the Sri Lanka Air Force Capital overhaul and refurbishment of Mi-17 helicopters 2027 2029 15,411 11,340 771 53Previous page Next page Top
MPIP 2027-2029 · file page 58 printed page 54
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year Cumulative Expenditure (as at 31.12.2025) Project Period Total Estimated Cost (TEC) Name of the Project No Objectives and Scope of the Project Revised Budget for 2026 Estimates for 2027 Projection for 2028 Projection for 2029 15 Enhance the National security while uplifting the Heavy lift aircraft capabilities of the Sri Lanka Air Force Programmed Depot Maintenance (PDM) of one C-130 aircraft 2027 2029 6,200 1,239 4,651 310 16 Enhance the national security while uplifting the overhaul of K-8 and F-7 GS aircraft fleet capabilities of Sri Lanka Air force. Overhaul, repair, inspection, and modification programme for F-7, K-8, and PT-6 aircraft and components 2027 2027 481 481 17 Enhance the national security while uplifting the medium lift helicopter capabilities of the Sri Lanka Air Force To Check and recovery works/overhaul and service life extension of SCM-860 AN- 32B aircraft 2027 2030 4,660 1,864 2,019 699 18 Acquisition of Qty 01 C130 Aircraft under U.S. Excess Defence Articles (EDA) Programme for Sri Lanka Air Force Acquisition of Qty 01 C130 Aircraft as a grant 2027 2027 6,642 6,642 1 Establishment of a Digital Forensic Laboratory Procurement, installation, configuration, and commissioning of specialized digital forensic hardware, software, and secure laboratory facilities, including system integration and training of authorized personnel. 2027 2029 855 212 377 265 2 Replace and upgration of servers, Network & Security infrastructure and implementation of new role-over Backup Server at the Border Risk Assessment Centre for improving the system functioning capabilities Replacement and upgration of Servers, Network & Security infrastructure and implementation of new role-over Backup Server. 2027 2027 420 420 3 Architectural Modernization with Hyper converged Infrastructure (HCI) in Ministry of Defence Architectural Modernization with hyper converged Infrastructure (HCI) in Ministry of Defence 2027 2027 250 250 1 Purchasing of 10 Nos Rigid Hull Inflatable Boat (RHIB) to enhance Operational Readiness and Disaster Response Capability of Sri Lanka Coast Guard Purchasing of 10 No's Rigid Hull Inflatable Boats 2027 2029 383 77 77 77 2 Construction of 04 Nos Accommodation Type Air- conditioned Wave Rider Patrol Craft (AWRIPC) for Sri Lanka Coast Guard to replace IPC fleet of SLCG which are aged beyond 25 years and more Construction of 04 No’s Accommodation Type Air-conditioned Wave Rider Inshore Patrol Craft (AWRIPC) for Sri Lanka Coast Guard to replace IPC fleet of SLCG which are aged beyond 25 years and more. 2027 2027 524 524 3 Strengthening Sri Lanka Coast Guard Oil Spill response Capability through Donation of 3 vessels, Multi-Beam Sonar, 20 oil Booms, 4 Crane Trucks, and Associated Oil Spill Response Equipment bt JICS(Japan International Cooperation System) Acceptance and deployment of donated vessels, multibeam sonar, oil booms, crane trucks, and associated oil spill response equipment 2027 2027 3,378 3,378 1 Construction of 20 No's of 23 feet Cedric craft with 02 No's 200HP OBM (for each craft) to enhance the rapid response capability Construction and commissioning of 20 new 23-foot Cedric craft equipped with twin 200 HP outboard motors 2027 2030 622 3 248 248 2 Acquisition of 4 Patrol Boats to upgrade the Fast Gun Boat Fleet Acquisition of 4 Fast Gun Boats 2027 2029 3,000 1,000 1,000 1,000 Sri Lanka Navy Ministry of Defence Department of Sri Lanka Coast Guard 54Previous page Next page Top
MPIP 2027-2029 · file page 59 printed page 55
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year Cumulative Expenditure (as at 31.12.2025) Project Period Total Estimated Cost (TEC) Name of the Project No Objectives and Scope of the Project Revised Budget for 2026 Estimates for 2027 Projection for 2028 Projection for 2029 3 Retrofitting 8 Patrol Boats to upgrade the fast gun Boat (FGB) Fleet with Enhanced Surveillance, Communication, and UAV Compatibility Procurement, installation, integration, and commissioning of shipborne UAV systems and associated surveillance 2027 2027 300 300 4 Enhancement of Sri Lanka Navy Habour Operations by Acquiring Two Tug Vessels Procurement of a tugboat for the Sri Lanka Navy 2027 2027 1,100 1,100 5 Upgrading of 25kW (40 No's) networkable radars in Coastal monitoring System Replacement of obsolete 25 kW radars 2027 2030 590 118 136 153 6 Standardizing and upgrading of medical and Dental equipment's of SLN hospitals Procurement and replacement of outdated medical and dental equipments of Navy Hospitals 2027 2030 400 100 100 100 7 Upgrading Integrated Maritime Surveillance System including Harbour protection Sonar system and Aerial surveillance to Strengthen Harbour Security Procurement, installation, integration, testing, and commissioning of modern underwater detection and SONAR systems at Colombo and Trincomalee harbours 2027 2029 354 142 47 165 8 Equipping 09 x Disaster Response Units (DRUs) with Humanitarian Assistance and Disaster Relief (HADR) equipment for rescue operations and rehabilitation operation Equipping 09 x Disaster Response Units (DRUs) with Humanitarian Assistance and Disaster Relief (HADR) equipment for rescue operations and rehabilitation operation 2027 2029 858 286 286 286 9 Ascertaining coastal security through enhancement of efficiency of the Inshore Patrol Craft fleet of Sri Lanka Navy by construction of Accommodation Type Air-conditioned Wave Rider Inshore Patrol Craft (AWRIPC) Construction and commissioning of indigenously manufactured Waterjet Rigid Inflatable Patrol Craft (WRIPCs) to replace ageing Inshore Patrol Craft (IPCs) 2027 2028 892 435 457 10 Procurement, Installation and Commissioning of 12.7mm Remote Controlled Naval Weapon Station (RCNWS) for Advances Offshore Patrol Vessels (AOPVs) of Sri Lanka Navy to enhance Maritime and National Security Provision four (04) modern 12.7 mm RCNWS, two for each AOPV 2027 2027 590 590 11 Upgrading of 50kW (10 No’s) radars in fleet units in Sri Lanka Navy Replacement of existing 50 kW onboard radar systems with modern advanced radar systems 2027 2030 250 50 58 67 12 Upgrading of HF Secure communication network of Sri Lanka Navy Replacement of obsolete SLN HF communication equipment with modern military- grade HF radio systems incorporating encryption, Automatic Link Establishment (ALE) 2027 2031 750 150 150 150 13 Upgradation of UHF fleet communication and ground to air communication systems Replacement of obsolete UHF fleet communication equipment and expansion of the Ground-to-Air VHF communication network 2027 2031 262 106 106 30 14 Official Security Assistance Program for Sri Lanka Navy Acuqisition of drones for Sri Lanka Navy 2027 2028 1,428 510 * To be ammeded based on the Cabinet Decisions 55Previous page Next page Top
MPIP 2027-2029 · file page 60 printed page 56
Cited in: Ministry and programme movers
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year 1 UN Peace Keeping Mission To deploy STF Formed Police unit for the United Nation Peace Keeping Operations and to have a foreign income Generation for the country to uplift the current economic situation Public order Management. Protecting UN personnel and facilities. Protecting civilian. Supporting police operations Adhering to international standards 2017 2027 2,771 2,110 250 100 2 Construction of a Building to Police Academy Objective- Providing accommodation facilities for training officers Scope - Build up a three storied building for Katana Police Academy 2024 2028 1,185 490 100 150 445 3 Development of Police Training Colleges Providing required buildings for training colleges 2023 2027 484 182 100 70 4 Software Development of Police Department Development of software solutions to improve the efficiency, data management, and operational processes of the Police Department. 2025 2028 4,700 29 1,000 1,210 1,255 5 Constrction of three story Administrative building at Gonahena (STF) Construction of a three-story building in order to provide facilities at the Gonahena STF camp. (Administrative building, Barracks, etc) 2026 2027 346 96 250 1 Construction of CID Building The project aims to centralize all Criminal Investigation Department (CID) divisions into a single integrated facility and provide the advanced infrastructure necessary for investigative operations. 2027 2029 9,663 500 4,100 5,000 2 Construction of a ward complex with administrative and accommodation facilities at the Narahenpita Police Hospital The Project is initiative focused on constructing a 20-story ward complex and a 12-story accommodation building to provide modern, high-quality, and efficient healthcare services for active and retired police officers and their families. 2027 2031 8,100 500 3,800 3,800 3 Construction of accommodation building and dining hall for Sri Lanka Police (50% contributed by the Police Fund) The project aims to construct a ten-story accommodation building, standard dining hall, and space-optimized parking facility in Colombo to provide modern lodging for senior- level Sri Lanka Police officers, thereby enhancing their well-being and operational readiness 2027 2029 1,621 162 300 340 4 Construction of Mirihana Police Sports Complex (50% contributed by the Police Fund) The project aims to complete all outstanding civil and stuctural works for a fullly equipped indoor facility that will support the well-being of nearly 85,000 active police personnel and train athletes for national and international 2027 2029 945 95 5 Completion of the Police Trainning Collage, Attidiya (50% contributed by the Police Fund) The project plan to finalize long-stalled building assets and establish a modern, centralized, and technologically advanced training facility designed to enhance the professional competencies and operational capabilities of approximately 85,000 police officials. 2027 2029 6,500 300 1,100 1,850 6 Development and Managed Service of an Integrated Human Resource Management Information System (HRMIS) The project aims to establish a secure, digitally enabled platform that modernizes and automates the end-to-end human resource lifecycle to enhance institutional efficiency, transparency, and data-driven decision-making. 2027 2030 376 100 275 7 National Incident Management System (IMS) - National Police Digital Core Platform The project aims to establish an integrated, secure, and interoperable platform that modernizes policing operations, enhances public safety, and supports transparent and accountable criminal justice administration. 2027 2029 370 100 270 8 Request for Digital Communication Equipment to the Sri Lanka Police The Project is designed to transition the police's outdated analog communication system to a secure and efficient Digital (Tier II) network to enhance operational capabilities and public safety . 2027 2028 1,721 900 400 420 9 Construction of indoor Sports Complex and Swimming Pool for National Police Academy The project aims to enhance the physical fitness, tactical readiness, and disaster response capabilities of police personnel. 2027 2029 1,628 200 700 720 Projection for 2028 Projection for 2029 New Projects Sector: Governance - Public Security No Name of the Project Objectives and Scope of the Project Project Period Total Estimated Cost (TEC) Cumulative Expenditure (as at 31.12.2025) Ongoing Projects Ministry of Public Security and Parliamentary Affairs Revised Budget for 2026 Estimates for 2027 56Previous page Next page Top
MPIP 2027-2029 · file page 61 printed page 57
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year Projection for 2028 Projection for 2029 No Name of the Project Objectives and Scope of the Project Project Period Total Estimated Cost (TEC) Cumulative Expenditure (as at 31.12.2025) Revised Budget for 2026 Estimates for 2027 10 Construction of Academic & Administrative Building Stage II at National Police Academy The project aims to strengthen the academic and institutional capacity of the Sri Lanka Police and other law enforcement agencies by establishing a modern, integrated training facility. 2027 2029 2,067 330 820 900 11 Enhancement of the Security of the Boarder system in the Department of Immigration & Emigration System The project plans to install 12 Automated Border Control (ABC) e-Gates at Bandaranayke International Airport, modernizing the gateway through biometric verification to improve passenger processing efficiency and strengthen national security. 2027 2028 1,350 1,000 350 12 Establishment of Immigration Temporay Holding Facility- Wattala Establishment of Immigration Temporay Holding Facility- Wattala 2027 2029 1,500 500 500 500 13 Upgrading of Department of Immigration & Emigration Existing System Upgrading of Department of Immigration & Emigration Existing System 2027 2027 975 750 225 14 Enhancement of the Security of the Department of Immigration & Emigration System The project aims to enhance the security, resilience, and reliability of the Department of Immigration and Emigration's critical ICT infrastructure by implementing a robust disaster recovery solution, a centralized Network Operations Center (NOC) monitoring system, and privileged access controls. 2027 2028 325 200 125 15 Digitalization of Department of Immigration & Emigration System The project aims to modernize and automate the department's core processes to eliminate operational delays, enhance cybersecurity readiness, and improve service efficiency for over 10 million service receivers. 2027 2028 350 250 100 16 Establishment of office and Rest room Complex, Trincomalee The project aims to construct a modern port facility to enhance operational efficiency, staff welfare, and immigration service delivery for passengers, investors, business personnel, and crew members. 2027 2029 362 100 260 17 Development of Kandakadu Rehabilitation Center The project plans to enhance and upgrade infrastructure facilities, such as office buildings, security fencing, and essential operational amenities. 2027 2027 801 145 300 300 18 Construction of accommodation building for Other Rank Officers The Project aims to enhance the overall academic, physical, technological, and operational training capacity of Sri Lankan law enforcement. 2027 2029 822 90 300 440 57Previous page Next page Top
MPIP 2027-2029 · file page 62 printed page 58
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year 1 House of Justice Original Plan 16 Floors, Scope reduce to 6 Floors be fully completed and further Construct Structure from 7 Floors to 10 Floors 2021 2026 8,864 6,253 1,400 3,000 1,746 2 Support to Justice Sector in Sri Lanka Improving access to justice for poor and persons in vulnerable situations, children under the care of women inmates in prisons 2022 2027 6,935 87 129 215 226 237 3 Construction of 3000 Rain Water Harvesting System in Jaffna District - ONUR Project (India) Refurbishment of Supreme Court and Court of Appeal with facilities 2017 2028 421 308 15 16 17 4 MOJ Building Strengthen administration of Justice through support to adopt international best practices and tools and strengthen the qualifications and professionalism of Justice sector actors 2025 2027 11,943 704 3,100 1,860 2,000 3,692 5 Galle Court Complex Recommencement of the construction work of the court Complex - Galle 2020 2027 1,686 1,307 300 100 242 6 Small Scale Development Programme Improvement of infrastructure facilities for courts 2021 2027 303 65 284 140 7 Gampola Court Complex Enhance court facilities 2017 2028 458 356 20 1 8 Construction of Court Complexes in Anuradhapura, Polonnaruwa, Matale, jaffna and residential facilities for judges Construction of court complexes and residential facilities 2021 2027 871 294 240 230 159 9 Relocating courts in Rathnapura and Welimada Enhance court facilities 2018 2027 3,030 2,424 50 15 10 Expansion of Courts in Kilinochchi, Theldeniya, Pugoda and Kantale Construction of courts 2018 2027 1,882 1,271 410 130 11 Walapane Magistrate Court Complex Construction of Court Complex Walapane 2022 2028 1,033 92 300 200 300 344 12 Improvement of the Infrastructure Facilities in the Judicial Sector Improvement of infrastructure facilities for courts 2021 2027 18,500 1,314 1,373 876 1,060 150 13 Construction of Pallekele Prison Complex Expanding the correctional facilities to meet the increasing needs of the Prison system 2007 2028 4,364 1,474 540 600 630 662 14 Relocation of Prisons in Western Province To expand the correctional facilities to meet the increasing needs of the Prison system 2025 2026 318 101 175 150 158 165 15 Enhancement of Sanitary Facilities of detainees in Prisoners Improving hygiene and sanitation of the Prisoners in all Prison Institutions Island wide 2022 2028 1,296 580 350 288 302 318 16 Construction of Kaduwela Court Construction of four story building 2026 2028 1,233 400 300 500 500 17 Construction of Security Wall and 2 Nos. of inmate Building at Watareka Prison Construction of Ward Buildings ( 2 nos of Two-Story Buildings) and Construct of 20’ high parapet wall 2026 2028 256 100 200 210 221 18 Establish a residential correctional centre for the Development of community-based corrections at Kakirawa Construction of Offenders Rehabilitation Center and Offenders Hostel including main security office, operation office, Individual counseling and medical center, training center, stores, hygiene building, electrical and mechanical operation room walls and fence. 2026 2027 600 10 350 275 Ongoing Projects Sector: Governance - Justice No Name of the Project Objectives and Scope of the Project Project Period Total Estimated Cost (TEC) Cumulative Expenditure (as at 31.12.2025) Ministry of Justice and National Integration Revised Budget for 2026 Estimates for 2027 Projection for 2028 Projection for 2029 58Previous page Next page Top
MPIP 2027-2029 · file page 63 printed page 59
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year No Name of the Project Objectives and Scope of the Project Project Period Total Estimated Cost (TEC) Cumulative Expenditure (as at 31.12.2025) Revised Budget for 2026 Estimates for 2027 Projection for 2028 Projection for 2029 1 Project for the Development of Infrastructure in the Judicial Sector The Project is comprising 14 sub-projects. Its primary goals are to construct and modernize court complexes and judicial residences across the country to accelerate the resolution of pending cases and create public-friendly environments. 2027 2031 36,748 1,100 5,103 5,117 2 Strengthening Social Cohesion And Dispute Resolution in Sri Lanka (SSDR) The Project aims to foster a tolerant, inclusive, and peaceful society in Sri Lanka by addressing social exclusion, strengthening access to justice through alternative dispute resolution mechanisms, and supporting inter-communal economic cooperation, with a specific focus on women, youth, and communities in the North, East, and Uva provinces 2027 2030 3,054 10 Department of Prisons 3 Relocation of Matara Prison to Kotawilawatta Area The Project aims to resolve severe overcrowding at the existing Matara facility by constructing a modern, purpose-built correctional facility with a capacity for 1,300 inmates, thereby enhancing safety, security, and human rights standards while aligning prison infrastructure with local town planning and judicial institutions. 2027 2029 5,189 500 2,316 2,000 4 Expansion of Wariyapola Remand Prison The project aims to resolve severe overcrowding by expanding capacity to 1,100 inmates, modernizing physical security, and upgrading facilities to improve welfare and operational efficiency. 2027 2029 4,422 500 800 2,000 5 Capacity expansion of Wataraka Prison (Phase II) The Project (Phase II) aims to expand the facility's capacity from 500 to approximately 1,500 inmates using modern prefabricated construction technology, thereby alleviating severe overcrowding at the Welikada, Magazine, and Colombo prisons. 2027 2029 1,770 500 870 Ministry of Justice New Projects 59Previous page Next page Top
MPIP 2027-2029 · file page 64 printed page 60
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year 1 e Grama Niladari (e-GN) Project to Enhance the ICT usage among Grass Root Level Government Officers - Phase II (E-GN Project) To enhance ICT-enabled public service delivery at the grassroots level by empowering Grama Niladhari officers with digital tools, systems, and technological capacities. 2016 2027 1,689 401 594 2 Implementation of the project to establish and implement a business center for incubators/accelerators in Jaffna To establish a business incubation and acceleration center in Jaffna to support entrepreneurship, innovation, and the growth of startups and small businesses. 2025 2027 372 3 Digitalization of Divisional Secretariates Phase II To strengthen digital governance and improve service delivery by expanding ICT infrastructure and digital systems in Divisional Secretariats. 2026 2027 500 500 975 1,500 2,000 4 Construction of New Office Building at Negambo Divisional Secretariat Division To construct a new office building for the Negombo Divisional Secretariat to enhance administrative efficiency and improve public service delivery. 2026 2028 399 200 250 5 Completion of Homagama Divisional Secretariat Building To complete the construction of the Homagama Divisional Secretariat building to provide improved administrative facilities and public services. 2021 2027 512 277 90 100 6 Continuation construction of Ampara District Secretariat Building To continue and complete the construction of the Ampara District Secretariat building to strengthen district-level administrative operations and service delivery. 2024 2027 354 237 121 7 Construction of Kalthota Divisional Secretariat Building To construct a new Divisional Secretariat building in Kalthota to improve administrative capacity and accessibility of government services to the public. 2024 2027 328 145 190 1 Construction of New Building Complex for Elepatha Divisional Secretariat To construct a modern building complex for the Elapatha Divisional Secretariat to enhance administrative efficiency and improve the quality and accessibility of public service delivery. 2027 2029 322 75 175 130 2 Construction of New Administrative Building Complex for the Anuradhapura District. To construct a new administrative building complex for the Anuradhapura District Secretariat, comprising modern office and public service facilities, to strengthen administrative efficiency and improve service delivery. 2027 2029 2,435 300 1,068 1,067 3 Construction of New Administrative Complex for the District Secretariat at Vavuniya To construct a new administrative complex for the Vavuniya District Secretariat to improve administrative functions and public service delivery. 2027 2029 1,560 500 600 460 4 Construction of Divisional Secretariat Building Complex at Dehiattakandiya Divisional Secretariat Division To construct a new building complex for the Dehiattakandiya Divisional Secretariat to enhance administrative and public service functions. 2027 2029 704 190 239 275 5 Construction of an office building for Puttalam District Secretariat To construct a new office building for the Puttalam District Secretariat to improve administrative efficiency and public service delivery. 2027 2030 2,680 830 890 890 6 Construction of a new building for Welimada Divisional Secretariat To construct a new building for the Welimada Divisional Secretariat to improve administrative efficiency and public service delivery. 2027 2029 741 150 300 291 7 Construction of a new building at Uva Paranagama Divisional Secretariat To construct a new building with modern office and public service facilities for the Uva Paranagama Divisional Secretariat to improve administrative efficiency and service delivery. 2027 2029 741 150 300 291 New Projects Ongoing Projects Ministry of Public Administration, Provincial Councils and Local Government Sector: Governance - Public Management No Name of the Project Objectives and Scope of the Project Project Period Total Estimated Cost (TEC) Cumulative Expenditure (as at 31.12.2025) Projection for 2029 Projection for 2028 Estimates for 2027 Revised Budget for 2026 60Previous page Next page Top
MPIP 2027-2029 · file page 65 printed page 61
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year No Name of the Project Objectives and Scope of the Project Project Period Total Estimated Cost (TEC) Cumulative Expenditure (as at 31.12.2025) Projection for 2029 Projection for 2028 Estimates for 2027 Revised Budget for 2026 8 Construction of New Building for Land and District Registry, Colombo. To construct a new Divisional Secretariat building with modern facilities to enhance administrative efficiency and public service delivery. 2027 2029 1,916 65 900 951 9 Nilapiyasa Quarters project – Polonnaruwa District To construct Nilapiyasa quarters with essential amenities in the Polonnaruwa District to support government officers and improve public service delivery. 2027 2028 562 350 212 10 Transforming Local Administrative Data Collection Systems for SDG Acceleration (One Registry) To establish an integrated digital registry for efficient collection, management, and sharing of local administrative data to support SDG implementation. 2027 2029 1,050 10 11 Construction of a New Building for Puttalam District Assistant Registrar General Office and Marawila Land Registry Office Construct a new building with office, records management, and public service facilities for the Puttalam District Assistant Registrar General Office and Marawila Land Registry Office. 2027 2029 397 14 250 12 Construction of New Building for Land & District Registry, Matara To construct a new building with office, records storage, and public service facilities for the Land and District Registry, Matara. 2027 2029 607 31 61Previous page Next page Top
MPIP 2027-2029 · file page 66 printed page 62
Cited in: Governance, risk and assurance, Privacy and data protection
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year 1 Financial sector Safety Net Strengthening Project - FSSNP (WB) Strengthen financial sector stability through improved safety nets, regulation, and institutional capacity. 2024 2027 44,700 39,160 3,532 3,220 2 Rolling out of ITMIS Programme to expenditure units Expand ITMIS to government expenditure units to improve financial management and reporting. 2019 2027 6,342 644 Department of National Planning 3 Governance for Growth Programme (Australian Grant) Strengthen governance, public sector capacity, and service delivery through institutional reforms. 2021 2030 11,250 817 510 415 341 4 Promoting Autonomy, Literacy and Attentiveness through Market Alliance (PALAMA) Project in Sri Lanka Phase II Improve literacy, learning outcomes, and educational inclusion through teacher development, learning interventions, stakeholder partnerships, community engagement, and institutional capacity strengthening. 2024 2027 10,400 4,528 1,439 3,039 1,400 5 Decentralized Capital Budget Programme (DCB) Reduce regional disparities and promote rural development by empowering local representatives to implement small-scale capital projects that address specific community needs, enhance living standards, and improve socio-economic conditions within their districts 2,250 2,250 2,250 2,250 Department of Development Finance 6 Construction of three warehouses (Local) Construct three warehouse facilities, including storage buildings, handling facilities, utilities, and supporting infrastructure, to improve the storage, security, and management of government resources and materials. 2015 2028 895 539 45 47 50 Department of Public Finance 7 e-Government Procurement Project (e-GN) Establish and implement a nationwide electronic government procurement system, including digital procurement platforms, supplier registration, e-bidding, contract management, and supporting ICT infrastructure to enhance transparency and efficiency in public procurement. 2023 2027 1,200 133 200 502 402 Department of Inland Revenue 8 Revenue Administration Management System for Department of Inland Revenue (RAMIS) Modernize tax administration through the implementation of an integrated Revenue Administration Management System covering taxpayer registration, tax filing, assessments, revenue collection, compliance monitoring, and reporting functions. 2014 2029 17,990 17,424 3,259 4,285 4,499 4,725 Department of Excise 9 Revenue Administration System for Excise Department (RASED) Digitize excise administration through automated licensing, revenue collection, and compliance monitoring. 2024 2027 3,000 64 300 286 260 248 Sri Lanka Customs 10 Development and Implementation of Risk Management Software in Sri Lanka Customs Strengthen customs operations through the development and implementation of a risk management software system for cargo profiling, risk assessment, intelligence analysis, compliance monitoring, and trade facilitation. 2024 2027 279 33 150 11 Implementation of Oracle Exadata System Enhance government data management capabilities through the establishment of an Oracle Exadata platform, including high-performance database infrastructure, data storage, security, disaster recovery, and business continuity facilities. 2024 2031 2,198 110 121 198 22 Sector: Governance - Finance No Name of the Project Objectives and Scope of the Project Project Period Total Estimated Cost (TEC) Cumulative Expenditure (as at 31.12.2025) Revised Budget for 2026 Estimates for 2027 Projection for 2028 Projection for 2029 Ongoing Projects Ministry of Finance, Planning and Economic Development Annual 62Previous page Next page Top
MPIP 2027-2029 · file page 67 printed page 63
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year No Name of the Project Objectives and Scope of the Project Project Period Total Estimated Cost (TEC) Cumulative Expenditure (as at 31.12.2025) Revised Budget for 2026 Estimates for 2027 Projection for 2028 Projection for 2029 Department of Census and Statistics 12 Census of Population and Housing - 2021 Conduct a nationwide census to collect comprehensive demographic, social, economic, and housing data through field enumeration, data processing, analysis, and dissemination for national planning and policymaking. 2019 2029 2,918 3,189 8 13 Economic Census 2025 (Agricultural Activities) Collect, compile, and analyze comprehensive data on agricultural establishments and activities through nationwide surveys, data processing, and statistical reporting to support agricultural and economic planning. 2024 2027 1,959 89 505 1,025 14 Sri Lanka Demographic and Health Survey 2026 (Departmet of Census and Statistics) Conduct a national survey on health, fertility, nutrition, and population indicators. 2026 2028 545 543 195 15 Engineering Design and Construction of High- Rise Offrce Complex at "Sethsiripaya" Premises (Stage 111) The proposed project aims to construct a 25-storey high-rise office complex at the Sethsiripaya premises in Battaramulla . 2027 2029 28,020 6,800 6,720 1,210 New Projects 63Previous page Next page Top
MPIP 2027-2029 · file page 68 printed page 64
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year 1 Digitalization of Terrestrial Television Broadcasting Project (GOSL / JICA) To convert Sri Lanka’s analogue television broadcasting network into a nationwide digital broadcasting system, improving service quality, coverage, and spectrum efficiency. 2021 2028 32,000 390 1,250 2,000 2,800 3,000 2 Developing and Upgrading Printing Process through Obtaining Modern Printing Machineries and equipment within the period of 2026-2030 of the Department of Government Printing To upgrade the printing processes of the through the procurement of modern printing machinery and equipment to improve efficiency, quality, and productivity. 2026 2030 5,991 55 2,306 1,500 2,000 3 Development of Postal Headquarters To modernize the by upgrading buildings, operational facilities, ICT systems, and support infrastructure to improve administrative efficiency and postal service delivery. 2027 2028 411 200 240 New Projects Mass Media Sector: Governance - Mass Media No Name of the Project Objectives and Scope of the Project Project Period Total Estimated Cost (TEC) Cumulative Expenditure (as at 31.12.2025) Revised Budget for 2026 Estimates for 2027 Projection for 2028 Projection for 2029 Ongoing Projects Ministry of Health and Mass Media 64Previous page Next page Top
MPIP 2027-2029 · file page 69 printed page 65
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year Presidential Secretariat 1 Clean Sri Lanka Programme Implement and institutionalize programmes and initiatives under the social, environmental, and ethical pillars to enhance public sector efficiency, civic responsibility, environmental sustainability, accountability, and good governance, thereby promoting sustainable development and national well-being. 2025 2029 33,590 2,653 6,500 6,000 8,625 9,693 2 Development Initiatives Coordination and Monitoring in Presidential Secretariat Strengthen the coordination, monitoring, evaluation, and reporting of national development programmes and priority projects implemented under the Presidential Secretariat. 2025 2030 1,100 51 508 507 916 1,279 4 Facilitation of implementing /monitoring Anti-corruption Act - CIABOC Strengthen the implementation and monitoring of the Anti-Corruption Act through institutional capacity building, digital systems, investigations, public awareness, and stakeholder coordination. 2025 2027 271 21 14 15 19 National Audit Office 5 Sri Lanka Public Financial Management Strengthening Project – National Audit Office Enhance public financial accountability and audit effectiveness through capacity development, audit modernization, digital systems, and institutional strengthening. 2025 2027 1,289 112 371 547 Presidential Secretariat 6 "Pivithuru Purawara” National Waste Management Project Improve solid waste management through waste collection, recycling, disposal facilities, public awareness, and supporting infrastructure in urban and rural areas. 2027 2029 34,315 5,000 7 Central Upper watershed Ecological Restoration and Management Programme To implement ecological restoration and sustainable management measures in the upper watershed areas of the Central Highlands, with the aim of ensuring the long-term sustainability of ecosystems, minimizing environmental degradation, conserving biodiversity, and protecting water resources. 2027 2031 38,697 600 620 650 Commission to Investigate Allegations of Bribery or Corruption (CIABOC) Ongoing Projects New Projects Sector: Governance - Special Spending Units No Name of the Project Objectives and Scope of the Project Project Period Total Estimated Cost (TEC) Cumulative Expenditure (as at 31.12.2025) Revised Budget for 2026 Estimates for 2027 Projection for 2028 Projection for 2029 65Previous page Next page Top
MPIP 2027-2029 · file page 70 printed page 66
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year 1 Partnership and Innovative Financing to Mainstream Biodiversity and Sustainable Land Management in Wet Climatic Zone of Sri Lanka. (Grant -GEF) Conserve globally significant biodiversity by improving land management practices in tea and rubber production areas in the Wet Climate Zone through innovative Public-Private-- Community Partnerships. 2025 2029 798 34 42 54 2 2 2 Development of the First and Second Biennial Transparency Reports and Fourth National Communication of Sri Lanka to the UNFCCC (1st and 2nd BTR, FNC) -(UNDP-Grant) Fulfill Sri Lanka’s UNFCCC reporting obligations through the preparation and submission of BTR1, BTR2 and the Fourth National Communication, while strengthening technical and institutional capacities to integrate climate change considerations into national and sectoral development priorities. 2024 2028 370 15 24 2 3 Regional Project on 'Strengthening Resilience of Vulnerable Communities in Sri Lanka and India to Increased Impacts of Climate Change (ADAPT4R) -(Grant- Adoptation fund) Strengthen access to timely and reliable climate services and enhance the resilience of vulnerable farming households, particularly women, through tailored advisories, improved agricultural practices and climate-resilient livelihoods. 2025 2029 2,044 46 150 343 950 500 4 Integrated Management and Environmentally Sound Disposal of POP Pesticides in the Agriculture Sector and Mercury and Waste in the Healthcare Sector in Sri Lanka (Grant- UNDP) Strengthen the policy, regulatory and institutional framework for the environmentally sound management and disposal of POPs, mercury and hazardous chemicals and wastes, while improving healthcare waste management and promoting knowledge sharing and effective project monitoring and evaluation. 2025 2029 1,512 8 121 100 600 600 5 Promoting a Circular Economy in the food sector -Grant Enhance the recovery, processing, and supply of edible and safe food surplus/waste to benefit vulnerable consumers and food producers.(Project proposal has not been submitted to NPD) 2025 2027 1,970 27 27 128 6 Mobilizing International and Domestic Climate Finance and Private Investments for Climate Resilience in Sri Lanka (Grant-GCF) Strengthen Sri Lanka's capacity to access and utilize climate finance, particularly from the Green Climate Fund (GCF).addressit es readiness gaps and promotes an inclusive, sustainable climate finance ecosystem aligned with national climate goals. 2026 2027 295 227 7 Eu Green policy Dialogue Facility Project (Grant-EU) Support Sri Lanka’s transition towards a green, circular, carbon-neutral and socially inclusive economy, contributing to sustainable economic recovery and long-term economic resilience. 2025 2029 1,942 1 11 1 Climate Smart Sustainable Cities (Grant -GEF) The project aims to demonstrate an integrated approach to climate-resilient urban development by combining wetland conservation, renewable energy, and electric mobility solutions. 2027 2030 1,596 25 392 242 2 Tourism for Heritage, Resilience, Inclusion, and Value-driven Employment Project (THRIVE) Nature -Grant Project (World Bank) This project-preparation grant designed to lay the technical and institutional foundations for a future larger tourism initiative. The project will finance critical preparatory work, including biodiversity assessments, carrying-capacity analyses, nature-based tourism (NBT) plans, and detailed engineering designs for selected wildlife, forest, and coastal sites. 2026 2028 325 260 28 3 Construction of the Head Office Building for the Water Resources Board The project proposes construction of a five-story Head Office in Battaramulla, incorporating administrative offices, laboratory facilities, training and data centers, secure storage, and parking with flood-resilient design. 2027 2029 985 300 685 New Projects Ongoing Projects Ministry of Environemnt Sector: Environment and Disaster Management - Environment No Name of the Project Objectives and Scope of the Project Project Period Total Estimated Cost (TEC) Cumulative Expenditure (as at 31.12.2025) Revised Budget for 2026 Estimates for 2027 Projection for 2028 Projection for 2029 66Previous page Next page Top
MPIP 2027-2029 · file page 71 printed page 67
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year No Name of the Project Objectives and Scope of the Project Project Period Total Estimated Cost (TEC) Cumulative Expenditure (as at 31.12.2025) Revised Budget for 2026 Estimates for 2027 Projection for 2028 Projection for 2029 4 Promoting Sustainable Economic Benefits through the Conservation of Critical Biodiversity and Ecosystem Services in the Eastern and Southern Coastal Regions of Sri Lanka (Grant -GEF) This project aims to implement integrated terrestrial, coastal, and marine management across Batticaloa, Ampara, and Hambantota to conserve biodiversity and support local economies. 2027 2031 1,352 10 335 335 5 Natural Capital valuse of Coastal and Marine Ecosystems in Sri Lanka integarted in to sustainable Development Development Planning (Grant -GEF) Strengthen biodiversity mainstreaming in planning and decision making and improved resource targeting for biodiversity conservation using Natural Capital Assessment, Accounting and Management effectiveness tracking. This proposed initiative will work in four project sites including coastal areas in the Southern, Northern, North Western and Eastern Provinces. 2026 2029 914 6 150 450 308 67Previous page Next page Top
MPIP 2027-2029 · file page 72 printed page 68
Major Public Investment Project 2027-2029
Started/
Expected
Starting Year
Expected
Completion
Year
1
Resettlement of Displaced People Due to Landslide
threats and Landslides
Construction of houses for displaced people due to landslide threats and landslides
2017
2028
21,050 6,427
3,000
2,000
2,000
2
Reduction of Landslide Vulnerability by Mitigation
Measures (Loan- AIIB + Domestic)
Reduce risk and damage from landslides in Sri Lanka through the implementation of
physical mitigation measures based on investigation/assessment and improvement of
planning, regulation and instruments associated with landslide management.
2019
2028
27,452
11,897
7,070
3,648
2,152
3
Doppler Weather Radar Systems (Grant-JICA)
Strenthen capability for real-time rainfall monitoring by establishment of a Doppler
Weather Radar Network, thereby contributing to mitigation of damages by weather-related
disasters.
2019
2027
5,203
106
3,747
348
5
1
Implementation of Soil Conservation and Bioengineering
Measures for Slope Stabilization in Cyclone Ditwah-
Affected Landslide Sites through a Public-Private
Partnership Model
Stabilize 800–1,000 hectares of landslide-prone areas using a combination of nature-based
and engineering solutions, including vegetation, agroforestry, gabions, check dams, and
drainage systems.
2027
2029
257
125
100
32
2
Climate-Informed Landslide Risk Mitigation Toolbox for
Sri Lanka (LaRiMiT-SL) - Phase 1 of SAFE LAND - Sri
Lanka
Establish a web-based landslide risk mitigation decision-support toolbox (LaRiMiT-SL) for
Sri Lanka, adapted from a proven Norwegian platform. It integrates climate-adjusted
rainfall thresholds, national terrain data, and a catalog of 60–80 mitigation options
(including Nature-based Solutions).
2027
2028
450
26
24
3
Strengthening of emergency response and Early warning
capacity by providing equipment
Strengthen emergency response and early warning capacity through the provision of
essential disaster response equipment such as rescue boats, generators, chainsaws, drones,
water tanks, and water purification units to District Disaster Management Coordination
Units (DDMCUs).
2027
2029
2,143
500
1,000
643
4
Establish Multi Hazard Warning Communication System
Rehabilitate 77 existing coastal early warning towers and install 120 new inland towers,
covering all 25 districts and high-risk flood, landslide, cyclone, and tsunami-prone areas.
The system will utilize a resilient communication network with VHF, GSM/LTE, and
satellite redundancy, supported by automated monitoring and backup power systems to
ensure reliable operation during emergencies.
2027
2029
1,610
500
550
560
5
Establishment of a Nationwide Mission-critical VHF
Digital Radio Communication system For Disaster
management
Replaces Sri Lanka’s outdated analog radio system with a nationwide, secure VHF Digital
Mobile Radio (DMR) trunking network to modernize emergency communications. It
installs over 40 high-altitude repeater stations and connects local command centers to
deliver encrypted voice, data, and real-time GPS tracking across all 25 districts. The
primary goal is to close the "last-mile" warning gap by integrating with Multi-Hazard Early
Warning towers to ensure uninterrupted alert dissemination to vulnerable communities
during disaster-induced commercial network failures.
2027
2029
976
670
200
105
6
Disaster Resilient safety Centers Renovation Programe
Renovate and upgrade 2,500 to 2,600 existing government-owned safety centres across all
25 districts. Major activities include structural and roof repairs, upgrading water,
sanitation, and hygiene (WASH) systems, installing solar PV systems with battery backup,
enhancing disability accessibility (ramps and handrails), supplying emergency response
kits, and conducting local shelter management training.
2027
2029
7,500
1,000
3,000
3,500
Projection for
2028
Projection for
2029
Sector: Environment and Disaster Management - Disaster Management
New Projects
Ongoing Projects
Ministry of Defence (Disaster Management)
No
Name of the Project
Objectives and Scope of the Project
Project Period
Total
Estimated Cost
(TEC)
Cumulative
Expenditure (as
at 31.12.2025)
Revised Budget
for 2026
Estimates for
2027
68Previous page Next page TopMPIP 2027-2029 · file page 73 printed page 69
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year 1 Intergrated Rural Development Programme (Praja shakthi) To alleviate multi-dimensional poverty in Sri Lanka focusing especially on rural and estates areas through an integrated development initiative. 2026 2030 200,805 25,000 25,000 33,330 40,115 2 Social Protection Project (WB-GOSL) To promote sustainable livelihoods of 10,975 families of poor and severely poor categories of "Aswesuma" cash transfer beneficiaries through a pilot program 2023 2027 2,560 32 1,105 1,339 3 Food Relief Programme (WFP) To address immediate food and nutrition needs while fostering long-term, sustainable solutions through four key strategic outcomes ; Crisis response, Improved Nutrition, Resilience Building and Institutional Strengthening. 2023 2027 31,933 6,958 3,140 2,401 4 Promating Resilience and Opportunity for Inclusive Recovery Programme (GOSL/ADB) To expand the coverage of the National Empowerment program by at least 30,000 households and improve the quality of employment and livelihood services, to improve access to social and elderly care through the establishment of at least 5 model elderly care centers that integrate community based services and to strengthen Sri Lanka’s institutional capacity, governance and management information system for inclusive, gender-responsive, and adaptive social protection system. 2026 2030 33,600 200 200 3,846 5,390 5 Development of Day Care Centers To provide daycare and skill development for persons with disabilities who have parents/guardians, to provide mental and physical relief to the parents/ guardians during the daytime and to encourage the parents/guardians of persons with disabilities to engage in productive economic activities. 2026 2030 1,503 391 530 540 42 6 Social Protection Project (WB-GOSL) To ensure the effective project implementation, strengthening the social protection system and it's key delivery systems 2023 2027 2,558 322 336 200 1 Finalize the construction of the seeduwa building complex phase I belong to the National Institute of Social Development. To complete the remaining activities of the partially completed building complex, landscaping the premises, and to procure equipment. 2027 366 365 2 Development of the Pannala Welcome Village Elderly Home under the National Elderly Secretariat Development of the Pannala Welcome Village Elderly Home into a model elderly care center by renovating and expanding the current building complex, which is a government-run residential care facility. 2027 2030 412 100 110 120 3 Transport facilities for persons with disabilities at daycare center To provide safe, reliable, and accessible transportation for children with disabilities between their homes and skill development daycare centers by purchasing 25 disability-friendly vehicles for 25 districts. 2027 2031 549 200 220 129 4 Empowerment programme of low income families To enhance the socio-economic and psychological well-being of 1.2 million low- income families by increasing the existing income of selected families by 20% per annum and improving their psychological well-being. 2027 2030 97,270 4,500 5,000 5,500 Sector: Social Protection Cumulative Expenditure (as at 31.12.2025) Project Period Total Estimated Cost (TEC) Name of the Project No Objectives and Scope of the Project Revised Budget for 2026 Estimates for 2027 Projection for 2028 Projection for 2029 Ministry of Rural Development, Social Security and Community Empowernment New Projects Ongoing Projects Ministry of Rural Development, Social Security and Community Empowernment Ministry of Finance, Planning and Economic Development 69Previous page Next page Top
MPIP 2027-2029 · file page 74 printed page 70
Major Public Investment Project 2027-2029 Started/ Expected Starting Year Expected Completion Year 1 Rural Infrastructure Development Project in Emerging Region – RIDEP Improve living standards and develop local livelihoods by upgrading basic infrastructure, including rural roads, potable water supplies, and small-to-medium-scale irrigation systems, particularly in under-developed and previously affected provinces of Sri Lanka 2017 2027 20,622 7,654 8,000 7,700 2 Establishment of IT Master Plan on Tax Administration and Implementation of E- Tax System for Colombo Municipal Council Project (KOICA) Modernize tax administration through an IT Master Plan and implement an E-Tax System to improve efficiency, transparency, and public trust, ultimately enhancing local governance and taxpayer satisfaction in Colombo 2025 2027 3,112 230 230 3 Local Authority Small Bridges Sustainable Improvement Project Enhance community access, improve road safety, strengthen local livelihoods, and bolster environmental resilience by protecting small bridges from natural disasters, particularly flooding 2026 2029 6,866 1,050 2,540 1,100 1,000 1 Local Authority Drainage Sustainable Improvement Project Upgrade storm-water drainage networks in 23 Local Authorities across 9 provinces and 17 districts to reduce urban flooding, protect road infrastructure, improve environmental sanitation and reduce public-health risks. 2027 2030 1,591 300 400 400 2 Local Authorities Revenue Enhancement Project (LGREP) Strengthen the financial sustainability of selected Local Authorities through tourism-related infrastructure, revenue-generating assets, improved revenue collection systems, asset management and institutional capacity building. 2027 2030 40,226 1,000 15,000 15,000 3 Local Authority Public Convenience Center Sustainable Improvement Project Improve public sanitation facilities across 130 Local Authorities in all 9 provinces, covering 289 public sanitation nodes, comprising 159 new Public Convenience Centers and 130 upgraded existing facilities. Standardized facilities will include gender-segregated toilets, urinals, hand-washing facilities, disability-accessible units, changing rooms, caretaker/ticket counters, children's areas and parking facilities. 2027 2029 2,795 300 1,300 1,195 4 Local Authority Water Supply Sustainable Improvement Project (LAWSIP) Rehabilitate and improve approximately 235 Local Authority-managed water supply schemes, including water sources, treatment, storage and distribution facilities, NRW reduction, O&M equipment and institutional capacity development. 2027 2028 1,863 300 1,563 Sector: Regional Development Cumulative Expenditure (as at 31.12.2025) Project Period Total Estimated Cost (TEC) Name of the Project Ongoing Projects Ministry of Public Administration, Provincial Councils and Local Government New Projects No Objectives and Scope of the Project Revised Budget for 2026 Estimates for 2027 Projection for 2028 Projection for 2029 70Previous page Top